Open-Pit Mine Truck Dispatching System Based on Dynamic Ore Blending Decisions

Author

Listed:
  • Jiang Yao

    (College of Resources and Civil Engineering, Northeastern University, Shenyang 110819, China)

  • Zhiqiang Wang

    (Chinese Academy of Sciences Allwin Technology Co., Ltd., Shenyang 110179, China)

  • Hongbin Chen

    (Ansteel Mining Design and Research Institute Co., Ltd., Anshan 114001, China)

  • Weigang Hou

    (Ansteel Mining Design and Research Institute Co., Ltd., Anshan 114001, China)

  • Xiaomiao Zhang

    (Ansteel Mining Design and Research Institute Co., Ltd., Anshan 114001, China)

  • Xu Li

    (Chinese Academy of Sciences Allwin Technology Co., Ltd., Shenyang 110179, China)

  • Weixing Yuan

    (Chinese Academy of Sciences Allwin Technology Co., Ltd., Shenyang 110179, China)

Abstract

In the production process of open-pit mines, trucks are applied in the production process of open-pit mines for transporting ores and rocks. Most open-pit mines are equipped with dozens of trucks. It is important to plan the dispatch of trucks in the production process so that the transportation process can be the shortest in distance, the lowest in cost, and the most efficient. At present, many open-pit mining enterprises have realized the use of dispatching systems to schedule trucks to complete production tasks. However, these methods are mostly designed to deploy trucks to reduce production costs without considering the blending problem of the selected ores, and therefore it cannot meet the dual need of ore blending and dispatching. In order to solve the above technical problems and meet the actual needs of the current open-pit mine for ore blending and dispatching, this paper proposes an open-pit mine truck dispatching system based on dynamic ore blending decisions, supported by a 4G/5G wireless network, Beidou positioning, and Internet of Things technology, which can not only realize the optimized truck dispatching of open-pit mine production, but also meet the requirements of downstream concentrators for ore dressing grade. The system has been applied in the Ansteel Group QIDASHAN mine for one year. The proportion of trucks dispatched through the system reached more than 70%. The trucks’ capacity were upgraded from 3.79 to 4 million ton km per set per year, and the efficiency was improved by 5.5%. The limitations of the proposed system and method mainly include the possibility of inaccurate measurement of ore output and the lack of combination with unmanned driving.

Suggested Citation

  • Jiang Yao & Zhiqiang Wang & Hongbin Chen & Weigang Hou & Xiaomiao Zhang & Xu Li & Weixing Yuan, 2023. "Open-Pit Mine Truck Dispatching System Based on Dynamic Ore Blending Decisions," Sustainability, MDPI, vol. 15(4), pages 1-12, February.
  • Handle: RePEc:gam:jsusta:v:15:y:2023:i:4:p:3399-:d:1066639
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/15/4/3399/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/15/4/3399/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. W. Lambert & A. Newman, 2014. "Tailored Lagrangian Relaxation for the open pit block sequencing problem," Annals of Operations Research, Springer, vol. 222(1), pages 419-438, November.
    2. Lu Chen & Qinghua Gu & Rui Wang & Zhidong Feng & Chao Zhang, 2022. "Comprehensive Utilization of Mineral Resources: Optimal Blending of Polymetallic Ore Using an Improved NSGA-III Algorithm," Sustainability, MDPI, vol. 14(17), pages 1-19, August.
    3. Lamghari, Amina & Dimitrakopoulos, Roussos, 2012. "A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty," European Journal of Operational Research, Elsevier, vol. 222(3), pages 642-652.
    4. Moreno, Eduardo & Rezakhah, Mojtaba & Newman, Alexandra & Ferreira, Felipe, 2017. "Linear models for stockpiling in open-pit mine production scheduling problems," European Journal of Operational Research, Elsevier, vol. 260(1), pages 212-221.
    5. Asif Khan & Christian Niemann-Delius, 2014. "Production Scheduling of Open Pit Mines Using Particle Swarm Optimization Algorithm," Advances in Operations Research, Hindawi, vol. 2014, pages 1-9, November.
    6. Beixin Xia & Tong Tian & Yan Gao & Mingyue Zhang & Yunfang Peng, 2022. "A Dynamic Dispatching Method for Large-Scale Interbay Material Handling Systems of Semiconductor FAB," Sustainability, MDPI, vol. 14(21), pages 1-19, October.
    7. Shishvan, Masoud Soleymani & Sattarvand, Javad, 2015. "Long term production planning of open pit mines by ant colony optimization," European Journal of Operational Research, Elsevier, vol. 240(3), pages 825-836.
    8. Xiangyu Kou & Xuebin Xie & Yi Zou & Qian Kang & Qi Liu, 2022. "Research on Comprehensive Evaluation Model of a Truck Dispatching System in Open-Pit Mine," Sustainability, MDPI, vol. 14(15), pages 1-16, July.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Samavati, Mehran & Essam, Daryl & Nehring, Micah & Sarker, Ruhul, 2017. "A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry," International Journal of Production Economics, Elsevier, vol. 193(C), pages 12-20.
    2. Zeng, Lanyan & Liu, Shi Qiang & Kozan, Erhan & Corry, Paul & Masoud, Mahmoud, 2021. "A comprehensive interdisciplinary review of mine supply chain management," Resources Policy, Elsevier, vol. 74(C).
    3. Franco-Sepúlveda, Giovanni & Del Rio-Cuervo, Juan Camilo & Pachón-Hernández, María Angélica, 2019. "State of the art about metaheuristics and artificial neural networks applied to open pit mining," Resources Policy, Elsevier, vol. 60(C), pages 125-133.
    4. Chatterjee, Snehamoy & Sethi, Manas Ranjan & Asad, Mohammad Waqar Ali, 2016. "Production phase and ultimate pit limit design under commodity price uncertainty," European Journal of Operational Research, Elsevier, vol. 248(2), pages 658-667.
    5. Tabesh, Mohammad & Moradi Afrapoli, Ali & Askari-Nasab, Hooman, 2023. "A two-stage simultaneous optimization of NPV and throughput in production planning of open pit mines," Resources Policy, Elsevier, vol. 80(C).
    6. Jélvez, Enrique & Morales, Nelson & Nancel-Penard, Pierre & Cornillier, Fabien, 2020. "A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application," Omega, Elsevier, vol. 94(C).
    7. Zheng, Xiaolei & Nguyen, Hoang & Bui, Xuan-Nam, 2021. "Exploring the relation between production factors, ore grades, and life of mine for forecasting mining capital cost through a novel cascade forward neural network-based salp swarm optimization model," Resources Policy, Elsevier, vol. 74(C).
    8. Devendra Joshi & Marwan Ali Albahar & Premkumar Chithaluru & Aman Singh & Arvind Yadav & Yini Miro, 2022. "A Novel Approach to Integrating Uncertainty into a Push Re-Label Network Flow Algorithm for Pit Optimization," Mathematics, MDPI, vol. 10(24), pages 1-20, December.
    9. Danish, Abid Ali Khan & Khan, Asif & Muhammad, Khan & Ahmad, Waqas & Salman, Saad, 2021. "A simulated annealing based approach for open pit mine production scheduling with stockpiling option," Resources Policy, Elsevier, vol. 71(C).
    10. Paithankar, Amol & Chatterjee, Snehamoy & Goodfellow, Ryan & Asad, Mohammad Waqar Ali, 2020. "Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation," Resources Policy, Elsevier, vol. 66(C).
    11. Samavati, Mehran & Essam, Daryl & Nehring, Micah & Sarker, Ruhul, 2017. "A local branching heuristic for the open pit mine production scheduling problem," European Journal of Operational Research, Elsevier, vol. 257(1), pages 261-271.
    12. Paithankar, Amol & Chatterjee, Snehamoy & Goodfellow, Ryan, 2021. "Open-pit mining complex optimization under uncertainty with integrated cut-off grade based destination policies," Resources Policy, Elsevier, vol. 70(C).
    13. Ivorra, Benjamin & Mohammadi, Bijan & Manuel Ramos, Angel, 2015. "A multi-layer line search method to improve the initialization of optimization algorithms," European Journal of Operational Research, Elsevier, vol. 247(3), pages 711-720.
    14. Amina Lamghari & Roussos Dimitrakopoulos & Jacques Ferland, 2015. "A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines," Journal of Global Optimization, Springer, vol. 63(3), pages 555-582, November.
    15. King, Barry & Goycoolea, Marcos & Newman, A., 2017. "Optimizing the open pit-to-underground mining transition," European Journal of Operational Research, Elsevier, vol. 257(1), pages 297-309.
    16. César Flores-Fonseca & Rodrigo Linfati & John Willmer Escobar, 2022. "Exact algorithms for production planning in mining considering the use of stockpiles and sequencing of power shovels in open-pit mines," Operational Research, Springer, vol. 22(3), pages 2529-2553, July.
    17. Lu Chen & Qinghua Gu & Rui Wang & Zhidong Feng & Chao Zhang, 2022. "Comprehensive Utilization of Mineral Resources: Optimal Blending of Polymetallic Ore Using an Improved NSGA-III Algorithm," Sustainability, MDPI, vol. 14(17), pages 1-19, August.
    18. Nancel-Penard, Pierre & Morales, Nelson & Cornillier, Fabien, 2022. "A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: An application to the open-pit mine block sequencing problem," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1088-1099.
    19. Jiang, Haiyan & Wang, Jianzhou & Wu, Jie & Geng, Wei, 2017. "Comparison of numerical methods and metaheuristic optimization algorithms for estimating parameters for wind energy potential assessment in low wind regions," Renewable and Sustainable Energy Reviews, Elsevier, vol. 69(C), pages 1199-1217.
    20. Jélvez, Enrique & Morales, Nelson & Nancel-Penard, Pierre & Peypouquet, Juan & Reyes, Patricio, 2016. "Aggregation heuristic for the open-pit block scheduling problem," European Journal of Operational Research, Elsevier, vol. 249(3), pages 1169-1177.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:4:p:3399-:d:1066639. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.