Possession of Site: Another Layer of Complexity in Road Construction
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Abdullah Rasheed Alhajri & Adel Alshibani, 2018. "Critical Factors behind Construction Delay in Petrochemical Projects in Saudi Arabia," Energies, MDPI, vol. 11(7), pages 1-18, June.
- Hakimi, Shadi & Kockelman, Kara M., 2005. "Right-of-Way Acquisition and Property Condemnation: A Comparison of U.S. State Laws," Journal of the Transportation Research Forum, Transportation Research Forum, vol. 44(3).
- A. V. Thomas & Satyanarayana Kalidindi & L. S. Ganesh, 2006. "Modelling and assessment of critical risks in BOT road projects," Construction Management and Economics, Taylor & Francis Journals, vol. 24(4), pages 407-424.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Murat Gunduz & Abdulrahman Abu-Hijleh, 2020. "Assessment of Human Productivity Drivers for Construction Labor through Importance Rating and Risk Mapping," Sustainability, MDPI, vol. 12(20), pages 1-18, October.
- Herve Kabanda & Alex Romard & Fuze Yurtsever & Anjali Wadhera & Joshua Andrews & Craig Merrett, 2021. "Construction Time Estimation Function for Canadian Utility Scale Power Plants," Energies, MDPI, vol. 14(17), pages 1-16, August.
- Chang Albitres, Carlos M. & Krugler, Paul E. & Ibarra, Iraki & Montes, Edith, 2012. "A Dynamic Programming Optimization Approach for Budget Allocation to Early Right-of-Way Acquisitions," Journal of the Transportation Research Forum, Transportation Research Forum, vol. 51(3).
- Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying, 2015. "Modeling the impact of government guarantees on toll charge, road quality and capacity for Build-Operate-Transfer (BOT) road projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 78(C), pages 54-67.
- Abraham Park & Chen Yu Chang, 2013. "Impacts of Construction Events on the Project Equity Value of the Channel Tunnel Project," ERES eres2013_97, European Real Estate Society (ERES).
- Jokar, Ebrahim & Aminnejad, Babak & Lork, Alireza, 2021. "Assessing and Prioritizing Risks in Public-Private Partnership (PPP) Projects Using the Integration of Fuzzy Multi-Criteria Decision-Making Methods," Operations Research Perspectives, Elsevier, vol. 8(C).
- Yan Wang & Yujie Wang & Xiuyu Wu & Jiwang Li, 2020. "Exploring the Risk Factors of Infrastructure PPP Projects for Sustainable Delivery: A Social Network Perspective," Sustainability, MDPI, vol. 12(10), pages 1-26, May.
- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2019. "Materials Challenges in Reconstruction of Historical Projects: A Case Study of the Old Riwaq Project," Sustainability, MDPI, vol. 11(17), pages 1-19, August.
- Faham Tahmasebinia & Vicheth Song, 2022. "Significant Factors Causing Delay in the Cambodian Construction Industry," Sustainability, MDPI, vol. 14(6), pages 1-24, March.
- Alsultan, Marwan & Jun, Jungwook & Lambert, James H., 2020. "Program evaluation of highway access with innovative risk-cost-benefit analysis," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Hany Abd Elshakour Mohamed & Ahmed Ibrahim Eltohamy, 2022. "Critical Success Factors for Competitiveness of Egyptian Construction Companies," Sustainability, MDPI, vol. 14(17), pages 1-22, August.
- Khwaja Mateen Mazher & Albert P. C. Chan & Rafiq M. Choudhry & Hafiz Zahoor & David J. Edwards & Ahmed M. Ghaithan & Awsan Mohammed & Mubashir Aziz, 2022. "Identifying Measures of Effective Risk Management for Public–Private Partnership Infrastructure Projects in Developing Countries," Sustainability, MDPI, vol. 14(21), pages 1-19, October.
- Zhao, Zhen-Yu & Zuo, Jian & Zillante, George, 2013. "Factors influencing the success of BOT power plant projects in China: A review," Renewable and Sustainable Energy Reviews, Elsevier, vol. 22(C), pages 446-453.
- Jalil Heidary Dahooie & Amir Salar Vanaki & Hamid Reza Firoozfar & Edmundas Kazimieras Zavadskas & Audrius Čereška, 2020. "An Extension of the Failure Mode and Effect Analysis with Hesitant Fuzzy Sets to Assess the Occupational Hazards in the Construction Industry," IJERPH, MDPI, vol. 17(4), pages 1-22, February.
- Akbari Ahmadabadi, Ali & Heravi, Gholamreza, 2019. "Risk assessment framework of PPP-megaprojects focusing on risk interaction and project success," Transportation Research Part A: Policy and Practice, Elsevier, vol. 124(C), pages 169-188.
- Guo, Jian & Luo, Cheng & Ma, Kaijiang, 2023. "Risk coupling analysis of road transportation accidents of hazardous materials in complicated maritime environment," Reliability Engineering and System Safety, Elsevier, vol. 229(C).
- Sy, Do Tien & Likhitruangsilp, Veerasak & Onishi, Masamitsu & Nguyen, Phong Thanh, 2016. "Different Perceptions of Concern Factors for Strategic Investment of The Private Sector in Public-Private Partnership Transportation Projects," MPRA Paper 96581, University Library of Munich, Germany.
- Gatzert, Nadine & Vogl, Nikolai, 2016. "Evaluating investments in renewable energy under policy risks," Energy Policy, Elsevier, vol. 95(C), pages 238-252.
- Mohammad Ajmal Nikjow & Li Liang & Xijing Qi & Samad M. E. Sepasgozar & Nicholas Chileshe, 2021. "Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects," Sustainability, MDPI, vol. 13(17), pages 1-21, August.
- Yorela Yenifer Esperilla-Niño-de-Guzmán & María de los Ángeles Baeza-Muñoz & Francisco Jesús Gálvez-Sánchez & Valentín Molina-Moreno, 2024. "Public–Private Partnership (PPP) in Road Infrastructure Projects: A Review of Evolution, Approaches, and Prospects," Sustainability, MDPI, vol. 16(4), pages 1-24, February.
More about this item
Keywords
site possession; land acquisition; construction delay; road projects; Malaysia;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:11:p:6809-:d:830359. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.