IDEAS home Printed from https://ideas.repec.org/a/eee/trapol/v162y2025icp31-46.html
   My bibliography  Save this article

BOT contract of high-speed rail project design considering uncertain economic spillover

Author

Listed:
  • Liu, Yan
  • Ji, Zixin
  • Wang, Kun
  • Wang, Yushi
  • Xiao, Yibin

Abstract

The rapid development of high-speed rail (HSR) has had a significant impact on economic development, but it requires substantial investment and places a burden on public funds. The COVID-19 pandemic has further strained government budgets, making alternative funding models attractive. The build-operate-transfer (BOT) model, commonly used in highway projects, involves private companies building and operating infrastructure in exchange for toll revenues. This study explores the use of flexible and fixed BOT contracts for HSR projects and analyzes their impact on private sector investment share and social welfare in HSR projects. Our analytical and numerical simulation findings suggest that under the flexible BOT contract, the private sector investment share increases with the expectation and uncertainty of the economic spillover effect. It decreases with a short HSR infrastructure lifecycle but remains unaffected by a sufficiently long lifecycle. In contrast, a fixed BOT contract raises private sector investment share regardless of the uncertainty of economic spillover. A longer HSR lifecycle amplifies the effect of economic spillover under both types of contracts. Expected social welfare rises with the HSR infrastructure's lifecycle under the fixed BOT contract, but for the flexible BOT contract, it initially increases and then exhibits a jump-down discontinuity at the threshold lifecycle of the HSR infrastructure. The flexible BOT contract outperforms the fixed BOT contract with a shorter lifecycle or higher spillover uncertainty, while the fixed BOT contract yields more welfare improvements for a longer lifecycle.

Suggested Citation

  • Liu, Yan & Ji, Zixin & Wang, Kun & Wang, Yushi & Xiao, Yibin, 2025. "BOT contract of high-speed rail project design considering uncertain economic spillover," Transport Policy, Elsevier, vol. 162(C), pages 31-46.
  • Handle: RePEc:eee:trapol:v:162:y:2025:i:c:p:31-46
    DOI: 10.1016/j.tranpol.2024.11.018
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0967070X2400355X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.tranpol.2024.11.018?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Button, Kenneth, 2012. "Is there any economic justification for high-speed railways in the United States?," Journal of Transport Geography, Elsevier, vol. 22(C), pages 300-302.
    2. Wang, Kun & Xia, Wenyi & Zhang, Anming, 2017. "Should China further expand its high-speed rail network? Consider the low-cost carrier factor," Transportation Research Part A: Policy and Practice, Elsevier, vol. 100(C), pages 105-120.
    3. Zhang, Anming & Wan, Yulai & Yang, Hangjun, 2019. "Impacts of high-speed rail on airlines, airports and regional economies: A survey of recent research," Transport Policy, Elsevier, vol. 81(C), pages 1-19.
    4. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    5. Yang, Hai & Meng, Qiang, 2000. "Highway pricing and capacity choice in a road network under a build-operate-transfer scheme," Transportation Research Part A: Policy and Practice, Elsevier, vol. 34(3), pages 207-222, April.
    6. Jeffrey Clemens & Stan Veuger, 2020. "Implications of the COVID-19 Pandemic for State Government Tax Revenues," National Tax Journal, National Tax Association;National Tax Journal, vol. 73(3), pages 619-644, September.
    7. Komei Sasaki & Tadahiro Ohashi & Asao Ando, 1997. "High-speed rail transit impact on regional systems: does the Shinkansen contribute to dispersion?," The Annals of Regional Science, Springer;Western Regional Science Association, vol. 31(1), pages 77-98.
    8. Chen, Zhenhua & Haynes, Kingsley E., 2017. "Impact of high-speed rail on regional economic disparity in China," Journal of Transport Geography, Elsevier, vol. 65(C), pages 80-91.
    9. Liu, Shuli & Wan, Yulai & Zhang, Anming, 2020. "Does China’s high-speed rail development lead to regional disparities? A network perspective," Transportation Research Part A: Policy and Practice, Elsevier, vol. 138(C), pages 299-321.
    10. Bracaglia, Valentina & D'Alfonso, Tiziana & Nastasi, Alberto & Sheng, Dian & Wan, Yulai & Zhang, Anming, 2020. "High-speed rail networks, capacity investments and social welfare," Transportation Research Part A: Policy and Practice, Elsevier, vol. 132(C), pages 308-323.
    11. Verma, Ashish & Sudhira, H.S. & Rathi, Sujaya & King, Robin & Dash, Nibedita, 2013. "Sustainable urbanization using high speed rail (HSR) in Karnataka, India," Research in Transportation Economics, Elsevier, vol. 38(1), pages 67-77.
    12. Charanwanitwong, Thanaphon & Fraszczyk, Anna, 2018. "Rail liberalisation in Europe and lessons for Thailand: Policy makers vs. academic views," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 421-440.
    13. Marco Di Pietro & Luigi Marattin & Raoul Minetti, 2020. "Fiscal Policies Amid a Pandemic: The Response of Italy to the COVID-19 Crisis," National Tax Journal, National Tax Association;National Tax Journal, vol. 73(3), pages 927-950, September.
    14. Zhou, Zhengyi & Zhang, Anming, 2021. "High-speed rail and industrial developments: Evidence from house prices and city-level GDP in China," Transportation Research Part A: Policy and Practice, Elsevier, vol. 149(C), pages 98-113.
    15. Zhu, Zhenran & Zhang, Anming & Zhang, Yahua, 2018. "Connectivity of intercity passenger transportation in China: A multi-modal and network approach," Journal of Transport Geography, Elsevier, vol. 71(C), pages 263-276.
    16. repec:aei:rpaper:1008570714 is not listed on IDEAS
    17. Wang, Kun & Jiang, Changmin & Ng, Adolf K.Y. & Zhu, Zhenran, 2020. "Air and rail connectivity patterns of major city clusters in China," Transportation Research Part A: Policy and Practice, Elsevier, vol. 139(C), pages 35-53.
    18. Niu, Baozhuang & Zhang, Jie, 2013. "Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 1-14.
    19. Huang, Yuxia & Jiang, Chenxin & Wang, Kun & Xiao, Yibin & Zhang, Anming, 2021. "Public-private partnership in high-speed rail financing: Case of uncertain regional economic spillovers in China," Transport Policy, Elsevier, vol. 106(C), pages 64-75.
    20. Chen, Anthony & Subprasom, Kitti, 2007. "Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty," Transportation Research Part A: Policy and Practice, Elsevier, vol. 41(6), pages 537-558, July.
    21. Zhijia Tan & Hai Yang & Xiaolei Guo, 2009. "Build-operate-transfer Schemes for Road Franchising with Road Deterioration and Maintenance Effects," Springer Books, in: William H. K. Lam & S. C. Wong & Hong K. Lo (ed.), Transportation and Traffic Theory 2009: Golden Jubilee, chapter 0, pages 241-261, Springer.
    22. Fu, Xiaowen & Zhang, Anming & Lei, Zheng, 2012. "Will China’s airline industry survive the entry of high-speed rail?," Research in Transportation Economics, Elsevier, vol. 35(1), pages 13-25.
    23. Lu, Zhaoyang & Meng, Qiang, 2017. "Analysis of optimal BOT highway capacity and economic toll adjustment provisions under traffic demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 100(C), pages 17-37.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Huang, Yuxia & Jiang, Chenxin & Wang, Kun & Xiao, Yibin & Zhang, Anming, 2021. "Public-private partnership in high-speed rail financing: Case of uncertain regional economic spillovers in China," Transport Policy, Elsevier, vol. 106(C), pages 64-75.
    2. Chen, Yilin & Yang, Hangjun & Wang, Kun & Guo, Lin, 2022. "Intercity network expansion by low-cost carrier or high-speed rail, from the environmental perspective," Journal of Air Transport Management, Elsevier, vol. 104(C).
    3. Hoang-Tung, Nguyen & Viet Hung, Do & Kato, Hironori & Binh, Phan Le, 2021. "Modeling ceiling price for build-operate-transfer road projects in developing countries," Economics of Transportation, Elsevier, vol. 28(C).
    4. Liu, Jingyang & Yang, Haoran, 2023. "Income allocation and distribution along with high-speed rail development in China," Transportation Research Part A: Policy and Practice, Elsevier, vol. 175(C).
    5. Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
    6. Li, Tao & Rong, Lili, 2022. "Spatiotemporally complementary effect of high-speed rail network on robustness of aviation network," Transportation Research Part A: Policy and Practice, Elsevier, vol. 155(C), pages 95-114.
    7. Lu, Zhaoyang & Li, Yanfeng & Zuo, Dajie, 2024. "Period-dependent pricing methods of multi-type vehicles for BOT highway projects with pavement rehabilitation effects," Transport Policy, Elsevier, vol. 150(C), pages 84-94.
    8. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
    9. Sang, Jinyan & Li, Zhi-Chun & Lam, William H.K. & Wong, S.C., 2019. "Design of build-operate-transfer contract for integrated rail and property development with uncertainty in future urban population," Transportation Research Part B: Methodological, Elsevier, vol. 130(C), pages 36-66.
    10. Zhang, Anming & Wan, Yulai & Yang, Hangjun, 2019. "Impacts of high-speed rail on airlines, airports and regional economies: A survey of recent research," Transport Policy, Elsevier, vol. 81(C), pages 1-19.
    11. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    12. Ren, Xiaohang & Zeng, Gudian & Dong, Kangyin & Wang, Kun, 2023. "How does high-speed rail affect tourism development? The case of the Sichuan-Chongqing Economic Circle," Transportation Research Part A: Policy and Practice, Elsevier, vol. 169(C).
    13. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
    14. Sun, Xinyu & Yan, Sen & Liu, Tao & Wang, Jiayin, 2023. "The impact of high-speed rail on urban economy: Synergy with urban agglomeration policy," Transport Policy, Elsevier, vol. 130(C), pages 141-154.
    15. Wang, Fan & Xiong, Minghua & Niu, Baozhuang & Zhuo, Xiaopo, 2018. "Impact of government subsidy on BOT contract design: Price, demand, and concession period," Transportation Research Part B: Methodological, Elsevier, vol. 110(C), pages 137-159.
    16. Wei, Wei & Wang, Fengyi & Li, Tao & Li, Fangzhou, 2024. "Comprehensive impacts of high-speed rail and air transport on tourism development in China," Transportation Research Part A: Policy and Practice, Elsevier, vol. 190(C).
    17. Liu, Shuli & Wan, Yulai & Zhang, Anming, 2020. "Does China’s high-speed rail development lead to regional disparities? A network perspective," Transportation Research Part A: Policy and Practice, Elsevier, vol. 138(C), pages 299-321.
    18. Chen, Zhiyuan & Ye, Hanrui & Liu, Bingxi & Xue, Weili, 2021. "Analysis of road capacity and franchise price decision delegation in toll road BOT project," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 146(C).
    19. Wang, Chunan & Jiang, Changmin & Zhang, Anming, 2021. "Effects of Airline Entry on High-Speed Rail," Transportation Research Part B: Methodological, Elsevier, vol. 154(C), pages 242-265.
    20. Li, Tao & Rong, Lili & Zhang, Anming, 2021. "Assessing regional risk of COVID-19 infection from Wuhan via high-speed rail," Transport Policy, Elsevier, vol. 106(C), pages 226-238.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:trapol:v:162:y:2025:i:c:p:31-46. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/30473/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.