IDEAS home Printed from https://ideas.repec.org/a/inm/orinte/v37y2007i2p108-119.html
   My bibliography  Save this article

Ball Aerospace Explores Operational and Financial Trade-Offs in Batch Sizing in Implementing JIT

Author

Listed:
  • Peter McKenzie

    (Phelps-Dodge Bagdad, Inc., PO Box 7, Bagdad, Arizona 86321)

  • Shekhar Jayanthi

    (Lally School of Management and Technology, Rensselaer Polytechnic Institute, Troy, New York 12180)

Abstract

Ball Aerospace, which manufactures highly innovative products, recently implemented a just-in-time (JIT) manufacturing system to reduce costs, improve lead times, and enhance customer satisfaction. The company manufactures under customer requirements that dictate the timing and quantities of sales. In the first phase of our study, we used value stream mapping (VSM), a precursor to implementing JIT, for two products in the company’s advanced antenna and video systems division. Using this approach, we reduced the lead times and identified opportunities for improvement in the manufacturing facility. In the second phase, we quantified the trade-off between operational and financial considerations of the JIT implementation. Using detailed data from the facility, we analyzed these trade-offs by investigating batch-sizing decisions under different types of demand patterns. Our analysis provided the company with the input it needed to make resource-allocation decisions and current and planned process improvements under changes in external demand.

Suggested Citation

  • Peter McKenzie & Shekhar Jayanthi, 2007. "Ball Aerospace Explores Operational and Financial Trade-Offs in Batch Sizing in Implementing JIT," Interfaces, INFORMS, vol. 37(2), pages 108-119, April.
  • Handle: RePEc:inm:orinte:v:37:y:2007:i:2:p:108-119
    DOI: 10.1287/inte.1060.0281
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/inte.1060.0281
    Download Restriction: no

    File URL: https://libkey.io/10.1287/inte.1060.0281?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
    2. Marshall Fisher & Kamalini Ramdas & Yu-Sheng Zheng, 2001. "Ending Inventory Valuation in Multiperiod Production Scheduling," Management Science, INFORMS, vol. 47(5), pages 679-692, May.
    3. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    4. Vishal Gaur & Sridhar Seshadri, 2005. "Hedging Inventory Risk Through Market Instruments," Manufacturing & Service Operations Management, INFORMS, vol. 7(2), pages 103-120, April.
    5. Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
    6. William Beranek, 1967. "Financial Implications of Lot-Size Inventory Models," Management Science, INFORMS, vol. 13(8), pages 401-408, April.
    7. J Betts & R B Johnston, 2001. "Just-in-time replenishment decisions for assembly manufacturing with investor-supplied finance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(7), pages 750-761, July.
    8. Marshall Fisher & Ananth Raman, 1996. "Reducing the Cost of Demand Uncertainty Through Accurate Response to Early Sales," Operations Research, INFORMS, vol. 44(1), pages 87-99, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Michael F. Gorman & Jayden Hoff & Robert Kinion, 2009. "ASP, The Art and Science of Practice: Tales from the Front: Case Studies Indicate the Potential Pitfalls of Misapplication of Lean Improvement Programs," Interfaces, INFORMS, vol. 39(6), pages 540-548, December.
    2. Liu, Guoli & Li, Feng & Yang, Xianyan & Qiu, Shuang, 2020. "The multi-stage multi-product batch-sizing problem in the steel industry," Applied Mathematics and Computation, Elsevier, vol. 369(C).
    3. Máté Hegyháti & Krisztián Attila Bakon & Tibor Holczinger, 2023. "Optimization with uncertainties: a scheduling example," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(4), pages 1239-1263, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Diaby, Moustapha, 1995. "Optimal setup time reduction for a single product with dynamic demands," European Journal of Operational Research, Elsevier, vol. 85(3), pages 532-540, September.
    2. Pilar I. Vidal-Carreras & Jose P. Garcia-Sabater & Julio J. Garcia-Sabater, 2017. "A practical model for managing inventories with unknown costs and a budget constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 118-129, January.
    3. Charles, Mehdi & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Mazhoud, Issam, 2022. "Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories," European Journal of Operational Research, Elsevier, vol. 302(1), pages 203-220.
    4. Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
    5. M. Ganesh Kumar & R. Uthayakumar, 2017. "An integrated single vendor–buyer inventory model for imperfect production process with stochastic demand in controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1041-1054, November.
    6. Kim, DaeSoo & Lee, Won J., 1998. "Optimal joint pricing and lot sizing with fixed and variable capacity," European Journal of Operational Research, Elsevier, vol. 109(1), pages 212-227, August.
    7. Fine, Charles H., 1989. "Developments in manufacturing technology and economic evaluation models," Working papers 3012-89., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    8. Denizel, Meltem & Erenguc, Selcuk & Benson, Harold P., 1997. "Dynamic lot-sizing with setup cost reduction," European Journal of Operational Research, Elsevier, vol. 100(3), pages 537-549, August.
    9. Kajjoune, Oussama & Aouam, Tarik & Zouadi, Tarik & Ranjan, Ravi Prakash, 2023. "Dynamic lot-sizing in a two-stage supply chain with liquidity constraints and financing options," International Journal of Production Economics, Elsevier, vol. 258(C).
    10. Voros, Jozsef, 1999. "Lot sizing with quality improvement and setup time reduction," European Journal of Operational Research, Elsevier, vol. 113(3), pages 568-574, March.
    11. Mohammad Ebrahim Arbabian & Shi Chen & Kamran Moinzadeh, 2021. "Capacity Expansions with Bundled Supplies of Attributes: An Application to Server Procurement in Cloud Computing," Manufacturing & Service Operations Management, INFORMS, vol. 23(1), pages 191-209, 1-2.
    12. Aharon Ben-Tal & Boaz Golany & Arkadi Nemirovski & Jean-Philippe Vial, 2005. "Retailer-Supplier Flexible Commitments Contracts: A Robust Optimization Approach," Manufacturing & Service Operations Management, INFORMS, vol. 7(3), pages 248-271, February.
    13. Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
    14. Suárez, Freddy F. & Cusumano, Michael A., 1954- & Fine, Charles H., 1991. "Flexibility and performance : a literature critique and strategic framework," Working papers 3298-91., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    15. Fangruo Chen & Awi Federgruen & Yu-Sheng Zheng, 2001. "Near-Optimal Pricing and Replenishment Strategies for a Retail/Distribution System," Operations Research, INFORMS, vol. 49(6), pages 839-853, December.
    16. Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
    17. Richard Kum-yew Lai, 2005. "Inventory Signals," Microeconomics 0509001, University Library of Munich, Germany.
    18. Diaby, Moustapha & Cruz, Jose M. & Nsakanda, Aaron L., 2013. "Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction," European Journal of Operational Research, Elsevier, vol. 228(3), pages 526-535.
    19. Dey, Oshmita & Chakraborty, Debjani, 2011. "A fuzzy random continuous review inventory system," International Journal of Production Economics, Elsevier, vol. 132(1), pages 101-106, July.
    20. Wilco Van den Heuvel & Albert P. M. Wagelmans, 2010. "Worst-Case Analysis for a General Class of Online Lot-Sizing Heuristics," Operations Research, INFORMS, vol. 58(1), pages 59-67, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orinte:v:37:y:2007:i:2:p:108-119. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.