IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v38y1991i2p261-271.html
   My bibliography  Save this article

Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs

Author

Listed:
  • I. Adiri
  • E. Frostig
  • A. H. G. Rinnooy Kan

Abstract

Jobs with known processing times and due dates have to be processed on a machine which is subject to a single breakdown. The moment of breakdown and the repair time are independent random variables. Two cases are distinguished with reference to the processing time preempted by the breakdown (no other preemptions are allowed): (i) resumption without time losses and (ii) restart from the beginning. Under certain compatible conditions, we find the policies which minimize stochastically the number of tardy jobs.

Suggested Citation

  • I. Adiri & E. Frostig & A. H. G. Rinnooy Kan, 1991. "Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(2), pages 261-271, April.
  • Handle: RePEc:wly:navres:v:38:y:1991:i:2:p:261-271
    DOI: 10.1002/1520-6750(199104)38:23.0.CO;2-I
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/1520-6750(199104)38:23.0.CO;2-I
    Download Restriction: no

    File URL: https://libkey.io/10.1002/1520-6750(199104)38:23.0.CO;2-I?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Michael Pinedo, 1983. "Stochastic Scheduling with Release Dates and Due Dates," Operations Research, INFORMS, vol. 31(3), pages 559-572, June.
    2. Hiroshi Kise & Toshihide Ibaraki & Hisashi Mine, 1978. "A Solvable Case of the One-Machine Scheduling Problem with Ready and Due Times," Operations Research, INFORMS, vol. 26(1), pages 121-126, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yarlin Kuo & Zi‐Ann Chang, 2007. "Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(6), pages 602-614, September.
    2. Xiaoqiang Cai & Xianyi Wu & Xian Zhou, 2009. "Stochastic Scheduling Subject to Preemptive-Repeat Breakdowns with Incomplete Information," Operations Research, INFORMS, vol. 57(5), pages 1236-1249, October.
    3. Xiaoqiang Cai & Xianyi Wu & Xian Zhou, 2021. "Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns," Annals of Operations Research, Springer, vol. 298(1), pages 43-64, March.
    4. Xiaoqiang Cai & Xiaoqian Sun & Xian Zhou, 2004. "Stochastic scheduling subject to machine breakdowns: The preemptive‐repeat model with discounted reward and other criteria," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(6), pages 800-817, September.
    5. W J Chen, 2006. "Minimizing total flow time in the single-machine scheduling problem with periodic maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(4), pages 410-415, April.
    6. Chen, Wen-Jinn, 2009. "Minimizing number of tardy jobs on a single machine subject to periodic maintenance," Omega, Elsevier, vol. 37(3), pages 591-599, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Cai, X. & Lum, V. Y. S. & Chan, J. M. T., 1997. "Scheduling about a common due date with kob-dependent asymmetric earliness and tardiness penalties," European Journal of Operational Research, Elsevier, vol. 98(1), pages 154-168, April.
    2. Xiaoqiang Cai & Sean Zhou, 1999. "Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs," Operations Research, INFORMS, vol. 47(3), pages 422-437, June.
    3. Golenko-Ginzburg, Dimitri & Gonik, Aharon, 1997. "Using "look ahead" techniques in job-shop scheduling with random operations," International Journal of Production Economics, Elsevier, vol. 50(1), pages 13-22, May.
    4. Gupta, Jatinder N. D. & Ho, Johnny C., 1996. "Scheduling with two job classes and setup times to minimize the number of tardy jobs," International Journal of Production Economics, Elsevier, vol. 42(3), pages 205-216, April.
    5. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    6. Brian C. Dean & Michel X. Goemans & Jan Vondrák, 2008. "Approximating the Stochastic Knapsack Problem: The Benefit of Adaptivity," Mathematics of Operations Research, INFORMS, vol. 33(4), pages 945-964, November.
    7. Nicole Megow & Tjark Vredeveld, 2014. "A Tight 2-Approximation for Preemptive Stochastic Scheduling," Mathematics of Operations Research, INFORMS, vol. 39(4), pages 1297-1310, November.
    8. Sevaux, Marc & Dauzere-Peres, Stephane, 2003. "Genetic algorithms to minimize the weighted number of late jobs on a single machine," European Journal of Operational Research, Elsevier, vol. 151(2), pages 296-306, December.
    9. Marban, S. & Rutten, C. & Vredeveld, T., 2010. "Asymptotic optimality of SEPT in Bayesian scheduling," Research Memorandum 050, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
    10. Baptiste, Philippe & Peridy, Laurent & Pinson, Eric, 2003. "A branch and bound to minimize the number of late jobs on a single machine with release time constraints," European Journal of Operational Research, Elsevier, vol. 144(1), pages 1-11, January.
    11. Golenko-Ginzburg, Dimitri & Gonik, Aharon, 2002. "Optimal job-shop scheduling with random operations and cost objectives," International Journal of Production Economics, Elsevier, vol. 76(2), pages 147-157, March.
    12. Xavier Schepler & Nabil Absi & Dominique Feillet & Eric Sanlaville, 2019. "The stochastic discrete berth allocation problem," EURO Journal on Transportation and Logistics, Springer;EURO - The Association of European Operational Research Societies, vol. 8(4), pages 363-396, December.
    13. Marbán Sebastián & Rutten Cyriel & Vredeveld Tjark, 2010. "Asymptotic optimality of SEPT in Bayesian Scheduling," Research Memorandum 051, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
    14. Gio Kao & Edward Sewell & Sheldon Jacobson & Shane Hall, 2012. "New dominance rules and exploration strategies for the 1|r i |∑U i scheduling problem," Computational Optimization and Applications, Springer, vol. 51(3), pages 1253-1274, April.
    15. Jang, Wooseung, 2002. "Dynamic scheduling of stochastic jobs on a single machine," European Journal of Operational Research, Elsevier, vol. 138(3), pages 518-530, May.
    16. Detienne, Boris, 2014. "A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints," European Journal of Operational Research, Elsevier, vol. 235(3), pages 540-552.
    17. Golenko-Ginzburg, Dimitri & Gonik, Aharon, 1997. "Job-shop resource scheduling via simulating random operations," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 44(5), pages 427-440.
    18. Zhankun Sun & Nilay Tanık Argon & Serhan Ziya, 2022. "When to Triage in Service Systems with Hidden Customer Class Identities?," Production and Operations Management, Production and Operations Management Society, vol. 31(1), pages 172-193, January.
    19. Federico Malucelli & Sara Nicoloso, 2007. "Shiftable intervals," Annals of Operations Research, Springer, vol. 150(1), pages 137-157, March.
    20. Golenko-Ginzburg, Dimitri & Kesler, Shmuel & Landsman, Zinoviy, 1995. "Industrial job-shop scheduling with random operations and different priorities," International Journal of Production Economics, Elsevier, vol. 40(2-3), pages 185-195, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:38:y:1991:i:2:p:261-271. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.