IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v91y2004i3p201-214.html
   My bibliography  Save this article

Agile manufacturing systems in the automotive industry

Author

Listed:
  • Elkins, Debra A.
  • Huang, Ningjian
  • Alden, Jeffrey M.

Abstract

No abstract is available for this item.

Suggested Citation

  • Elkins, Debra A. & Huang, Ningjian & Alden, Jeffrey M., 2004. "Agile manufacturing systems in the automotive industry," International Journal of Production Economics, Elsevier, vol. 91(3), pages 201-214, October.
  • Handle: RePEc:eee:proeco:v:91:y:2004:i:3:p:201-214
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00291-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Giachetti, Ronald E. & Martinez, Luis D. & Saenz, Oscar A. & Chen, Chin-Sheng, 2003. "Analysis of the structural measures of flexibility and agility using a measurement theoretical framework," International Journal of Production Economics, Elsevier, vol. 86(1), pages 47-62, October.
    2. Charles H. Fine & Robert M. Freund, 1990. "Optimal Investment in Product-Flexible Manufacturing Capacity," Management Science, INFORMS, vol. 36(4), pages 449-466, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jain, Vineet & Raj, Tilak, 2016. "Modeling and analysis of FMS performance variables by ISM, SEM and GTMA approach," International Journal of Production Economics, Elsevier, vol. 171(P1), pages 84-96.
    2. Laurent Lim, Lâm & Alpan, Gülgün & Penz, Bernard, 2014. "Reconciling sales and operations management with distant suppliers in the automotive industry: A simulation approach," International Journal of Production Economics, Elsevier, vol. 151(C), pages 20-36.
    3. Cotterman, Turner & Fuchs, Erica R.H. & Whitefoot, Kate S. & Combemale, Christophe, 2024. "The transition to electrified vehicles: Evaluating the labor demand of manufacturing conventional versus battery electric vehicle powertrains," Energy Policy, Elsevier, vol. 188(C).
    4. Gullelala Jadoon & Ikram Ud Din & Ahmad Almogren & Hisham Almajed, 2020. "Smart and Agile Manufacturing Framework, A Case Study for Automotive Industry," Energies, MDPI, vol. 13(21), pages 1-13, November.
    5. Shan, Siqing & Wang, Li & Xin, Tenglong & Bi, Zhuming, 2013. "Developing a rapid response production system for aircraft manufacturing," International Journal of Production Economics, Elsevier, vol. 146(1), pages 37-47.
    6. Chris Turner & John Oyekan, 2023. "Manufacturing in the Age of Human-Centric and Sustainable Industry 5.0: Application to Holonic, Flexible, Reconfigurable and Smart Manufacturing Systems," Sustainability, MDPI, vol. 15(13), pages 1-29, June.
    7. Feng Xiang & Yefa Hu & Yingrong Yu & Huachun Wu, 2014. "QoS and energy consumption aware service composition and optimal-selection based on Pareto group leader algorithm in cloud manufacturing system," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 22(4), pages 663-685, December.
    8. Juan Carlos Barcena-Ruiz & Norma Olaizola, 2007. "Cost-saving production technologies and partial ownership," Economics Bulletin, AccessEcon, vol. 15(6), pages 1-8.
    9. Bárcena-Ruiz, Juan Carlos & Olaizola, Norma, 2008. "Choice of flexible production technologies under strategic delegation," Japan and the World Economy, Elsevier, vol. 20(3), pages 395-414, August.
    10. Fritz, Melanie & Hausen, Tobias, 2009. "Electronic supply network coordination in agrifood networks: Barriers, potentials, and path dependencies," International Journal of Production Economics, Elsevier, vol. 121(2), pages 441-453, October.
    11. Giacosa, Elisa & Culasso, Francesca & Crocco, Edoardo, 2022. "Customer agility in the modern automotive sector: how lead management shapes agile digital companies," Technological Forecasting and Social Change, Elsevier, vol. 175(C).
    12. Maryam Pervez Khan & Noraini Abu Talib & Tan Owee Kowang, 2018. "Development of Sustainability Framework Based On the Theory of Resource Based View," International Journal of Academic Research in Business and Social Sciences, Human Resource Management Academic Research Society, International Journal of Academic Research in Business and Social Sciences, vol. 8(7), pages 636-647, July.
    13. Chuang, Chia-Hung & Chiang, Chung-Yean, 2016. "Dynamic and stochastic behavior of coefficient of demand uncertainty incorporated with EOQ variables: An application in finished-goods inventory from General Motors׳ dealerships," International Journal of Production Economics, Elsevier, vol. 172(C), pages 95-109.
    14. Azevedo, Susana G. & Govindan, Kannan & Carvalho, Helena & Cruz-Machado, V., 2012. "An integrated model to assess the leanness and agility of the automotive industry," Resources, Conservation & Recycling, Elsevier, vol. 66(C), pages 85-94.
    15. Yongbo Li & Ali Diabat & Chung-Cheng Lu, 2020. "Leagile supplier selection in Chinese textile industries: a DEMATEL approach," Annals of Operations Research, Springer, vol. 287(1), pages 303-322, April.
    16. Chahal, Hardeep & Gupta, Mahesh & Bhan, Namrita & Cheng, T.C.E., 2020. "Operations management research grounded in the resource-based view: A meta-analysis," International Journal of Production Economics, Elsevier, vol. 230(C).
    17. Sagi Akron & Roy Gelbard, 2020. "Software code flexibility profitability in light of technology life cycle," Operational Research, Springer, vol. 20(2), pages 723-746, June.
    18. Benjamin James Ralph & Marcel Sorger & Karin Hartl & Andreas Schwarz-Gsaxner & Florian Messner & Martin Stockinger, 2022. "Transformation of a rolling mill aggregate to a cyber physical production system: from sensor retrofitting to machine learning," Journal of Intelligent Manufacturing, Springer, vol. 33(2), pages 493-518, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Brian Tomlin & Yimin Wang, 2005. "On the Value of Mix Flexibility and Dual Sourcing in Unreliable Newsvendor Networks," Manufacturing & Service Operations Management, INFORMS, vol. 7(1), pages 37-57, June.
    2. Jiri Chod & Nils Rudi, 2005. "Resource Flexibility with Responsive Pricing," Operations Research, INFORMS, vol. 53(3), pages 532-548, June.
    3. Emmett J. Lodree & Nezih Altay & Robert A. Cook, 2019. "Staff assignment policies for a mass casualty event queuing network," Annals of Operations Research, Springer, vol. 283(1), pages 411-442, December.
    4. Said Boukendour & Rahim Bah, 2001. "The guaranteed maximum price contract as call option," Construction Management and Economics, Taylor & Francis Journals, vol. 19(6), pages 563-567.
    5. Weaver, Robert D. & Curtiss, Jarmila & Brümmer, Bernhard, 2005. "Technical Efficiency Effects of Technological Change: Another Perspective on GM Crops," 2005 International Congress, August 23-27, 2005, Copenhagen, Denmark 24528, European Association of Agricultural Economists.
    6. Hongmin Li & Stephen C. Graves & Woonghee Tim Huh, 2014. "Optimal Capacity Conversion for Product Transitions Under High Service Requirements," Manufacturing & Service Operations Management, INFORMS, vol. 16(1), pages 46-60, February.
    7. Suárez, Freddy F. & Cusumano, Michael A., 1954- & Fine, Charles H., 1991. "Flexibility and performance : a literature critique and strategic framework," Working papers 3298-91., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    8. Kai Huang & Shabbir Ahmed, 2009. "The Value of Multistage Stochastic Programming in Capacity Planning Under Uncertainty," Operations Research, INFORMS, vol. 57(4), pages 893-904, August.
    9. Rameshwar Dubey & Tripti Singh & Omprakash K. Gupta, 2015. "Impact of Agility, Adaptability and Alignment on Humanitarian Logistics Performance: Mediating Effect of Leadership," Global Business Review, International Management Institute, vol. 16(5), pages 812-831, October.
    10. Anantaram Balakrishnan & Joseph Geunes, 2000. "Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning," Manufacturing & Service Operations Management, INFORMS, vol. 2(2), pages 166-185, January.
    11. Elena Katok & William Tarantino & Terry P. Harrison, 2003. "Investment in production resource flexibility: An empirical investigation of methods for planning under uncertainty," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(2), pages 105-129, March.
    12. Lim, Seung-Kil & Kim, Yeong-Dae, 1998. "Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions," European Journal of Operational Research, Elsevier, vol. 104(1), pages 175-186, January.
    13. Dowlatshahi, Shad & Cao, Qing, 2006. "The relationships among virtual enterprise, information technology, and business performance in agile manufacturing: An industry perspective," European Journal of Operational Research, Elsevier, vol. 174(2), pages 835-860, October.
    14. Transchel, Sandra, 2017. "Inventory management under price-based and stockout-based substitution," European Journal of Operational Research, Elsevier, vol. 262(3), pages 996-1008.
    15. Anna-Theresa Walter, 2021. "Organizational agility: ill-defined and somewhat confusing? A systematic literature review and conceptualization," Management Review Quarterly, Springer, vol. 71(2), pages 343-391, April.
    16. Jörn Grahl & Michael Schneider & David Francas, 2010. "A Problem-Specific and Effective Metaheuristic for Flexibility Design," Working Papers 1001, Gutenberg School of Management and Economics, Johannes Gutenberg-Universität Mainz, revised 28 Jan 2010.
    17. Robert A. Shumsky & Fuqiang Zhang, 2009. "Dynamic Capacity Management with Substitution," Operations Research, INFORMS, vol. 57(3), pages 671-684, June.
    18. Fehmi Tanrısever & S. Sinan Erzurumlu & Nitin Joglekar, 2012. "Production, Process Investment, and the Survival of Debt‐Financed Startup Firms," Production and Operations Management, Production and Operations Management Society, vol. 21(4), pages 637-652, July.
    19. Mojtaba Farrokh & Ehsan Ahmadi & Minghe Sun, 2023. "A robust stochastic possibilistic programming model for dynamic supply chain network design with pricing and technology selection decisions," OPSEARCH, Springer;Operational Research Society of India, vol. 60(3), pages 1082-1120, September.
    20. Murphy, Daniel, 2017. "Excess capacity in a fixed-cost economy," European Economic Review, Elsevier, vol. 91(C), pages 245-260.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:91:y:2004:i:3:p:201-214. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.