IDEAS home Printed from https://ideas.repec.org/a/epw/ejgeo0/v1y2020i4id16054.html

Cost Over-Run in Civil Works: A Case-Study of Engineering, Procurement and Construction (EPC) Gas Depot Construction Projects in Nigeria

Author

Listed:
  • Chukwuemeka Patrick Ogbu
  • Raphael Ehigiator-Irughe

Abstract

Engineering, procurement and Construction (EPC) projects in the oil and gas sector of Nigeria are under-researched. This leaves investors with little or no guide on the cost-overrun risks of oil and gas depot projects. Using the qualitative case study research technique, this study investigated cost overrun in the civil works of a petroleum products depot project in Lagos, Nigeria. The objectives were to ascertain the reasons for cost overrun and the areas of substantial cost overrun in the project. It was found that except for the cost of construction of “gantry” which was under-measured as a result of use of a wrong method of costing, the rest of the major facilities experienced cost overrun with a cumulative difference of 106%. It was also discovered that the cost overruns mainly originated from design and construction activities. The study recommends the timely engagement of consultants to review the conceptual designs of contractors and monitor the activities of EPC contractors for oil and gas depot projects on behalf of clients. Such consultants should not, however, have powers to control the contractors. As much as possible, parties to EPC contracts should use standard conditions of contract that will better reflect their intentions rather than contrive bespoke conditions.

Suggested Citation

  • Chukwuemeka Patrick Ogbu & Raphael Ehigiator-Irughe, 2020. "Cost Over-Run in Civil Works: A Case-Study of Engineering, Procurement and Construction (EPC) Gas Depot Construction Projects in Nigeria," European Journal of Environment and Earth Sciences, European Open Science, vol. 1(4), July.
  • Handle: RePEc:epw:ejgeo0:v:1:y:2020:i:4:id:16054
    DOI: 10.24018/ejgeo.2020.1.4.54
    as

    Download full text from publisher

    File URL: https://eu-opensci.org/index.php/ejgeo/article/view/16054
    File Function: Abstract page
    Download Restriction: no

    File URL: https://eu-opensci.org/index.php/ejgeo/article/download/16054/3750
    File Function: Full text
    Download Restriction: no

    File URL: https://libkey.io/10.24018/ejgeo.2020.1.4.54?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Christopher Ehinomen & Adepoju Adeleke, 2012. "An assessment of the distribution of Petroleum products in Nigeria," E3 Journal of Business Management and Economics., E3 Journals, vol. 3(6), pages 232-241.
    2. Henning Grosse, 2019. "An insider’s point of view: autoethnography in the construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 37(9), pages 481-498, September.
    3. Odeck, James, 2004. "Cost overruns in road construction--what are their sizes and determinants?," Transport Policy, Elsevier, vol. 11(1), pages 43-53, January.
    4. Rui, Zhenhua & Cui, Kehang & Wang, Xiaoqing & Chun, Jung-Hoon & Li, Yuwei & Zhang, Zhien & Lu, Jun & Chen, Gang & Zhou, Xiyu & Patil, Shirish, 2018. "A comprehensive investigation on performance of oil and gas development in Nigeria: Technical and non-technical analyses," Energy, Elsevier, vol. 158(C), pages 666-680.
    5. Morten Welde & James Odeck, 2017. "Cost escalations in the front-end of projects – empirical evidence from Norwegian road projects," Transport Reviews, Taylor & Francis Journals, vol. 37(5), pages 612-630, September.
    6. Cantarelli, C.C. & Molin, E.J.E. & van Wee, B. & Flyvbjerg, B., 2012. "Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases," Transport Policy, Elsevier, vol. 22(C), pages 49-56.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Cavalieri, Marina & Cristaudo, Rossana & Guccio, Calogero, 2019. "On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects," Transport Policy, Elsevier, vol. 79(C), pages 21-36.
    2. Love, Peter E.D. & Sing, Michael C.P. & Ika, Lavagnon A. & Newton, Sidney, 2019. "The cost performance of transportation projects: The fallacy of the Planning Fallacy account," Transportation Research Part A: Policy and Practice, Elsevier, vol. 122(C), pages 1-20.
    3. Adriana Gómez-Cabrera & Amalia Sanz-Benlloch & Laura Montalban-Domingo & Jose Luis Ponz-Tienda & Eugenio Pellicer, 2020. "Identification of Factors Affecting the Performance of Rural Road Projects in Colombia," Sustainability, MDPI, vol. 12(18), pages 1-18, September.
    4. Edyta Plebankiewicz & Damian Wieczorek, 2020. "Prediction of Cost Overrun Risk in Construction Projects," Sustainability, MDPI, vol. 12(22), pages 1-15, November.
    5. Verweij, Stefan & van Meerkerk, Ingmar & Korthagen, Iris A., 2015. "Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration," Transport Policy, Elsevier, vol. 37(C), pages 195-202.
    6. Love, Peter E.D. & Zhou, Jingyang & Edwards, David J. & Irani, Zahir & Sing, Chun-Pong, 2017. "Off the rails: The cost performance of infrastructure rail projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 99(C), pages 14-29.
    7. Chong, Uven & Hopkins, Omar, 2016. "An international experience on the evolution of road costs during the project life cycle," Transport Policy, Elsevier, vol. 48(C), pages 60-66.
    8. Abeysekara, Baudhi & Perera, Piyaruwan & Chhipi Shrestha, Gyan Kumar & Gunaruwan, Lalithasiri & Kumarage, Amal & Sadiq, Rehan & Hewage, Kasun, 2021. "Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project," Research in Transportation Economics, Elsevier, vol. 88(C).
    9. Eliasson, Jonas, 2025. "Cost overruns of infrastructure projects – distributions, causes and remedies," Transportation Research Part A: Policy and Practice, Elsevier, vol. 198(C).
    10. Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Lunn, Daniel & Molin, Eric & Rønnes, 2018. "Five things you should know about cost overrun," Transportation Research Part A: Policy and Practice, Elsevier, vol. 118(C), pages 174-190.
    11. James Odeck, 2019. "Variation in cost overruns of transportation projects: an econometric meta-regression analysis of studies reported in the literature," Transportation, Springer, vol. 46(4), pages 1345-1368, August.
    12. Dejan Makovšek & Marian Moszoro, 2018. "Risk pricing inefficiency in public–private partnerships," Transport Reviews, Taylor & Francis Journals, vol. 38(3), pages 298-321, May.
    13. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D. & Irani, Zahir, 2016. "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 184-194.
    14. Catalão, Francisco Pinheiro & Cruz, Carlos Oliveira & Sarmento, Joaquim Miranda, 2019. "The determinants of cost deviations and overruns in transport projects, an endogenous models approach," Transport Policy, Elsevier, vol. 74(C), pages 224-238.
    15. Francisco Pinheiro Catalão & Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2023. "The entanglement of time and cost deviations in public projects," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 94(1), pages 241-272, March.
    16. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.
    17. Molinari, Laura & Haezendonck, Elvira & Mabillard, Vincent, 2023. "Cost overruns of Belgian transport infrastructure projects: Analyzing variations over three land transport modes and two project phases," Transport Policy, Elsevier, vol. 134(C), pages 167-179.
    18. Servranckx, Tom & Vanhoucke, Mario & Aouam, Tarik, 2021. "Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity," European Journal of Operational Research, Elsevier, vol. 295(3), pages 1161-1179.
    19. Morten Skou Nicolaisen & Patrick A. Driscoll, 2016. "An International Review of Ex-Post Project Evaluation Schemes in the Transport Sector," Journal of Environmental Assessment Policy and Management (JEAPM), World Scientific Publishing Co. Pte. Ltd., vol. 18(01), pages 1-33, March.
    20. Miranda Sarmento, J.J., 2014. "Public private partnerships," Other publications TiSEM c7d4c978-234c-4f88-83ed-1, Tilburg University, School of Economics and Management.

    More about this item

    Keywords

    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:epw:ejgeo0:v:1:y:2020:i:4:id:16054. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Support Team (email available below). General contact details of provider: https://eu-opensci.org/index.php/ejgeo .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.