IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v14y2022i6p3521-d773086.html
   My bibliography  Save this article

Significant Factors Causing Delay in the Cambodian Construction Industry

Author

Listed:
  • Faham Tahmasebinia

    (School of Civil Engineering, The University of Sydney, Sydney, NSW 2008, Australia)

  • Vicheth Song

    (School of Built Environment, The University of New South Wales, Sydney, NSW 2052, Australia)

Abstract

The construction sector is one of the essential sectors in the world; it aids in developing all the countries in the world because it is the foundation of other industries. However, delays in construction projects are a common issue that has been found in all global construction projects. This research aims to understand the issues that lead to construction project delay, ranking the ten most significant causes of construction delay and providing instructive recommendations to overcome the discussed issue in the construction sector. The first ten substantial delay factors are poor planning and scheduling, late delivery of material, change of scope by owners during the construction phase, poor site management and supervision, insufficient finances of contractors or sub-contractors, lack of experience of the contractor’s team, delay due to design error, low productivity of labor, delay in process payment by the owner, and delay in the decision making of the owners and consultants. Subsequently, it was discovered that the contractors, consultants, and owners must cooperate and collaborate in all aspects to improve the construction industry.

Suggested Citation

  • Faham Tahmasebinia & Vicheth Song, 2022. "Significant Factors Causing Delay in the Cambodian Construction Industry," Sustainability, MDPI, vol. 14(6), pages 1-24, March.
  • Handle: RePEc:gam:jsusta:v:14:y:2022:i:6:p:3521-:d:773086
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/14/6/3521/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/14/6/3521/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Abdullah Rasheed Alhajri & Adel Alshibani, 2018. "Critical Factors behind Construction Delay in Petrochemical Projects in Saudi Arabia," Energies, MDPI, vol. 11(7), pages 1-18, June.
    2. Martine Selm & Nicholas Jankowski, 2006. "Conducting Online Surveys," Quality & Quantity: International Journal of Methodology, Springer, vol. 40(3), pages 435-456, June.
    3. Arshi Shakeel Faridi & Sameh Monir El-Sayegh, 2006. "Significant factors causing delay in the UAE construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 24(11), pages 1167-1176.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Peipei Wang & Yunhan Huang & Jianguo Zhu & Ming Shan, 2022. "Construction Dispute Potentials: Mechanism versus Empiricism in Artificial Neural Networks," Sustainability, MDPI, vol. 14(22), pages 1-23, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2019. "Materials Challenges in Reconstruction of Historical Projects: A Case Study of the Old Riwaq Project," Sustainability, MDPI, vol. 11(17), pages 1-19, August.
    2. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
    3. Murat Gunduz & Abdulrahman Abu-Hijleh, 2020. "Assessment of Human Productivity Drivers for Construction Labor through Importance Rating and Risk Mapping," Sustainability, MDPI, vol. 12(20), pages 1-18, October.
    4. Herve Kabanda & Alex Romard & Fuze Yurtsever & Anjali Wadhera & Joshua Andrews & Craig Merrett, 2021. "Construction Time Estimation Function for Canadian Utility Scale Power Plants," Energies, MDPI, vol. 14(17), pages 1-16, August.
    5. Morenike Oluwatoyin Folayan & Roberto Ariel Abeldaño Zuniga & Oliver C. Ezechi & Brandon Brown & Annie L. Nguyen & Nourhan M. Aly & Passent Ellakany & Ifeoma E. Idigbe & Abeedha Tu-Allah Khan & Folake, 2022. "Associations between Emotional Distress, Sleep Changes, Decreased Tooth Brushing Frequency, Self-Reported Oral Ulcers and SARS-Cov-2 Infection during the First Wave of the COVID-19 Pandemic: A Global ," IJERPH, MDPI, vol. 19(18), pages 1-11, September.
    6. Shannon Davis & Andrey Shevchuk & Denis Strebkov, 2014. "Pathways to Satisfaction with Work-Life Balance: The Case of Russian-Language Internet Freelancers," Journal of Family and Economic Issues, Springer, vol. 35(4), pages 542-556, December.
    7. Vicente Gea-Caballero & José Ramón Martínez-Riera & Pedro García-Martínez & Jorge Casaña-Mohedo & Isabel Antón-Solanas & María Virtudes Verdeguer-Gómez & Iván Santolaya-Arnedo & Raúl Juárez-Vela, 2021. "Study of the Strengths and Weaknesses of Nursing Work Environments in Primary Care in Spain," IJERPH, MDPI, vol. 18(2), pages 1-12, January.
    8. Vendrell-Herrero, Ferran & Bustinza, Oscar F. & Opazo-Basaez, Marco, 2021. "Information technologies and product-service innovation: The moderating role of service R&D team structure," Journal of Business Research, Elsevier, vol. 128(C), pages 673-687.
    9. Ákos Münnich & Mátyás Kocsis & Mark C. Mainwaring & István Fónagy & Jenő Nagy, 2025. "Interview completed: the application of survival analysis to detect factors influencing response rates in online surveys," Journal of Marketing Analytics, Palgrave Macmillan, vol. 13(1), pages 202-217, March.
    10. R. Jayaraman, 2021. "An Empirical Study of Delays in Large Engineering Projects: An Indian Experience," Jindal Journal of Business Research, , vol. 10(1), pages 49-76, June.
    11. Andrea Serge & Johana Quiroz Montoya & Francisco Alonso & Luis Montoro, 2021. "Socioeconomic Status, Health and Lifestyle Settings as Psychosocial Risk Factors for Road Crashes in Young People: Assessing the Colombian Case," IJERPH, MDPI, vol. 18(3), pages 1-22, January.
    12. Achintya Ghatak & Adarsh Garg, 2022. "Power transmission project: a framework to align project success with organization goal," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(4), pages 1817-1833, August.
    13. Safi Ullah & Muhammad Siddiq & Deng Xiaopeng & Sun Jun & Diana R. Anbar & Chiemela Victor Amaechi & Muhammad Waqas Ashraf, 2025. "Identifying the Most Effective Delaying Factors Using FCEM-AHP: A Case Study of Pakistan’s Construction Industry," Journal of the Knowledge Economy, Springer;Portland International Center for Management of Engineering and Technology (PICMET), vol. 16(3), pages 13589-13623, September.
    14. Ahmed Hassan Abdou & Majed Abdulaziz Al Abdulathim & Nadia Rebhi Hussni Hasan & Maha Hassan Ahmed Salah & Howayda Said Ahmed Mohamed Ali & Nancy J. Kamel, 2023. "From Green Inclusive Leadership to Green Organizational Citizenship: Exploring the Mediating Role of Green Work Engagement and Green Organizational Identification in the Hotel Industry Context," Sustainability, MDPI, vol. 15(20), pages 1-22, October.
    15. Konstantinos Nikolaos Vasileiadis & Konstantinos Alexandros Tsioumis & Argyris Kyridis, 2013. "The Effects of Dominant Ideology on Teachers¡¯ Perceptions and Practices towards the ¡°Other¡±," International Journal of Learning and Development, Macrothink Institute, vol. 3(1), pages 33-48, December.
    16. Dr. Mwenda, Mary Nyawira & Dr. Otieno- Omutoko Lillian & Prof. Christopher Gakuu, 2021. "The Nexus between Project Monitoring and Evaluation and Quality of Residential Buildings in Nairobi County, Kenya," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 5(1), pages 354-362, January.
    17. Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 0. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-10.
    18. Lara Fontanella & Paola Villano & Marika Di Donato, 2016. "Attitudes towards Roma people and migrants: a comparison through a Bayesian multidimensional IRT model," Quality & Quantity: International Journal of Methodology, Springer, vol. 50(2), pages 471-490, March.
    19. Vendrell-Herrero, Ferran & Gomes, Emanuel & Bustinza, Oscar F. & Mellahi, Kamel, 2018. "Uncovering the role of cross-border strategic alliances and expertise decision centralization in enhancing product-service innovation in MMNEs," International Business Review, Elsevier, vol. 27(4), pages 814-825.
    20. Ioan-Sebastian Brumă & Cristina Cautisanu & Lucian Tanasă & Simona-Roxana Ulman & Meda Gâlea & Alexandra Raluca Jelea, 2024. "Does the payment method matter in online shopping behaviour? Study on the Romanian market of vegetables during the pandemic crisis," Agricultural Economics, Czech Academy of Agricultural Sciences, vol. 70(1), pages 34-47.

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:6:p:3521-:d:773086. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.