IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v15y2023i13p10312-d1183279.html
   My bibliography  Save this article

Analyzing the Factors for Implementing Make-to-Order Manufacturing System

Author

Listed:
  • Surbhi Upadhyay

    (Department of Mechanical Engineering, Delhi Technological University, Delhi 110042, India)

  • Suresh Kumar Garg

    (Department of Mechanical Engineering, Delhi Technological University, Delhi 110042, India)

  • Rishu Sharma

    (Department of Mechanical Engineering, G B Pant DSEU, Okhla 1 Campus, New Delhi 110020, India)

Abstract

Make-to-order (MTO) is becoming vital for meeting ever-changing customer requirements. Growing demand for customized items has been linked to a rise in the proportion of MTO businesses. Many sectors and product categories have implemented the MTO concept and achieved a competitive edge in sustainable manufacturing. However, in the case of the automobile sector, little work has been carried out, both in research and practice. In this study, our objective is to identify and prioritize the critical success factors (CSF) which can affect the implementation of make-to-order and rank the different strategies to implement MTO manufacturing systems for passenger cars. This paper proposes an integrated approach where an Analytic Hierarchy Process (AHP) is used for prioritizing factors and the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) is used for ranking the strategies for implementation. The study shows that a customer-centric strategy would be the best solution to implement MTO in the automobile sector.

Suggested Citation

  • Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.
  • Handle: RePEc:gam:jsusta:v:15:y:2023:i:13:p:10312-:d:1183279
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/15/13/10312/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/15/13/10312/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Haskose, A. & Kingsman, B. G. & Worthington, D, 2004. "Performance analysis of make-to-order manufacturing systems under different workload control regimes," International Journal of Production Economics, Elsevier, vol. 90(2), pages 169-186, July.
    2. Kingsman, Brian & Hendry, Linda & Mercer, Alan & de Souza, Antonio, 1996. "Responding to customer enquiries in make-to-order companies Problems and solutions," International Journal of Production Economics, Elsevier, vol. 46(1), pages 219-231, December.
    3. Sun, X.Y. & Ji, P. & Sun, L.Y. & Wang, Y.L., 2008. "Positioning multiple decoupling points in a supply network," International Journal of Production Economics, Elsevier, vol. 113(2), pages 943-956, June.
    4. Almehdawe, Eman & Jewkes, Elizabeth, 2013. "Performance analysis and optimization of hybrid manufacturing systems under a batch ordering policy," International Journal of Production Economics, Elsevier, vol. 144(1), pages 200-208.
    5. Easton, Fred F. & Moodie, Douglas R., 1999. "Pricing and lead time decisions for make-to-order firms with contingent orders," European Journal of Operational Research, Elsevier, vol. 116(2), pages 305-318, July.
    6. Fernandes, Nuno O. & Silva, Cristóvão & Carmo-Silva, S., 2015. "Order release in the hybrid MTO–FTO production," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 513-520.
    7. Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
    8. Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
    9. Ebadian, M. & Rabbani, M. & Jolai, F. & Torabi, S.A. & Tavakkoli-Moghaddam, R., 2008. "A new decision-making structure for the order entry stage in make-to-order environments," International Journal of Production Economics, Elsevier, vol. 111(2), pages 351-367, February.
    10. Ilenia Zennaro & Serena Finco & Daria Battini & Alessandro Persona, 2019. "Big size highly customised product manufacturing systems: a literature review and future research agenda," International Journal of Production Research, Taylor & Francis Journals, vol. 57(15-16), pages 5362-5385, August.
    11. Oliveira, Gilson Adamczuk & Tan, Kim Hua & Guedes, Bruno Turmina, 2018. "Lean and green approach: An evaluation tool for new product development focused on small and medium enterprises," International Journal of Production Economics, Elsevier, vol. 205(C), pages 62-73.
    12. He, N. & Zhang, D.Z. & Li, Q., 2014. "Agent-based hierarchical production planning and scheduling in make-to-order manufacturing system," International Journal of Production Economics, Elsevier, vol. 149(C), pages 117-130.
    13. Alao, M.A. & Ayodele, T.R. & Ogunjuyigbe, A.S.O. & Popoola, O.M., 2020. "Multi-criteria decision based waste to energy technology selection using entropy-weighted TOPSIS technique: The case study of Lagos, Nigeria," Energy, Elsevier, vol. 201(C).
    14. Madhukar Chhimwal & Saurabh Agrawal & Girish Kumar, 2021. "Measuring Circular Supply Chain Risk: A Bayesian Network Methodology," Sustainability, MDPI, vol. 13(15), pages 1-22, July.
    15. Tomino, Takahiro & Park, Youngwon & Hong, Paul & Roh, James Jungbae, 2009. "Market flexible customizing system (MFCS) of Japanese vehicle manufacturers: An analysis of Toyota, Nissan and Mitsubishi," International Journal of Production Economics, Elsevier, vol. 118(2), pages 375-386, April.
    16. Zixin Dou & BeiBei Wu & Yanming Sun & Tao Wang, 2021. "The Competitiveness of Manufacturing and Its Driving Factors: A Case Study of G20 Participating Countries," Sustainability, MDPI, vol. 13(3), pages 1-17, January.
    17. Li, Haitao & Womer, Keith, 2012. "Optimizing the supply chain configuration for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 118-128.
    18. Kay Peeters & Henny van Ooijen, 2020. "Hybrid make-to-stock and make-to-order systems: a taxonomic review," International Journal of Production Research, Taylor & Francis Journals, vol. 58(15), pages 4659-4688, July.
    19. Young-Kyou Ha & Su-Han Woo, 2022. "Transportation Infrastructure or Economic Power? Development of the Automobile Industry in the United States," Sustainability, MDPI, vol. 14(3), pages 1-11, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Helia Yousefnejad & Maryam Esmaeili, 2020. "Tactical production planning in a hybrid MTS/MTO system using Stackelberg game," Operational Research, Springer, vol. 20(3), pages 1791-1809, September.
    2. Ebadian, M. & Rabbani, M. & Jolai, F. & Torabi, S.A. & Tavakkoli-Moghaddam, R., 2008. "A new decision-making structure for the order entry stage in make-to-order environments," International Journal of Production Economics, Elsevier, vol. 111(2), pages 351-367, February.
    3. Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
    4. Cakravastia, Andi & Toha, Isa S. & Nakamura, Nobuto, 2002. "A two-stage model for the design of supply chain networks," International Journal of Production Economics, Elsevier, vol. 80(3), pages 231-248, December.
    5. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    6. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
    7. Mile Katic & Renu Agarwal, 2018. "The Flexibility Paradox: Achieving Ambidexterity in High-Variety, Low-Volume Manufacturing," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 19(1), pages 69-86, March.
    8. Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
    9. Zorzini, Marta & Stevenson, Mark & Hendry, Linda C., 2012. "Customer Enquiry Management in global supply chains: A comparative multi-case study analysis," European Management Journal, Elsevier, vol. 30(2), pages 121-140.
    10. Gosling, Jonathan & Naim, Mohamed M., 2009. "Engineer-to-order supply chain management: A literature review and research agenda," International Journal of Production Economics, Elsevier, vol. 122(2), pages 741-754, December.
    11. Watanapa, Bunthit & Techanitisawad, Anulark, 2005. "Simultaneous price and due date settings for multiple customer classes," European Journal of Operational Research, Elsevier, vol. 166(2), pages 351-368, October.
    12. Afshin Mansouri, S. & Gallear, David & Askariazad, Mohammad H., 2012. "Decision support for build-to-order supply chain management through multiobjective optimization," International Journal of Production Economics, Elsevier, vol. 135(1), pages 24-36.
    13. Hendry, L. & Land, M. & Stevenson, M. & Gaalman, G., 2008. "Investigating implementation issues for workload control (WLC): A comparative case study analysis," International Journal of Production Economics, Elsevier, vol. 112(1), pages 452-469, March.
    14. Gansterer, Margaretha, 2015. "Aggregate planning and forecasting in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 521-528.
    15. Shouyao Xiong & Yuanyuan Feng & Kai Huang, 2020. "Optimal MTS and MTO Hybrid Production System for a Single Product Under the Cap-And-Trade Environment," Sustainability, MDPI, vol. 12(6), pages 1-16, March.
    16. Kim, Hyunjung & Kim, Eungab, 2022. "A hybrid manufacturing system with demand for intermediate goods and controllable make-to-stock production rate," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1244-1257.
    17. Dieter Fiems & Eline De Cuypere & Koen De Turck & Dieter Claeys, 2020. "Performance Analysis of Hybrid MTS/MTO Systems with Stochastic Demand and Production," Mathematics, MDPI, vol. 8(11), pages 1-16, November.
    18. Amirhosein Gholami & Nasim Nezamoddini & Mohammad T. Khasawneh, 2023. "Customized orders management in connected make-to-order supply chains," Operations Management Research, Springer, vol. 16(3), pages 1428-1443, September.
    19. Birutė Mikulskienė & Julija Moskvina, 2020. "Peculiar properties of the pricing process in customized furniture manufacturing enterprises," Journal of Revenue and Pricing Management, Palgrave Macmillan, vol. 19(6), pages 411-420, December.
    20. Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:13:p:10312-:d:1183279. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.