IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v40y1993i2p175-192.html
   My bibliography  Save this article

A single‐machine replacement model with learning

Author

Listed:
  • Suresh Chand
  • Tim McClurg
  • Jim Ward

Abstract

The replacement or upgrade of productive resources over time is an important decision for a manufacturing organization. The type of technology used in the productive resources determines how effectively the manufacturing operations can support the product and marketing strategy of the organization. Increasing operating costs (cost of maintenance, labor, and depreciation) over time force manufacturing organizations to periodically consider replacement or upgrade of their existing productive resources. We assume that there is a setup cost associated with the replacement of a machine, and that the setup cost is a nonincreasing function of the number of replacements made so far due to learning in setups. The operating cost of a newer machine is assumed to be lower than the operating cost of an older machine in any given period, except perhaps in the first period of operation of the new machine when the cost could be unusually high due to higher initial depreciation. A forward dynamic programming algorithm is developed which can be used to solve finite‐horizon problems. We develop procedures to find decision and forecast horizons such that choices made during the decision horizon based only on information over the forecast horizon are also optimal for any longer horizon problem. Thus, we are able to obtain optimal results for what is effectively an infinite‐horizon problem while only requiring data over a finite period of time. We present a numerical example to illustrate the decision/forecast horizon procedure, as well as a study of the effects of considering learning in making a series of machine replacement decisions. © 1993 John Wiley & Sons. Inc.

Suggested Citation

  • Suresh Chand & Tim McClurg & Jim Ward, 1993. "A single‐machine replacement model with learning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(2), pages 175-192, March.
  • Handle: RePEc:wly:navres:v:40:y:1993:i:2:p:175-192
    DOI: 10.1002/1520-6750(199303)40:23.0.CO;2-Q
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/1520-6750(199303)40:23.0.CO;2-Q
    Download Restriction: no

    File URL: https://libkey.io/10.1002/1520-6750(199303)40:23.0.CO;2-Q?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Suresh Sethi & Suresh Chand, 1979. "Planning Horizon Procedures for Machine Replacement Models," Management Science, INFORMS, vol. 25(2), pages 140-151, February.
    2. Suresh Chand & Suresh P. Sethi, 1990. "A Dynamic Lot Sizing Model with Learning in Setups," Operations Research, INFORMS, vol. 38(4), pages 644-655, August.
    3. S. Bylka & S. Sethi & G. Sorger, 1992. "Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(4), pages 487-507, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tim McClurg & Suresh Chand, 2002. "A parallel machine replacement model," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(3), pages 275-287, April.
    2. M. S. Krishnan & Tridas Mukhopadhyay & Charles H. Kriebel, 2004. "A Decision Model for Software Maintenance," Information Systems Research, INFORMS, vol. 15(4), pages 396-412, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Yu. Yatsenko & N. Hritonenko, 2007. "Network economics and optimal replacement of age-structured IT capital," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 65(3), pages 483-497, June.
    2. Yatsenko, Yuri & Hritonenko, Natali, 2008. "Properties of optimal service life under technological change," International Journal of Production Economics, Elsevier, vol. 114(1), pages 230-238, July.
    3. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
    4. A. Bensoussan & Q. Feng & S. P. Sethi, 2022. "Integrating equipment investment strategy with maintenance operations under uncertain failures," Annals of Operations Research, Springer, vol. 317(2), pages 353-386, October.
    5. Awi Federgruen & Michal Tzur, 1996. "Detection of minimal forecast horizons in dynamic programs with multiple indicators of the future," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 169-189, March.
    6. Ali Dogramaci & Nelson M. Fraiman, 2004. "Replacement Decisions with Maintenance Under Uncertainty: An Imbedded Optimal Control Model," Operations Research, INFORMS, vol. 52(5), pages 785-794, October.
    7. Vernon Ning Hsu, 2000. "Dynamic Economic Lot Size Model with Perishable Inventory," Management Science, INFORMS, vol. 46(8), pages 1159-1169, August.
    8. Wallace J. Hopp & Suresh K. Nair, 1991. "Timing replacement decisions under discontinuous technological change," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(2), pages 203-220, April.
    9. Bauer, L. & Mumey, G.A. & Lohr, W., 1989. "Economic Replacement Strategies for Dairy Cattle," Project Report Series 232069, University of Alberta, Department of Resource Economics and Environmental Sociology.
    10. Ji, Xiang & Li, Guo & Wang, Zhaohua, 2017. "Impact of emission regulation policies on Chinese power firms’ reusable environmental investments and sustainable operations," Energy Policy, Elsevier, vol. 108(C), pages 163-177.
    11. Yatsenko, Yuri & Hritonenko, Natali, 2017. "Machine replacement under evolving deterministic and stochastic costs," International Journal of Production Economics, Elsevier, vol. 193(C), pages 491-501.
    12. Chiu, Huan Neng & Chen, Hsin Min, 2005. "An optimal algorithm for solving the dynamic lot-sizing model with learning and forgetting in setups and production," International Journal of Production Economics, Elsevier, vol. 95(2), pages 179-193, February.
    13. Voros, Jozsef, 1995. "Setup cost stability region for the multi-level dynamic lot sizing problem," European Journal of Operational Research, Elsevier, vol. 87(1), pages 132-141, November.
    14. Suresh P. Sethi & Sushil Gupta & Vipin K. Agrawal & Vijay K. Agrawal, 2022. "Nobel laureates’ contributions to and impacts on operations management," Production and Operations Management, Production and Operations Management Society, vol. 31(12), pages 4283-4303, December.
    15. Tzvi Goldstein & Shaul P. Ladany & Abraham Mehrez, 1988. "A discounted machine‐replacement model with an expected future technological breakthrough," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(2), pages 209-220, April.
    16. Yatsenko, Yuri & Hritonenko, Natali, 2015. "Algorithms for asset replacement under limited technological forecast," International Journal of Production Economics, Elsevier, vol. 160(C), pages 26-33.
    17. Chung-Lun Li & Vernon Ning Hsu & Wen-Qiang Xiao, 2004. "Dynamic Lot Sizing with Batch Ordering and Truckload Discounts," Operations Research, INFORMS, vol. 52(4), pages 639-654, August.
    18. Su, Chao-Ton & Wu, Sung-Chi & Chang, Cheng-Chang, 2000. "Multiaction maintenance subject to action-dependent risk and stochastic failure," European Journal of Operational Research, Elsevier, vol. 125(1), pages 133-148, August.
    19. Yatsenko, Yuri & Hritonenko, Natali, 2011. "Economic life replacement under improving technology," International Journal of Production Economics, Elsevier, vol. 133(2), pages 596-602, October.
    20. Philip C. Jones & James L. Zydiak & Wallace J. Hopp, 1991. "Parallel machine replacement," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(3), pages 351-365, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:40:y:1993:i:2:p:175-192. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.