Author
Listed:
- Luay F. Al-Mamory
(Department of Mechanical Engineering, Faculty of Engineering, Karabuk University, Karabük 78050, Turkey
General Company for The Distribution of Middle Euphrates Electricity, Ministry of Electricity, Babylon 51001, Iraq)
- Mehmet E. Akay
(Department of Mechanical Engineering, Faculty of Engineering, Karabuk University, Karabük 78050, Turkey)
- Hasanain A. Abdul Wahhab
(Training and Workshop Center, Ministry of Higher Education & Scientific Research, University of Technology-Iraq, Baghdad 10066, Iraq)
Abstract
The growing global demand for sustainable energy solutions has spurred interest in hybrid renewable energy systems, particularly those combining photovoltaic (PV) solar and wind power. This study records the technical and financial feasibility of establishing hybrid solar photovoltaic and wind power stations in Iraq, Al-Rutbah and Al-Nasiriya, with a total power of 60 MW for each, focusing on optimizing energy output and cost-efficiency. The analysis evaluates key technical factors, such as resource availability, system design, and integration challenges, alongside financial considerations, including capital costs, operational expenses, and return on investment (ROI). Using the RETScreen program, the research explores potential locations and configurations for maximizing energy production and minimizing costs, and the evaluation is performed through the calculation Internal Rate of Return (IRR) on equity (%), the Simple Payback (year), the Net Present Value (NPV), and the Annual Life Cycle Savings (ALCSs). The results show that both PV and wind technologies demonstrate significant energy export potential, with PV plants exporting slightly more electricity than their wind counterparts. Al Nasiriya Wind had the highest output, indicating favorable wind conditions or better system performance at that site. The results show that the analysis of the proposed hybrid system has a standardizing effect on emissions, reducing variability and environmental impact regardless of location. The results demonstrate that solar PV is significantly more financially favorable in terms of capital recovery time at both sites, and that financial incentives, especially grants, are essential to improve project attractiveness, particularly for wind power. The analysis underscores the superior financial viability of solar PV projects in both regions. It highlights the critical role of financial support, particularly capital grants, in turning renewable energy investments into economically attractive opportunities.
Suggested Citation
Luay F. Al-Mamory & Mehmet E. Akay & Hasanain A. Abdul Wahhab, 2025.
"Technical and Economic Assessment of the Implementation of 60 MW Hybrid Power Plant Projects (Wind, Solar Photovoltaic) in Iraq,"
Sustainability, MDPI, vol. 17(13), pages 1-22, June.
Handle:
RePEc:gam:jsusta:v:17:y:2025:i:13:p:5853-:d:1687228
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:17:y:2025:i:13:p:5853-:d:1687228. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.