Materials Challenges in Reconstruction of Historical Projects: A Case Study of the Old Riwaq Project
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Abdullah Rasheed Alhajri & Adel Alshibani, 2018. "Critical Factors behind Construction Delay in Petrochemical Projects in Saudi Arabia," Energies, MDPI, vol. 11(7), pages 1-18, June.
- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
- Arshi Shakeel Faridi & Sameh Monir El-Sayegh, 2006. "Significant factors causing delay in the UAE construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 24(11), pages 1167-1176.
- Peter Kaming & Paul Olomolaiye & Gary Holt & Frank Harris, 1997. "Factors influencing construction time and cost overruns on high-rise projects in Indonesia," Construction Management and Economics, Taylor & Francis Journals, vol. 15(1), pages 83-94.
- Menoka Bal & David Bryde & Damian Fearon & Edward Ochieng, 2013. "Stakeholder Engagement: Achieving Sustainability in the Construction Sector," Sustainability, MDPI, vol. 5(2), pages 1-16, February.
- Agnieszka Leśniak & Krzysztof Zima, 2018. "Cost Calculation of Construction Projects Including Sustainability Factors Using the Case Based Reasoning (CBR) Method," Sustainability, MDPI, vol. 10(5), pages 1-14, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Lucía Chacón-Ledesma & María-Araceli Calvo-Serrano & Francisco de Paula Montes-Tubío & Francisco-Javier Mesas-Carrascosa & Paula Triviño-Tarradas, 2022. "Graphic Engineering in the Sustainable Preservation of the Municipal Heritage of Montilla (Cordoba, Spain) from the 18th Century: Master Builder Vicente López Cardera in Montilla," Sustainability, MDPI, vol. 14(13), pages 1-20, June.
- M. Araceli Calvo-Serrano & Isabel L. Castillejo-González & Francisco Montes-Tubío & Pilar Mercader-Moyano, 2020. "The Church Tower of Santiago Apóstol in Montilla: An Eco-Sustainable Rehabilitation Proposal," Sustainability, MDPI, vol. 12(17), pages 1-17, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2020. "Delay Factors Management and Ranking for Reconstruction and Rehabilitation Projects Based on the Relative Importance Index (RII)," Sustainability, MDPI, vol. 12(15), pages 1-21, July.
- Goutom K. Pall & Adrian J. Bridge & Jason Gray & Martin Skitmore, 2019. "Causes of Delay in Power Transmission Projects: An Empirical Study," Energies, MDPI, vol. 13(1), pages 1-29, December.
- Faham Tahmasebinia & Vicheth Song, 2022. "Significant Factors Causing Delay in the Cambodian Construction Industry," Sustainability, MDPI, vol. 14(6), pages 1-24, March.
- Lerche, J. & Lorentzen, S. & Enevoldsen, P. & Neve, H.H., 2022. "The impact of COVID -19 on offshore wind project productivity – A case study," Renewable and Sustainable Energy Reviews, Elsevier, vol. 158(C).
- Murat Gunduz & Abdulrahman Abu-Hijleh, 2020. "Assessment of Human Productivity Drivers for Construction Labor through Importance Rating and Risk Mapping," Sustainability, MDPI, vol. 12(20), pages 1-18, October.
- Herve Kabanda & Alex Romard & Fuze Yurtsever & Anjali Wadhera & Joshua Andrews & Craig Merrett, 2021. "Construction Time Estimation Function for Canadian Utility Scale Power Plants," Energies, MDPI, vol. 14(17), pages 1-16, August.
- Jean Baptiste Habumuremyi & Thomas K Tarus, 2021. "Effect of Stakeholders’ Participation on Sustainability of Community Projects in Ruhango District, Rwanda," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 5(09), pages 429-433, September.
- Sang-Guk Yum & Kiyoung Son & Seunghyun Son & Ji-Myong Kim, 2020. "Identifying Risk Indicators for Natural Hazard-Related Power Outages as a Component of Risk Assessment: An Analysis Using Power Outage Data from Hurricane Irma," Sustainability, MDPI, vol. 12(18), pages 1-15, September.
- Minh Van Nguyen & Tu Thanh Nguyen & Chien Thanh Phan & Khanh Duy Ha, 2024. "Sustainable redevelopment of urban areas: Assessment of key barriers for the reconstruction of old residential buildings," Sustainable Development, John Wiley & Sons, Ltd., vol. 32(3), pages 2282-2297, June.
- Andri Ottesen & Dieter Thom & Rupali Bhagat & Rola Mourdaa, 2023. "Learning from the Future of Kuwait: Scenarios as a Learning Tool to Build Consensus for Actions Needed to Realize Vision 2035," Sustainability, MDPI, vol. 15(9), pages 1-25, April.
- R. Jayaraman, 2021. "An Empirical Study of Delays in Large Engineering Projects: An Indian Experience," Jindal Journal of Business Research, , vol. 10(1), pages 49-76, June.
- Achintya Ghatak & Adarsh Garg, 2022. "Power transmission project: a framework to align project success with organization goal," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(4), pages 1817-1833, August.
- Safi Ullah & Muhammad Siddiq & Deng Xiaopeng & Sun Jun & Diana R. Anbar & Chiemela Victor Amaechi & Muhammad Waqas Ashraf, 2025. "Identifying the Most Effective Delaying Factors Using FCEM-AHP: A Case Study of Pakistan’s Construction Industry," Journal of the Knowledge Economy, Springer;Portland International Center for Management of Engineering and Technology (PICMET), vol. 16(3), pages 13589-13623, September.
- Agata Klaus-Rosińska & Joanna Iwko, 2021. "Stakeholder Management—One of the Clues of Sustainable Project Management—As an Underestimated Factor of Project Success in Small Construction Companies," Sustainability, MDPI, vol. 13(17), pages 1-27, September.
- Dr. Mwenda, Mary Nyawira & Dr. Otieno- Omutoko Lillian & Prof. Christopher Gakuu, 2021. "The Nexus between Project Monitoring and Evaluation and Quality of Residential Buildings in Nairobi County, Kenya," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 5(1), pages 354-362, January.
- Fengchang Jiang & John Awaitey & Haiyan Xie, 2022. "Analysis of Construction Cost and Investment Planning Using Time Series Data," Sustainability, MDPI, vol. 14(3), pages 1-16, February.
- Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 0. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-10.
- Boda Liu & Bin Yang & Jianzhuang Xiao & Dayu Zhu & Binghan Zhang & Zhichen Wang & Miaosi Dong, 2021. "Review of Optimization Dynamically Applied in the Construction and the Application Potential of ICT," Sustainability, MDPI, vol. 13(10), pages 1-18, May.
- Yonggu Kim & Eul-Bum Lee, 2018. "A Probabilistic Alternative Approach to Optimal Project Profitability Based on the Value-at-Risk," Sustainability, MDPI, vol. 10(3), pages 1-24, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:11:y:2019:i:17:p:4533-:d:259515. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.
Printed from https://ideas.repec.org/a/gam/jsusta/v11y2019i17p4533-d259515.html