Validating a Decision-Support Framework for Optimal Calf Weaning in South African Beef Systems Using the Delphi Technique
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Peter Kaming & Paul Olomolaiye & Gary Holt & Frank Harris, 1997. "Factors influencing construction time and cost overruns on high-rise projects in Indonesia," Construction Management and Economics, Taylor & Francis Journals, vol. 15(1), pages 83-94.
- Guimaraes, Paulo Henrique Silva & Madalena, Fernando Enrique & Cezar, Ivo Martins, 2006. "Comparative economics of Holstein/Gir F1 dairy female production and conventional beef cattle suckler herds - A simulation study," Agricultural Systems, Elsevier, vol. 88(2-3), pages 111-124, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
- Daeyoun Won & Bon‐Gang Hwang & Soo Jing Chng, 2021. "Assessing the effects of workforce diversity on project productivity performance for sustainable workplace in the construction industry," Sustainable Development, John Wiley & Sons, Ltd., vol. 29(2), pages 398-418, March.
- Miranda Sarmento, J.J. & Renneboog, Luc, 2017. "Cost overruns in public sector investment projects," Other publications TiSEM 51799a3e-4c78-4dbd-b330-b, Tilburg University, School of Economics and Management.
- Nur Fatin Syazwani Abu Bakar* & Syuhaida Ismail & Rohayah Che Amat & Serdar Durdyev, 2018. "Sustainable Construction in Malaysian Mixed Development Projects: The Barriers and Critical Success Factors," The Journal of Social Sciences Research, Academic Research Publishing Group, pages 885-892:6.
- Giuliano Marella & Valentina Antoniucci, 2019. "Time Overrun in Public Works—Evidence from North-East Italy," Sustainability, MDPI, vol. 11(24), pages 1-17, December.
- Myung-Hun Kim & Eul-Bum Lee, 2019. "A Forecast Model for the Level of Engineering Maturity Impact on Contractor’s Procurement and Construction Costs for Offshore EPC Megaprojects," Energies, MDPI, vol. 12(12), pages 1-18, June.
- Goutom K. Pall & Adrian J. Bridge & Jason Gray & Martin Skitmore, 2019. "Causes of Delay in Power Transmission Projects: An Empirical Study," Energies, MDPI, vol. 13(1), pages 1-29, December.
- Sou-Sen Leu & Cheng-Yu Lu & Pei-Lin Wu, 2023. "Dynamic-Bayesian-Network-Based Project Cost Overrun Prediction Model," Sustainability, MDPI, vol. 15(5), pages 1-14, March.
- Mehmet Tolga Taner, 2013. "Critical Success Factors for Six Sigma Implementation in Large-scale Turkish Construction Companies," International Review of Management and Marketing, Econjournals, vol. 3(4), pages 212-225.
- Marija Z. Ivanović & Đorđe Nedeljković & Zoran Stojadinović & Dejan Marinković & Nenad Ivanišević & Nevena Simić, 2022. "Detection and In-Depth Analysis of Causes of Delay in Construction Projects: Synergy between Machine Learning and Expert Knowledge," Sustainability, MDPI, vol. 14(22), pages 1-23, November.
- Bajomo, Mary & Ogbeyemi, Akinola & Zhang, Wenjun, 2022. "A systems dynamics approach to the management of material procurement for Engineering, Procurement and Construction industry," International Journal of Production Economics, Elsevier, vol. 244(C).
- Manamba EPAPHRA, 2016. "Foreign Direct Investment and Sectoral Performance in Tanzania," Journal of Economics and Political Economy, KSP Journals, vol. 3(4), pages 670-719, December.
- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2019. "Materials Challenges in Reconstruction of Historical Projects: A Case Study of the Old Riwaq Project," Sustainability, MDPI, vol. 11(17), pages 1-19, August.
- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2020. "Delay Factors Management and Ranking for Reconstruction and Rehabilitation Projects Based on the Relative Importance Index (RII)," Sustainability, MDPI, vol. 12(15), pages 1-21, July.
- Kiran Khurshid & Aamar Danish & Muhammad Usama Salim & Muhammed Bayram & Togay Ozbakkaloglu & Mohammad Ali Mosaberpanah, 2023. "An In-Depth Survey Demystifying the Internet of Things (IoT) in the Construction Industry: Unfolding New Dimensions," Sustainability, MDPI, vol. 15(2), pages 1-24, January.
- Swee Lean Chan & Moonseo Park, 2005. "Project cost estimation using principal component regression," Construction Management and Economics, Taylor & Francis Journals, vol. 23(3), pages 295-304.
- Moschouli, Eleni & Soecipto, Raden Murwantara & Vanelslander, Thierry, 2019. "Cost performance of transport infrastructure projects before and after the global financial crisis (GFC): Are differences observed in the conditions of project performance?," Research in Transportation Economics, Elsevier, vol. 75(C), pages 21-35.
- Yuri Braga de Shiguer Yamasaki & Ricardo Carneiro Brumatti & Alberto de Oliveira Gaspar & Brenda Faria da Costa Leite & Rosiane Araujo Rodrigues Nass & Alexandre Menezes Dias, 2020. "Bioeconomic Simulation of the Cash Flow of Rural Beef Cattle Properties with Productive, Reproductive, and Sanitary Activities," Journal of Agricultural Studies, Macrothink Institute, vol. 8(3), pages 788-806, September.
- Miranda Sarmento, J.J., 2014. "Public private partnerships," Other publications TiSEM c7d4c978-234c-4f88-83ed-1, Tilburg University, School of Economics and Management.
- Oke Ayodeji Emmanuel, 2016. "Effect of bond administration on construction project delivery," Organization, Technology and Management in Construction, Sciendo, vol. 8(1), pages 1390-1396, December.
More about this item
Keywords
weaning; cow-calf management; decision support; Delphi method; livestock expert; framework validation;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:17:y:2025:i:9:p:4153-:d:1648996. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.