IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v202y2020ics095183202030497x.html
   My bibliography  Save this article

Jointly optimizing lot sizing and maintenance policy for a production system with two failure modes

Author

Listed:
  • Gao, Kaiye
  • Peng, Rui
  • Qu, Li
  • Wu, Shaomin

Abstract

In the reliability literature, studies that jointly investigate maintenance and production are typically restricted to one failure mode and fail to address the case where multiple failure modes may exist. This study investigates the problem of joint optimization of lot sizing and maintenance policy for a multi-product production system subject to two failure modes. The failure of the first mode is a soft failure that occurs after defects arrive. The failure of the second mode is a hard failure that occurs without any early warning signals. Products are sequentially produced by the system and a complete run of all products forms a production cycle. The system needs to be re-set up before producing a different product. Both the production cycle and the time of set-up depend on the lot sizes of products. Models are proposed for two maintenance policies: 1) arranging the maintenance during the set-up at the end of each production cycle; 2) arranging the maintenance during each of set-ups. The expected profit per unit time is formulated to obtain the optimal lot sizing and maintenance policy. Some properties of the proposed models are provided and they show that the optimal lot sizing and maintenance policy can be obtained under certain conditions. Case studies and sensitivity analyses are presented to illustrate the proposed models of two maintenance policies. The results show that the manufacturer will gain the most profit if the optimal lot sizing and maintenance policy are adopted. The results of comparing both maintenance policies reveal that the excessive maintenance is not cost-effective. The sensitivity analyses illustrate that reducing the cost due to failures and improving system reliability are effective ways to increase the expected profit per time unit.

Suggested Citation

  • Gao, Kaiye & Peng, Rui & Qu, Li & Wu, Shaomin, 2020. "Jointly optimizing lot sizing and maintenance policy for a production system with two failure modes," Reliability Engineering and System Safety, Elsevier, vol. 202(C).
  • Handle: RePEc:eee:reensy:v:202:y:2020:i:c:s095183202030497x
    DOI: 10.1016/j.ress.2020.106996
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S095183202030497X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2020.106996?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Wang, Huiying & Wang, Wenbin & Peng, Rui, 2017. "A two-phase inspection model for a single component system with three-stage degradation," Reliability Engineering and System Safety, Elsevier, vol. 158(C), pages 31-40.
    2. Kilic, Onur A. & Tunc, Huseyin, 2019. "Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs," European Journal of Operational Research, Elsevier, vol. 276(3), pages 880-892.
    3. Liu, Xuejuan & Wang, Wenbin & Peng, Rui, 2015. "An integrated production, inventory and preventive maintenance model for a multi-product production system," Reliability Engineering and System Safety, Elsevier, vol. 137(C), pages 76-86.
    4. Yang, Li & Zhao, Yu & Peng, Rui & Ma, Xiaobing, 2018. "Hybrid preventive maintenance of competing failures under random environment," Reliability Engineering and System Safety, Elsevier, vol. 174(C), pages 130-140.
    5. Peng, Rui & Liu, Bin & Zhai, Qingqing & Wang, Wenbin, 2019. "Optimal maintenance strategy for systems with two failure modes," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 624-632.
    6. Ou, Jinwen & Feng, Jiejian, 2019. "Production lot-sizing with dynamic capacity adjustment," European Journal of Operational Research, Elsevier, vol. 272(1), pages 261-269.
    7. Zhou, Xiaojun & Yu, Mengqi, 2020. "Semi-dynamic maintenance scheduling for multi-station series systems in multi-specification and small-batch production," Reliability Engineering and System Safety, Elsevier, vol. 195(C).
    8. Wang, Wenbin, 2012. "An overview of the recent advances in delay-time-based maintenance modelling," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 165-178.
    9. Cheng, Guo Qing & Zhou, Bing Hai & Li, Ling, 2018. "Integrated production, quality control and condition-based maintenance for imperfect production systems," Reliability Engineering and System Safety, Elsevier, vol. 175(C), pages 251-264.
    10. Cha, Ji Hwan & Finkelstein, Maxim & Levitin, Gregory, 2018. "Bivariate preventive maintenance of systems with lifetimes dependent on a random shock process," European Journal of Operational Research, Elsevier, vol. 266(1), pages 122-134.
    11. Hao Peng & Qianmei Feng & David Coit, 2010. "Reliability and maintenance modeling for systems subject to multiple dependent competing failure processes," IISE Transactions, Taylor & Francis Journals, vol. 43(1), pages 12-22.
    12. Lamas, Alejandro & Chevalier, Philippe, 2018. "Joint dynamic pricing and lot-sizing under competition," European Journal of Operational Research, Elsevier, vol. 266(3), pages 864-876.
    13. Nguyen, Ho Si Hung & Do, Phuc & Vu, Hai-Canh & Iung, Benoit, 2019. "Dynamic maintenance grouping and routing for geographically dispersed production systems," Reliability Engineering and System Safety, Elsevier, vol. 185(C), pages 392-404.
    14. Cha, Ji Hwan & Finkelstein, Maxim & Levitin, Gregory, 2017. "On preventive maintenance of systems with lifetimes dependent on a random shock process," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 90-97.
    15. Taş, Duygu & Gendreau, Michel & Jabali, Ola & Jans, Raf, 2019. "A capacitated lot sizing problem with stochastic setup times and overtime," European Journal of Operational Research, Elsevier, vol. 273(1), pages 146-159.
    16. Yang, Li & Ye, Zhi-sheng & Lee, Chi-Guhn & Yang, Su-fen & Peng, Rui, 2019. "A two-phase preventive maintenance policy considering imperfect repair and postponed replacement," European Journal of Operational Research, Elsevier, vol. 274(3), pages 966-977.
    17. Zhou, Yifan & Guo, Yiming & Lin, Tian Ran & Ma, Lin, 2018. "Maintenance optimisation of a series production system with intermediate buffers using a multi-agent FMDP," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 39-48.
    18. Fei Zhao & Wenbin Wang & Rui Peng, 2015. "Delay-time-based preventive maintenance modelling for a production plant: a case study in a steel mill," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(12), pages 2015-2024, December.
    19. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wang, Jiantai & Longyan, Tan & Ma, Xiaobing & Gao, Kaiye & Jia, Heping & Yang, Li, 2023. "Prognosis-driven reliability analysis and replacement policy optimization for two-phase continuous degradation," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
    2. Kaiye Gao & Tianshi Wang & Chenjing Han & Jinhao Xie & Ye Ma & Rui Peng, 2021. "A Review of Optimization of Microgrid Operation," Energies, MDPI, vol. 14(10), pages 1-39, May.
    3. Wu, Shaomin & Wu, Di & Peng, Rui, 2023. "Considering greenhouse gas emissions in maintenance optimisation," European Journal of Operational Research, Elsevier, vol. 307(3), pages 1135-1145.
    4. Azimpoor, Samareh & Taghipour, Sharareh & Farmanesh, Babak & Sharifi, Mani, 2022. "Joint Planning of Production and Inspection of Parallel Machines with Two-phase of Failure," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
    5. Cheng, Yao & Wei, Yian & Liao, Haitao, 2022. "Optimal sampling-based sequential inspection and maintenance plans for a heterogeneous product with competing failure modes," Reliability Engineering and System Safety, Elsevier, vol. 218(PB).
    6. uit het Broek, Michiel A.J. & Teunter, Ruud H. & de Jonge, Bram & Veldman, Jasper, 2021. "Joint condition-based maintenance and condition-based production optimization," Reliability Engineering and System Safety, Elsevier, vol. 214(C).
    7. Zhang, Chao & Chen, Rentong & Wang, Shaoping & Dui, Hongyan & Zhang, Yadong, 2022. "Resilience efficiency importance measure for the selection of a component maintenance strategy to improve system performance recovery," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
    8. Sinisterra, Wilfrido Quiñones & Lima, Victor Hugo Resende & Cavalcante, Cristiano Alexandre Virginio & Aribisala, Adetoye Ayokunle, 2023. "A delay-time model to integrate the sequence of resumable jobs, inspection policy, and quality for a single-component system," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
    9. Ke Chen & Xian Zhao & Qingan Qiu, 2022. "Optimal Task Abort and Maintenance Policies Considering Time Redundancy," Mathematics, MDPI, vol. 10(9), pages 1-16, April.
    10. Bingyin Lei & Yue Ren & Huiyu Luan & Ruonan Dong & Xiuyuan Wang & Junli Liao & Shu Fang & Kaiye Gao, 2023. "A Review of Optimization for System Reliability of Microgrid," Mathematics, MDPI, vol. 11(4), pages 1-30, February.
    11. Mingsan Ouyang & Peicheng Shen, 2022. "Prediction of Remaining Useful Life of Lithium Batteries Based on WOA-VMD and LSTM," Energies, MDPI, vol. 15(23), pages 1-20, November.
    12. Zhang, Nan & Cai, Kaiquan & Deng, Yingjun & Zhang, Jun, 2024. "Joint optimization of condition-based maintenance and condition-based production of a single equipment considering random yield and maintenance delay," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    13. Bingyin Lei & Yue Ren & Ziyang Wang & Xinquan Ge & Xiaolin Li & Kaiye Gao, 2023. "The Optimization of Working Time for a Consecutively Connected Production Line," Mathematics, MDPI, vol. 11(2), pages 1-12, January.
    14. Mingjuan Sun & Qinglai Dong & Zihan Gao, 2022. "An Imperfect Repair Model with Delayed Repair under Replacement and Repair Thresholds," Mathematics, MDPI, vol. 10(13), pages 1-15, June.
    15. Kim, Seokgoo & Choi, Joo-Ho & Kim, Nam Ho, 2022. "Inspection schedule for prognostics with uncertainty management," Reliability Engineering and System Safety, Elsevier, vol. 222(C).
    16. Shang, Lijun & Liu, Baoliang & Qiu, Qingan & Yang, Li & Du, Yongjun, 2023. "Designing warranty and maintenance policies for products subject to random working cycles," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
    17. Kaiye Gao & Hui Xiao & Li Qu & Shouyang Wang, 2022. "Optimal interception strategy of air defence missile system considering multiple targets and phases," Journal of Risk and Reliability, , vol. 236(1), pages 138-147, February.
    18. Wang, Jingjing & Zheng, Rui & Lin, Tianran, 2022. "Maintenance modeling for balanced systems subject to two competing failure modes," Reliability Engineering and System Safety, Elsevier, vol. 225(C).
    19. Ágota Bányai, 2021. "Energy Consumption-Based Maintenance Policy Optimization," Energies, MDPI, vol. 14(18), pages 1-33, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. de Jonge, Bram & Scarf, Philip A., 2020. "A review on maintenance optimization," European Journal of Operational Research, Elsevier, vol. 285(3), pages 805-824.
    2. Zhang, Fengxia & Shen, Jingyuan & Liao, Haitao & Ma, Yizhong, 2021. "Optimal preventive maintenance policy for a system subject to two-phase imperfect inspections," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
    3. Wang, Jiantai & Longyan, Tan & Ma, Xiaobing & Gao, Kaiye & Jia, Heping & Yang, Li, 2023. "Prognosis-driven reliability analysis and replacement policy optimization for two-phase continuous degradation," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
    4. Yang, Li & Ye, Zhi-sheng & Lee, Chi-Guhn & Yang, Su-fen & Peng, Rui, 2019. "A two-phase preventive maintenance policy considering imperfect repair and postponed replacement," European Journal of Operational Research, Elsevier, vol. 274(3), pages 966-977.
    5. Qiu, Qingan & Cui, Lirong, 2019. "Optimal mission abort policy for systems subject to random shocks based on virtual age process," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 11-20.
    6. Peng, Rui & He, Xiaofeng & Zhong, Chao & Kou, Gang & Xiao, Hui, 2022. "Preventive maintenance for heterogeneous parallel systems with two failure modes," Reliability Engineering and System Safety, Elsevier, vol. 220(C).
    7. Wu, Shengna & Yang, Jun & Peng, Rui & Zhai, Qingqing, 2021. "Optimal design of facility allocation and maintenance strategy for a cellular network," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
    8. Akcay, Alp, 2022. "An alert-assisted inspection policy for a production process with imperfect condition signals," European Journal of Operational Research, Elsevier, vol. 298(2), pages 510-525.
    9. Yang, Li & Zhao, Yu & Peng, Rui & Ma, Xiaobing, 2018. "Hybrid preventive maintenance of competing failures under random environment," Reliability Engineering and System Safety, Elsevier, vol. 174(C), pages 130-140.
    10. Liu, Yao & Wang, Yashun & Fan, Zhengwei & Bai, Guanghan & Chen, Xun, 2021. "Reliability modeling and a statistical inference method of accelerated degradation testing with multiple stresses and dependent competing failure processes," Reliability Engineering and System Safety, Elsevier, vol. 213(C).
    11. Cheng, Yao & Wei, Yian & Liao, Haitao, 2022. "Optimal sampling-based sequential inspection and maintenance plans for a heterogeneous product with competing failure modes," Reliability Engineering and System Safety, Elsevier, vol. 218(PB).
    12. Qingan Qiu & Lirong Cui & Dejing Kong, 2019. "Availability and maintenance modeling for a two-component system with dependent failures over a finite time horizon," Journal of Risk and Reliability, , vol. 233(2), pages 200-210, April.
    13. Wang, Jiantai & Zhou, Shihan & Peng, Rui & Qiu, Qingan & Yang, Li, 2023. "An inspection-based replacement planning in consideration of state-driven imperfect inspections," Reliability Engineering and System Safety, Elsevier, vol. 232(C).
    14. Alberti, Alexandre R. & Cavalcante, Cristiano A.V., 2020. "A two-scale maintenance policy for protection systems subject to shocks when meeting demands," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    15. Zhang, Zihan & Yang, Li, 2020. "Postponed maintenance scheduling integrating state variation and environmental impact," Reliability Engineering and System Safety, Elsevier, vol. 202(C).
    16. Peng, Rui & Liu, Bin & Zhai, Qingqing & Wang, Wenbin, 2019. "Optimal maintenance strategy for systems with two failure modes," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 624-632.
    17. Ma, Xiaoyang & Liu, Bin & Yang, Li & Peng, Rui & Zhang, Xiaodong, 2020. "Reliability analysis and condition-based maintenance optimization for a warm standby cooling system," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
    18. Zhang, Fengxia & Shen, Jingyuan & Ma, Yizhong, 2020. "Optimal maintenance policy considering imperfect repairs and non-constant probabilities of inspection errors," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
    19. Che, Haiyang & Zeng, Shengkui & Guo, Jianbin & Wang, Yao, 2018. "Reliability modeling for dependent competing failure processes with mutually dependent degradation process and shock process," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 168-178.
    20. Sinisterra, Wilfrido Quiñones & Cavalcante, Cristiano Alexandre Virgínio, 2020. "An integrated model of production scheduling and inspection planning for resumable jobs," International Journal of Production Economics, Elsevier, vol. 227(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:202:y:2020:i:c:s095183202030497x. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.