IDEAS home Printed from https://ideas.repec.org/a/jfr/ijba11/v8y2017i7p1-15.html
   My bibliography  Save this article

An Accuracy Investigation of Product Cost Estimation in Automotive Die Manufacturing

Author

Listed:
  • Julia Bendul
  • Vasile Apostu

Abstract

Automotive die manufacturers face the constant challenge of producing qualitative products while having to reduce costs. However, cost reduction measures are rather insignificant during the actual manufacturing process as the most important cost-impacting decisions are taken during the design phase. Cost estimation methods attempt to determine the production cost already in the design phase; the cost can be broken down and therefore the plan times of manufacturing processes can be pre-calculated, thus enabling early capacity decisions. Many researchers have been focusing for decades on developing efficient cost estimation methods. Yet their scarce access to cost information meant that most of the developed methods could not be evaluated with real data and thus their implementation in practice being challenged. This paper reviews and classifies cost estimation methods and investigates the accuracy of the estimate based onpractical application in 190 cases. The overall aim is to determine the accuracy level of the studied methods in practice and therefore identify their application fields.

Suggested Citation

  • Julia Bendul & Vasile Apostu, 2017. "An Accuracy Investigation of Product Cost Estimation in Automotive Die Manufacturing," International Journal of Business Administration, International Journal of Business Administration, Sciedu Press, vol. 8(7), pages 1-15, November.
  • Handle: RePEc:jfr:ijba11:v:8:y:2017:i:7:p:1-15
    DOI: 10.5430/ijba.v8n7p1
    as

    Download full text from publisher

    File URL: http://www.sciedu.ca/journal/index.php/ijba/article/view/12418/7647
    Download Restriction: no

    File URL: http://www.sciedu.ca/journal/index.php/ijba/article/view/12418
    Download Restriction: no

    File URL: https://libkey.io/10.5430/ijba.v8n7p1?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. de Cos, Javier & Sanchez, Fernando & Ortega, Francisco & Montequin, Vicente, 2008. "Rapid cost estimation of metallic components for the aerospace industry," International Journal of Production Economics, Elsevier, vol. 112(1), pages 470-482, March.
    2. Qian, Li & Ben-Arieh, David, 2008. "Parametric cost estimation based on activity-based costing: A case study for design and development of rotational parts," International Journal of Production Economics, Elsevier, vol. 113(2), pages 805-818, June.
    3. H'mida, Fehmi & Martin, Patrick & Vernadat, Francois, 2006. "Cost estimation in mechanical production: The Cost Entity approach applied to integrated product engineering," International Journal of Production Economics, Elsevier, vol. 103(1), pages 17-35, September.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Johnson, Michael D. & Kirchain, Randolph E., 2009. "Quantifying the effects of product family decisions on material selection: A process-based costing approach," International Journal of Production Economics, Elsevier, vol. 120(2), pages 653-668, August.
    2. Duffner, Fabian & Mauler, Lukas & Wentker, Marc & Leker, Jens & Winter, Martin, 2021. "Large-scale automotive battery cell manufacturing: Analyzing strategic and operational effects on manufacturing costs," International Journal of Production Economics, Elsevier, vol. 232(C).
    3. Bodendorf, Frank & Xie, Qiao & Merkl, Philipp & Franke, Jörg, 2022. "A multi-perspective approach to support collaborative cost management in supplier-buyer dyads," International Journal of Production Economics, Elsevier, vol. 245(C).
    4. Askarany, Davood & Yazdifar, Hassan, 2012. "An investigation into the mixed reported adoption rates for ABC: Evidence from Australia, New Zealand and the UK," International Journal of Production Economics, Elsevier, vol. 135(1), pages 430-439.
    5. K. Reddy & H. S. Venter & M. S. Olivier, 2012. "Using time-driven activity-based costing to manage digital forensic readiness in large organisations," Information Systems Frontiers, Springer, vol. 14(5), pages 1061-1077, December.
    6. Qian, Li & Ben-Arieh, David, 2008. "Parametric cost estimation based on activity-based costing: A case study for design and development of rotational parts," International Journal of Production Economics, Elsevier, vol. 113(2), pages 805-818, June.
    7. Antonio Armillotta, 2021. "On the role of complexity in machining time estimation," Journal of Intelligent Manufacturing, Springer, vol. 32(8), pages 2281-2299, December.
    8. Zębala, Wojciech & Plaza, Malgorzata, 2014. "Comparative study of 3- and 5-axis CNC centers for free-form machining of difficult-to-cut material," International Journal of Production Economics, Elsevier, vol. 158(C), pages 345-358.
    9. Nasser Amaitik & Ming Zhang & Zezhong Wang & Yuchun Xu & Gareth Thomson & Yiyong Xiao & Nikolaos Kolokas & Alexander Maisuradze & Oscar Garcia & Michael Peschl & Dimitrios Tzovaras, 2022. "Cost Modelling to Support Optimum Selection of Life Extension Strategy for Industrial Equipment in Smart Manufacturing," Circular Economy and Sustainability,, Springer.
    10. Wouters, Marc & Stecher, Julia, 2017. "Development of real-time product cost measurement: A case study in a medium-sized manufacturing company," International Journal of Production Economics, Elsevier, vol. 183(PA), pages 235-244.
    11. Duffner, F. & Wentker, M. & Greenwood, M. & Leker, J., 2020. "Battery cost modeling: A review and directions for future research," Renewable and Sustainable Energy Reviews, Elsevier, vol. 127(C).
    12. Askarany, Davood & Yazdifar, Hassan & Askary, Saeed, 2010. "Supply chain management, activity-based costing and organisational factors," International Journal of Production Economics, Elsevier, vol. 127(2), pages 238-248, October.
    13. Barbón, A. & Sánchez-Rodríguez, J.A. & Bayón, L. & Bayón-Cueli, C., 2019. "Cost estimation relationships of a small scale linear Fresnel reflector," Renewable Energy, Elsevier, vol. 134(C), pages 1273-1284.
    14. Wen-Hsien Tsai, 2018. "Carbon Taxes and Carbon Right Costs Analysis for the Tire Industry," Energies, MDPI, vol. 11(8), pages 1-22, August.
    15. Chul-Seung Hong & Eul-Bum Lee, 2018. "Power Plant Economic Analysis: Maximizing Lifecycle Profitability by Simulating Preliminary Design Solutions of Steam-Cycle Conditions," Energies, MDPI, vol. 11(9), pages 1-21, August.
    16. Folgado, R. & Peças, P. & Henriques, E., 2010. "Life cycle cost for technology selection: A Case study in the manufacturing of injection moulds," International Journal of Production Economics, Elsevier, vol. 128(1), pages 368-378, November.
    17. Langmaak, Stephan & Wiseall, Stephen & Bru, Christophe & Adkins, Russell & Scanlan, James & Sóbester, András, 2013. "An activity-based-parametric hybrid cost model to estimate the unit cost of a novel gas turbine component," International Journal of Production Economics, Elsevier, vol. 142(1), pages 74-88.
    18. Baykasoglu, Adil & Kaplanoglu, Vahit, 2008. "Application of activity-based costing to a land transportation company: A case study," International Journal of Production Economics, Elsevier, vol. 116(2), pages 308-324, December.
    19. Verlinden, B. & Duflou, J.R. & Collin, P. & Cattrysse, D., 2008. "Cost estimation for sheet metal parts using multiple regression and artificial neural networks: A case study," International Journal of Production Economics, Elsevier, vol. 111(2), pages 484-492, February.
    20. de Cos, Javier & Sanchez, Fernando & Ortega, Francisco & Montequin, Vicente, 2008. "Rapid cost estimation of metallic components for the aerospace industry," International Journal of Production Economics, Elsevier, vol. 112(1), pages 470-482, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:jfr:ijba11:v:8:y:2017:i:7:p:1-15. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Jenny Zhang (email available below). General contact details of provider: http://ijba.sciedupress.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.