IDEAS home Printed from https://ideas.repec.org/a/spr/flsman/v35y2023i4d10.1007_s10696-022-09477-4.html
   My bibliography  Save this article

Balancing and sequencing of mixed-model assembly line considering preventive maintenance scenarios: mathematical model and a migrating birds optimization algorithm

Author

Listed:
  • Kai Meng

    (Wuhan University of Science and Technology
    Wuhan University of Science and Technology)

  • Qiuhua Tang

    (Wuhan University of Science and Technology
    Wuhan University of Science and Technology)

  • Zikai Zhang

    (Wuhan University of Science and Technology
    Wuhan University of Science and Technology)

Abstract

In the mixed-model assembly line balancing and sequencing problem (MALBSP), workstations are assumed to be constantly available. The failure of any workstation will make the entire assembly line stop working. Preventive maintenance (PM) is a way to maintain the workstation before its failure, reduce unexpected downtime, and prolong its useful life. Previous studies have considered PM scenarios (PMS) in the simple and U-shaped assembly line to improve production efficiency and smoothness effectively, but not in the mixed-model assembly line. This paper fills this research gap, and the MALBSP considering PMS (MALBSP_PMS) is studied in this paper. A mixed-integer linear programming model is proposed to minimize makespan and task alteration. A migrating birds optimization algorithm is improved (IMBO) to obtain well-distributed Pareto frontier solutions. This algorithm designs a restart mechanism and an intra-population crossover operator to avoid falling into the local optimal and enhance its searchability. Experimental results demonstrate the effectiveness of two improvements and the IMBO algorithm. In addition, a real-world case study is introduced to illustrate the importance of considering PM scenarios in MALBSP.

Suggested Citation

  • Kai Meng & Qiuhua Tang & Zikai Zhang, 2023. "Balancing and sequencing of mixed-model assembly line considering preventive maintenance scenarios: mathematical model and a migrating birds optimization algorithm," Flexible Services and Manufacturing Journal, Springer, vol. 35(4), pages 1175-1205, December.
  • Handle: RePEc:spr:flsman:v:35:y:2023:i:4:d:10.1007_s10696-022-09477-4
    DOI: 10.1007/s10696-022-09477-4
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10696-022-09477-4
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10696-022-09477-4?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Nick T. Thomopoulos, 1970. "Mixed Model Line Balancing with Smoothed Station Assignments," Management Science, INFORMS, vol. 16(9), pages 593-603, May.
    2. John Boudreau & Wallace Hopp & John O. McClain & L. Joseph Thomas, 2003. "On the Interface Between Operations and Human Resources Management," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 179-202, September.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Böhm, Robert & Letmathe, Peter & Schinner, Matthias, 2023. "The monetary value of competencies: A novel method and case study in smart manufacturing," Technological Forecasting and Social Change, Elsevier, vol. 189(C).
    2. Diwas Singh KC & Bradley R. Staats, 2012. "Accumulating a Portfolio of Experience: The Effect of Focal and Related Experience on Surgeon Performance," Manufacturing & Service Operations Management, INFORMS, vol. 14(4), pages 618-633, October.
    3. Jacobs, Mark A. & Yu, Wantao & Chavez, Roberto, 2016. "The effect of internal communication and employee satisfaction on supply chain integration," International Journal of Production Economics, Elsevier, vol. 171(P1), pages 60-70.
    4. Becker, Christian & Scholl, Armin, 2006. "A survey on problems and methods in generalized assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
    5. Lilun Du & Qing Li, 2020. "A Data-Driven Approach to High-Volume Recruitment: Application to Student Admission," Manufacturing & Service Operations Management, INFORMS, vol. 22(5), pages 942-957, September.
    6. Yee, Rachel W.Y. & Guo, Yujuan & Yeung, Andy C.L., 2015. "Being close or being happy? The relative impact of work relationship and job satisfaction on service quality," International Journal of Production Economics, Elsevier, vol. 169(C), pages 391-400.
    7. Robert S. Huckman & Bradley R. Staats, 2011. "Fluid Tasks and Fluid Teams: The Impact of Diversity in Experience and Team Familiarity on Team Performance," Manufacturing & Service Operations Management, INFORMS, vol. 13(3), pages 310-328, July.
    8. Gokcen, Hadi & Erel, Erdal, 1997. "A goal programming approach to mixed-model assembly line balancing problem," International Journal of Production Economics, Elsevier, vol. 48(2), pages 177-185, January.
    9. Yavuz, Mesut & Tufekci, Suleyman, 2006. "A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems," International Journal of Production Economics, Elsevier, vol. 103(2), pages 841-862, October.
    10. Christopher S. Tang, 2017. "OM Forum—Three Simple Approaches for Young Scholars to Identify Relevant and Novel Research Topics in Operations Management," Manufacturing & Service Operations Management, INFORMS, vol. 19(3), pages 338-346, July.
    11. van Zante-de Fokkert, Jannet I. & de Kok, Ton G., 1997. "The mixed and multi model line balancing problem: a comparison," European Journal of Operational Research, Elsevier, vol. 100(3), pages 399-412, August.
    12. Karabati, Selcuk & Sayin, Serpil, 2003. "Assembly line balancing in a mixed-model sequencing environment with synchronous transfers," European Journal of Operational Research, Elsevier, vol. 149(2), pages 417-429, September.
    13. Tom Fangyun Tan & Serguei Netessine, 2014. "When Does the Devil Make Work? An Empirical Study of the Impact of Workload on Worker Productivity," Management Science, INFORMS, vol. 60(6), pages 1574-1593, June.
    14. Jiang, Zhong-Zhong & Fang, Shu-Cherng & Fan, Zhi-Ping & Wang, Dingwei, 2013. "Selecting optimal selling format of a product in B2C online auctions with boundedly rational customers," European Journal of Operational Research, Elsevier, vol. 226(1), pages 139-153.
    15. Italo Giuseppe Cirielli De Mola & Luigi Napoli & Fernando Giancotti & Francesco Caputo, 2025. "Decoding the Journey Towards Digital Work Processes. Reflections on the Impact of Agile Working on Knowledge Hiding and Knowledge Sharing," Journal of the Knowledge Economy, Springer;Portland International Center for Management of Engineering and Technology (PICMET), vol. 16(1), pages 5371-5384, March.
    16. David Anderson & Margrét Vilborg Bjarnadóttir & David Gaddis Ross, 2023. "Bridging the gap: Applying analytics to address gender pay inequity," Production and Operations Management, Production and Operations Management Society, vol. 32(6), pages 1846-1864, June.
    17. Shashank Vaid & Michael Ahearne & Ryan Krause, 2021. "Operations‐Related Structural Flux: Firm Performance Effects of Executives’ Appointments and Exits," Production and Operations Management, Production and Operations Management Society, vol. 30(7), pages 2188-2210, July.
    18. Yee, Rachel W.Y. & Yeung, Andy C.L. & Cheng, T.C.E., 2011. "The service-profit chain: An empirical analysis in high-contact service industries," International Journal of Production Economics, Elsevier, vol. 130(2), pages 236-245, April.
    19. Bock, Stefan, 2008. "Supporting offshoring and nearshoring decisions for mass customization manufacturing processes," European Journal of Operational Research, Elsevier, vol. 184(2), pages 490-508, January.
    20. Sobrie, Léon & Verschelde, Marijn & Roets, Bart, 2024. "Explainable real-time predictive analytics on employee workload in digital railway control rooms," European Journal of Operational Research, Elsevier, vol. 317(2), pages 437-448.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:flsman:v:35:y:2023:i:4:d:10.1007_s10696-022-09477-4. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.