IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v55y2017i1p118-129.html
   My bibliography  Save this article

A practical model for managing inventories with unknown costs and a budget constraint

Author

Listed:
  • Pilar I. Vidal-Carreras
  • Jose P. Garcia-Sabater
  • Julio J. Garcia-Sabater

Abstract

The economic production quantity method is one of the simplest models to control production and inventory. However, the assumptions on which it is based make its application difficult in practical situations. In most companies, set-up and inventory costs are unknown, or may not even exist as such, although other data are known, such as available capacity in machining hours and limits set by the financing subsystem. The present work offers a multi-item inventory model that sets reference values using known values such as inventory investment limits and production capacity. In order to confer the proposed model’s larger practical content, a spreadsheet available to be downloaded has been implemented. Finally, the model dynamics is illustrated as a numerical example obtained from a real company.

Suggested Citation

  • Pilar I. Vidal-Carreras & Jose P. Garcia-Sabater & Julio J. Garcia-Sabater, 2017. "A practical model for managing inventories with unknown costs and a budget constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 118-129, January.
  • Handle: RePEc:taf:tprsxx:v:55:y:2017:i:1:p:118-129
    DOI: 10.1080/00207543.2016.1198056
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2016.1198056
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Pentico, David W. & Drake, Matthew J. & Toews, Carl, 2009. "The deterministic EPQ with partial backordering: A new approach," Omega, Elsevier, vol. 37(3), pages 624-636, June.
    2. Schulz, Tobias & Voigt, Guido, 2014. "A flexibly structured lot sizing heuristic for a static remanufacturing system," Omega, Elsevier, vol. 44(C), pages 21-31.
    3. Berling, Peter, 2008. "Holding cost determination: An activity-based cost approach," International Journal of Production Economics, Elsevier, vol. 112(2), pages 829-840, April.
    4. Teunter, Ruud H. & van der Laan, Erwin & Inderfurth, Karl, 2000. "How to set the holding cost rates in average cost inventory models with reverse logistics?," Omega, Elsevier, vol. 28(4), pages 409-415, August.
    5. Shamin Shirodkar & Karl Kempf, 2006. "Supply Chain Collaboration Through Shared Capacity Models," Interfaces, INFORMS, vol. 36(5), pages 420-432, October.
    6. Taleizadeh, Ata Allah & Pentico, David W. & Saeed Jabalameli, Mohammad & Aryanezhad, Mirbahador, 2013. "An EOQ model with partial delayed payment and partial backordering," Omega, Elsevier, vol. 41(2), pages 354-368.
    7. Teng, Jinn-Tsair, 2009. "A simple method to compute economic order quantities," European Journal of Operational Research, Elsevier, vol. 198(1), pages 351-353, October.
    8. Alfares, Hesham K., 2007. "Inventory model with stock-level dependent demand rate and variable holding cost," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 259-265, July.
    9. Meyr, H., 2004. "Supply chain planning in the German automotive industry," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 36062, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    10. Sana, Shib Sankar & Chaudhuri, K.S., 2008. "A deterministic EOQ model with delays in payments and price-discount offers," European Journal of Operational Research, Elsevier, vol. 184(2), pages 509-533, January.
    11. Peter Berling & Kaj Rosling, 2005. "The Effects of Financial Risks on Inventory Policy," Management Science, INFORMS, vol. 51(12), pages 1804-1815, December.
    12. Goh, Mark, 1992. "Some results for inventory models having inventory level dependent demand rate," International Journal of Production Economics, Elsevier, vol. 27(2), pages 155-160, May.
    13. Teng, Jinn-Tsair & Min, Jie & Pan, Qinhua, 2012. "Economic order quantity model with trade credit financing for non-decreasing demand," Omega, Elsevier, vol. 40(3), pages 328-335.
    14. Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
    15. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mohsen Lashgari & Ata Taleizadeh & Abbas Ahmadi, 2016. "Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain," Annals of Operations Research, Springer, vol. 238(1), pages 329-354, March.
    2. Taleizadeh, Ata Allah & Pentico, David W. & Saeed Jabalameli, Mohammad & Aryanezhad, Mirbahador, 2013. "An EOQ model with partial delayed payment and partial backordering," Omega, Elsevier, vol. 41(2), pages 354-368.
    3. San-José, L.A. & Sicilia, J. & García-Laguna, J., 2015. "Analysis of an EOQ inventory model with partial backordering and non-linear unit holding cost," Omega, Elsevier, vol. 54(C), pages 147-157.
    4. Mohsen Lashgari & Ata Allah Taleizadeh & Abbas Ahmadi, 2016. "Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain," Annals of Operations Research, Springer, vol. 238(1), pages 329-354, March.
    5. Zhang, Qinhong & Dong, Ming & Luo, Jianwen & Segerstedt, Anders, 2014. "Supply chain coordination with trade credit and quantity discount incorporating default risk," International Journal of Production Economics, Elsevier, vol. 153(C), pages 352-360.
    6. Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 202(2), pages 473-478, April.
    7. Dellino, Gabriella & Kleijnen, Jack P.C. & Meloni, Carlo, 2010. "Robust optimization in simulation: Taguchi and Response Surface Methodology," International Journal of Production Economics, Elsevier, vol. 125(1), pages 52-59, May.
    8. Ramasesh, Ranga V., 2010. "Lot-sizing decisions under limited-time price incentives: A review," Omega, Elsevier, vol. 38(3-4), pages 118-135, June.
    9. Al-Amin Khan, Md. & Shaikh, Ali Akbar & Konstantaras, Ioannis & Bhunia, Asoke Kumar & Cárdenas-Barrón, Leopoldo Eduardo, 2020. "Inventory models for perishable items with advanced payment, linearly time-dependent holding cost and demand dependent on advertisement and selling price," International Journal of Production Economics, Elsevier, vol. 230(C).
    10. Hossein Salehi & Ata Allah Taleizadeh & Reza Tavakkoli-Moghaddam, 2016. "An EOQ model with random disruption and partial backordering," International Journal of Production Research, Taylor & Francis Journals, vol. 54(9), pages 2600-2609, May.
    11. Pourmohammad Zia, Nadia & Taleizadeh, Ata Allah, 2015. "A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 82(C), pages 19-37.
    12. H. Dharma Kwon, 2010. "Invest or Exit? Optimal Decisions in the Face of a Declining Profit Stream," Operations Research, INFORMS, vol. 58(3), pages 638-649, June.
    13. Yang, Honglin & Zhuo, Wenyan & Shao, Lusheng, 2017. "Equilibrium evolution in a two-echelon supply chain with financially constrained retailers: The impact of equity financing," International Journal of Production Economics, Elsevier, vol. 185(C), pages 139-149.
    14. Sarkar, Biswajit & Sarkar, Sumon, 2013. "An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand," Economic Modelling, Elsevier, vol. 30(C), pages 924-932.
    15. Li, Xiang, 2020. "Reducing channel costs by investing in smart supply chain technologies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 137(C).
    16. Nita Shah & Monika Naik, 2019. "Coordinated production, ordering, shipment and pricing model for supplier-retailer inventory system under trade credit," Operations Research and Decisions, Wroclaw University of Technology, Institute of Organization and Management, vol. 2, pages 55-76.
    17. Ata Allah Taleizadeh & Shayan Tavakoli & Luis Augusto San-José, 2018. "A lot sizing model with advance payment and planned backordering," Annals of Operations Research, Springer, vol. 271(2), pages 1001-1022, December.
    18. Ata Allah Taleizadeh & Sara Tavassoli & Arijit Bhattacharya, 2020. "Inventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backordering," Annals of Operations Research, Springer, vol. 287(1), pages 403-437, April.
    19. Gao, Deng & Zhao, Xiaobo & Geng, Wei, 2014. "A delay-in-payment contract for Pareto improvement of a supply chain with stochastic demand," Omega, Elsevier, vol. 49(C), pages 60-68.
    20. Guillermo Gallego & Ilkyeong Moon, 1995. "Strategic investment to reduce setup times in the economic lot scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 773-790, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:55:y:2017:i:1:p:118-129. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Chris Longhurst). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service hosted by the Research Division of the Federal Reserve Bank of St. Louis . RePEc uses bibliographic data supplied by the respective publishers.