IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v19y2001i4p365-377.html
   My bibliography  Save this article

Stockyard layout planning in precast concrete products industry: a case study and proposed framework

Author

Listed:
  • Ramesh Marasini
  • Nashwan Dawood
  • Brian Hobbs

Abstract

Management of the stockyard layout in the precast concrete products industry is very important for efficient storage and dispatch of the concrete products. The industry uses the make-to-stock principle in production to meet the seasonal demand (high in summer and low in winter) from the construction industry. In order to stabilize production output and cater for the huge demand in summer, stock is built up during the winter and spring period. The concrete products are kept in stock for 4-5 months. As 2000≈3000 different precast concrete products are produced, and the products have different size, weight and handling requirements, determination of appropriate stockyard location for the products constitutes a complex process. This paper describes some ongoing research that is focused on identifying the appropriate methodology for designing and managing the stockyard layout that ensures efficient storage and dispatch of products, and provides ease of rotation of products within the yard. An integrated simulation model employing artificial intelligence methods has been proposed to evaluate 'what-if' scenarios and recommend a suitable methodology for the management of stockyard space for precast concrete products. This paper presents the findings from a case study, which includes work-study, frequency analysis of historical order data. The paper also introduces the specifications, processes and outline prototype of the proposed model. A general purpose simulation language (SIMAN) based software, 'Arena 4.0' (Systems Modelling Corporation), has been selected to develop the prototype simulation model and ILOG views and rules have been considered to generate a knowledge-based stockyard layout.

Suggested Citation

  • Ramesh Marasini & Nashwan Dawood & Brian Hobbs, 2001. "Stockyard layout planning in precast concrete products industry: a case study and proposed framework," Construction Management and Economics, Taylor & Francis Journals, vol. 19(4), pages 365-377.
  • Handle: RePEc:taf:conmgt:v:19:y:2001:i:4:p:365-377
    DOI: 10.1080/01446190110035636
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190110035636
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190110035636?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Gordon C. Armour & Elwood S. Buffa, 1963. "A Heuristic Algorithm and Simulation Approach to Relative Location of Facilities," Management Science, INFORMS, vol. 9(2), pages 294-309, January.
    2. Kusiak, Andrew & Heragu, Sunderesh S., 1987. "The facility layout problem," European Journal of Operational Research, Elsevier, vol. 29(3), pages 229-251, June.
    3. F. Robert Jacobs, 1987. "A Layout Planning System with Multiple Criteria and a Variable Domain Representation," Management Science, INFORMS, vol. 33(8), pages 1020-1034, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lin, Jin-Ling & Foote, Bobbie & Pulat, Simin & Chang, Chir-Ho & Cheung, John Y., 1996. "Solving the failure-to-fit problem for plant layout: By changing department shapes and sizes," European Journal of Operational Research, Elsevier, vol. 89(1), pages 135-146, February.
    2. Zhongwei Zhang & Lihui Wu & Zhaoyun Wu & Wenqiang Zhang & Shun Jia & Tao Peng, 2022. "Energy-Saving Oriented Manufacturing Workshop Facility Layout: A Solution Approach Using Multi-Objective Particle Swarm Optimization," Sustainability, MDPI, vol. 14(5), pages 1-28, February.
    3. Gomez, A. & Fernandez, Q. I. & De la Fuente Garcia, D. & Garcia, P. J., 2003. "Using genetic algorithms to resolve layout problems in facilities where there are aisles," International Journal of Production Economics, Elsevier, vol. 84(3), pages 271-282, June.
    4. Jerzy Grobelny & Rafal Michalski, 2016. "Experimental examination of facilities layout problems in logistics systems including objects with diverse sizes and shapes," WORking papers in Management Science (WORMS) WORMS/16/12, Department of Operations Research and Business Intelligence, Wroclaw University of Science and Technology.
    5. Gonçalves, José Fernando & Resende, Mauricio G.C., 2015. "A biased random-key genetic algorithm for the unequal area facility layout problem," European Journal of Operational Research, Elsevier, vol. 246(1), pages 86-107.
    6. Stefan Helber & Daniel Böhme & Farid Oucherif & Svenja Lagershausen & Steffen Kasper, 2016. "A hierarchical facility layout planning approach for large and complex hospitals," Flexible Services and Manufacturing Journal, Springer, vol. 28(1), pages 5-29, June.
    7. Ravi Kumar, K. & Hadjinicola, George C. & Lin, Ting-li, 1995. "A heuristic procedure for the single-row facility layout problem," European Journal of Operational Research, Elsevier, vol. 87(1), pages 65-73, November.
    8. Minhee Kim & Junjae Chae, 2019. "Monarch Butterfly Optimization for Facility Layout Design Based on a Single Loop Material Handling Path," Mathematics, MDPI, vol. 7(2), pages 1-21, February.
    9. Kazuhiro Tsuchiya & Sunil Bharitkar & Yoshiyasu Takefuji, 1996. "A neural network approach to facility layout problems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 556-563, March.
    10. Jerzy Grobelny & Rafal Michalski, 2016. "A concept of a flexible approach to the facilities layout problems in logistics systems," WORking papers in Management Science (WORMS) WORMS/16/11, Department of Operations Research and Business Intelligence, Wroclaw University of Science and Technology.
    11. Ignacio Castillo & Thaddeus Sim, 2004. "A spring-embedding approach for the facility layout problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(1), pages 73-81, January.
    12. Chiang, Wen-Chyuan & Chiang, Chi, 1998. "Intelligent local search strategies for solving facility layout problems with the quadratic assignment problem formulation," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 457-488, April.
    13. Balakrishnan, Jaydeep & Cheng, Chun Hung, 1998. "Dynamic layout algorithms: a state-of-the-art survey," Omega, Elsevier, vol. 26(4), pages 507-521, August.
    14. Ioannou, George, 2006. "Time-phased creation of hybrid manufacturing systems," International Journal of Production Economics, Elsevier, vol. 102(2), pages 183-198, August.
    15. Lee, Geun-Cheol & Kim, Yeong-Dae, 2000. "Algorithms for adjusting shapes of departments in block layouts on the grid-based plane," Omega, Elsevier, vol. 28(1), pages 111-122, February.
    16. Bolte, Andreas & Thonemann, Ulrich Wilhelm, 1996. "Optimizing simulated annealing schedules with genetic programming," European Journal of Operational Research, Elsevier, vol. 92(2), pages 402-416, July.
    17. Mariem Besbes & Marc Zolghadri & Roberta Costa Affonso & Faouzi Masmoudi & Mohamed Haddar, 2020. "A methodology for solving facility layout problem considering barriers: genetic algorithm coupled with A* search," Journal of Intelligent Manufacturing, Springer, vol. 31(3), pages 615-640, March.
    18. E A Silver, 2004. "An overview of heuristic solution methods," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(9), pages 936-956, September.
    19. Balakrishnan, Jaydeep & Cheng, Chun Hung & Conway, Daniel G. & Lau, Chun Ming, 2003. "A hybrid genetic algorithm for the dynamic plant layout problem," International Journal of Production Economics, Elsevier, vol. 86(2), pages 107-120, November.
    20. Yu, Junfang & Sarker, Bhaba R., 2003. "Directional decomposition heuristic for a linear machine-cell location problem," European Journal of Operational Research, Elsevier, vol. 149(1), pages 142-184, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:19:y:2001:i:4:p:365-377. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.