IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v15y2023i8p6651-d1123583.html
   My bibliography  Save this article

Identification of Key Design Phase-Related Risks in DBB Projects in the UAE—Towards Developing a BIM Solution

Author

Listed:
  • Deena Badran

    (College of Engineering, University of Sharjah, Sharjah P.O. Box 27272, United Arab Emirates)

  • Radhi AlZubaidi

    (College of Engineering, University of Sharjah, Sharjah P.O. Box 27272, United Arab Emirates)

  • Senthilkumar Venkatachalam

    (Indian Institute of Technology Palakkad, Palakkad 678 623, India)

Abstract

Building Information Modelling (BIM) has become a widely used concept in high-rise buildings in the United Arab Emirates (UAE). However, the risks associated with the design phase of multi-story high-rise building projects have, to date, not been addressed by the research studies conducted in the UAE. The results show that “Time Spent in Approval Process” is the main cause of delay, “Complying with the New Regulations and Rules” is the main cause of cost overrun and “Poor Coordination between the Design Disciplines” is the main cause of the quality deficiency. The results also indicate that “Poor Coordination between the Design Disciplines’’ is the only risk that has a high-risk index related to time, cost, and quality. “Change Initiated by the Client” and “Interface by the Client during the Design Process” are ranked among the top five risks which cause delay and cost overrun in UAE high-rise buildings. The paper mapped the root causes of the identified most significant risks against the possible BIM-based solutions. The results show that BIM can effectively mitigate 75% of the root causes of these risks and, further, BIM is also effective in managing the consequences of the root causes for the remaining the remaining 25%.

Suggested Citation

  • Deena Badran & Radhi AlZubaidi & Senthilkumar Venkatachalam, 2023. "Identification of Key Design Phase-Related Risks in DBB Projects in the UAE—Towards Developing a BIM Solution," Sustainability, MDPI, vol. 15(8), pages 1-23, April.
  • Handle: RePEc:gam:jsusta:v:15:y:2023:i:8:p:6651-:d:1123583
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/15/8/6651/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/15/8/6651/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Rafael Sacks & Jennifer Whyte & Dana Swissa & Gabriel Raviv & Wei Zhou & Aviad Shapira, 2015. "Safety by design: dialogues between designers and builders using virtual reality," Construction Management and Economics, Taylor & Francis Journals, vol. 33(1), pages 55-72, January.
    2. Arshi Shakeel Faridi & Sameh Monir El-Sayegh, 2006. "Significant factors causing delay in the UAE construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 24(11), pages 1167-1176.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
    2. R. Jayaraman, 2021. "An Empirical Study of Delays in Large Engineering Projects: An Indian Experience," Jindal Journal of Business Research, , vol. 10(1), pages 49-76, June.
    3. Yazan Issa Abu Aisheh, 2021. "Lessons Learned, Barriers, and Improvement Factors for Mega Building Construction Projects in Developing Countries: Review Study," Sustainability, MDPI, vol. 13(19), pages 1-17, September.
    4. Achintya Ghatak & Adarsh Garg, 2022. "Power transmission project: a framework to align project success with organization goal," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(4), pages 1817-1833, August.
    5. Antonio Héctor Álvarez-Pozo & Miguel Ignacio Parma-García & Isabel Ortiz-Marcos & Luis Fernando Bautista & Evangelina Atanes-Sánchez, 2024. "Analysis of Causes of Delays and Cost Overruns as Well as Mitigation Measures to Improve Profitability and Sustainability in Turnkey Industrial Projects," Sustainability, MDPI, vol. 16(4), pages 1-16, February.
    6. Dr. Mwenda, Mary Nyawira & Dr. Otieno- Omutoko Lillian & Prof. Christopher Gakuu, 2021. "The Nexus between Project Monitoring and Evaluation and Quality of Residential Buildings in Nairobi County, Kenya," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 5(1), pages 354-362, January.
    7. Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 0. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-10.
    8. Hongtao Xie & Junwei Zheng & Yunhua Zhang & Hongyang Li, 2019. "Effects of Payment Delays at Two Links in Payment Chains on the Progress of Construction Projects: System Dynamic Modeling and Simulation," Sustainability, MDPI, vol. 11(15), pages 1-25, July.
    9. Hussain, Shahid & Xuetong, Wang & Maqbool, Rashid & Hussain, Mustansar & Shahnawaz, Muhammad, 2022. "The influence of government support, organizational innovativeness and community participation in renewable energy project success: A case of Pakistan," Energy, Elsevier, vol. 239(PC).
    10. Gondia, Ahmed & Moussa, Ahmed & Ezzeldin, Mohamed & El-Dakhakhni, Wael, 2023. "Machine learning-based construction site dynamic risk models," Technological Forecasting and Social Change, Elsevier, vol. 189(C).
    11. Goutom K. Pall & Adrian J. Bridge & Jason Gray & Martin Skitmore, 2019. "Causes of Delay in Power Transmission Projects: An Empirical Study," Energies, MDPI, vol. 13(1), pages 1-29, December.
    12. Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 2020. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(6), pages 1250-1259, December.
    13. Mihić Matej & Vukomanović Mladen & Završki Ivica, 2019. "Review of previous applications of innovative information technologies in construction health and safety," Organization, Technology and Management in Construction, Sciendo, vol. 11(1), pages 1952-1967, January.
    14. Muhammad Tariq Shafiq & Muneeb Afzal, 2020. "Potential of Virtual Design Construction Technologies to Improve Job-Site Safety in Gulf Corporation Council," Sustainability, MDPI, vol. 12(9), pages 1-21, May.
    15. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2019. "Materials Challenges in Reconstruction of Historical Projects: A Case Study of the Old Riwaq Project," Sustainability, MDPI, vol. 11(17), pages 1-19, August.
    16. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2020. "Delay Factors Management and Ranking for Reconstruction and Rehabilitation Projects Based on the Relative Importance Index (RII)," Sustainability, MDPI, vol. 12(15), pages 1-21, July.
    17. Faham Tahmasebinia & Vicheth Song, 2022. "Significant Factors Causing Delay in the Cambodian Construction Industry," Sustainability, MDPI, vol. 14(6), pages 1-24, March.
    18. Abdelrahman Abdalla Alhelo & Radhi Alzubaidi & Hamad Rashid, 2023. "A Framework Supporting Health and Safety Practices in the United Arab Emirates’ Construction Projects," Sustainability, MDPI, vol. 15(2), pages 1-14, January.
    19. Hemanta Doloi & Anil Sawhney & K.C. Iyer, 2012. "Structural equation model for investigating factors affecting delay in Indian construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 30(10), pages 869-884, October.
    20. Murat Gunduz & Hamza M. A. Lutfi, 2021. "Go/No-Go Decision Model for Owners Using Exhaustive CHAID and QUEST Decision Tree Algorithms," Sustainability, MDPI, vol. 13(2), pages 1-24, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:8:p:6651-:d:1123583. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.