Stochastic Scheduling Subject to Preemptive-Repeat Breakdowns with Incomplete Information
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.1080.0660
Download full text from publisher
References listed on IDEAS
- Hongtao Zhang & Stephen C. Graves, 1997. "Cyclic Scheduling in a Stochastic Environment," Operations Research, INFORMS, vol. 45(6), pages 894-903, December.
- Xiaoqiang Cai & Sean Zhou, 1999. "Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs," Operations Research, INFORMS, vol. 47(3), pages 422-437, June.
- J. Birge & J. B. G. Frenk & J. Mittenthal & A. H. G. Rinnooy Kan, 1990. "Single‐machine scheduling subject to stochastic breakdowns," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(5), pages 661-677, October.
- Xiaoqiang Cai & Xiaoqian Sun & Xian Zhou, 2004. "Stochastic scheduling subject to machine breakdowns: The preemptive‐repeat model with discounted reward and other criteria," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(6), pages 800-817, September.
- Lee, Chung-Yee & Lin, Chen-Sin, 2001. "Single-machine scheduling with maintenance and repair rate-modifying activities," European Journal of Operational Research, Elsevier, vol. 135(3), pages 493-513, December.
- I. Adiri & E. Frostig & A. H. G. Rinnooy Kan, 1991. "Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(2), pages 261-271, April.
- Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Batching with Machine Breakdowns and Safety Stocks," Operations Research, INFORMS, vol. 40(5), pages 959-971, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Creemers, Stefan, 2019. "The preemptive stochastic resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 277(1), pages 238-247.
- Stefan Creemers, 2019. "The preemptive stochastic resource-constrained project scheduling problem," Post-Print hal-02992618, HAL.
- Shi, Xiutian & Shen, Houcai & Wu, Ting & Cheng, T.C.E., 2014. "Production planning and pricing policy in a make-to-stock system with uncertain demand subject to machine breakdowns," European Journal of Operational Research, Elsevier, vol. 238(1), pages 122-129.
- Dana G. Popescu & Pascale Crama, 2016. "Ad Revenue Optimization in Live Broadcasting," Management Science, INFORMS, vol. 62(4), pages 1145-1164, April.
- Dmitry Ivanov & Alexandre Dolgui & Boris Sokolov & Frank Werner, 2016. "Schedule robustness analysis with the help of attainable sets in continuous flow problem under capacity disruptions," International Journal of Production Research, Taylor & Francis Journals, vol. 54(11), pages 3397-3413, June.
- Li, Dong & Glazebrook, Kevin D., 2011. "A Bayesian approach to the triage problem with imperfect classification," European Journal of Operational Research, Elsevier, vol. 215(1), pages 169-180, November.
- Xiaoqiang Cai & Xianyi Wu & Xian Zhou, 2021. "Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns," Annals of Operations Research, Springer, vol. 298(1), pages 43-64, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Xiaoqiang Cai & Xianyi Wu & Xian Zhou, 2021. "Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns," Annals of Operations Research, Springer, vol. 298(1), pages 43-64, March.
- Xiaoqiang Cai & Xiaoqian Sun & Xian Zhou, 2004. "Stochastic scheduling subject to machine breakdowns: The preemptive‐repeat model with discounted reward and other criteria," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(6), pages 800-817, September.
- Yarlin Kuo & Zi‐Ann Chang, 2007. "Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(6), pages 602-614, September.
- W J Chen, 2006. "Minimizing total flow time in the single-machine scheduling problem with periodic maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(4), pages 410-415, April.
- Chen, Wen-Jinn, 2009. "Minimizing number of tardy jobs on a single machine subject to periodic maintenance," Omega, Elsevier, vol. 37(3), pages 591-599, June.
- Mohebbi, E., 2008. "A note on a production control model for a facility with limited storage capacity in a random environment," European Journal of Operational Research, Elsevier, vol. 190(2), pages 562-570, October.
- Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
- Lodree Jr., Emmett J. & Geiger, Christopher D., 2010. "A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration," European Journal of Operational Research, Elsevier, vol. 201(2), pages 644-648, March.
- Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
- Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
- Zhenpeng Li & Congdian Cheng, 2023. "The Expected Competitive Ratio on a Kind of Stochastic-Online Flowtime Scheduling with Machine Subject to an Uncertain Breakdown," Mathematics, MDPI, vol. 11(11), pages 1-12, May.
- Xinyu Sun & Tao Liu & Xin-Na Geng & Yang Hu & Jing-Xiao Xu, 2023. "Optimization of scheduling problems with deterioration effects and an optional maintenance activity," Journal of Scheduling, Springer, vol. 26(3), pages 251-266, June.
- Wolter, Anja & Helber, Stefan, 2013. "Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear," Hannover Economic Papers (HEP) dp-522, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- Ait-El-Cadi, Abdessamad & Gharbi, Ali & Dhouib, Karem & Artiba, Abdelhakim, 2021. "Integrated production, maintenance and quality control policy for unreliable manufacturing systems under dynamic inspection," International Journal of Production Economics, Elsevier, vol. 236(C).
- Hoyningen-Huene, Wiebke von, 2015. "Heuristics for an Integrated Maintenance and Production Scheduling Problem on Parallel Machines with Stochastic Failures and Non-Resumable Jobs," EconStor Preprints 112746, ZBW - Leibniz Information Centre for Economics.
- von Hoyningen-Huene, W. & Kiesmüller, G.P., 2015. "Evaluation of the expected makespan of a set of non-resumable jobs on parallel machines with stochastic failures," European Journal of Operational Research, Elsevier, vol. 240(2), pages 439-446.
- Shijin Wang & Ming Liu, 2016. "Two-machine flow shop scheduling integrated with preventive maintenance planning," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(3), pages 672-690, February.
- J S Chen, 2006. "Single-machine scheduling with flexible and periodic maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(6), pages 703-710, June.
- Huynh, Candice H. & So, Kut C. & Gurnani, Haresh, 2016. "Managing a closed-loop supply system with random returns and a cyclic delivery schedule," European Journal of Operational Research, Elsevier, vol. 255(3), pages 787-796.
- G Mosheiov & J B Sidney, 2010. "Scheduling a deteriorating maintenance activity on a single machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 882-887, May.
More about this item
Keywords
production/scheduling; stochastic; learning; probability; stochastic model applications; dynamic programming/optimal control; semi-Markov;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:57:y:2009:i:5:p:1236-1249. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.