IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v81-82y2003i1p95-102.html
   My bibliography  Save this article

Agility and mixed-model furniture production

Author

Listed:
  • Yao, Andrew C.
  • Carlson, John G. H.

Abstract

No abstract is available for this item.

Suggested Citation

  • Yao, Andrew C. & Carlson, John G. H., 2003. "Agility and mixed-model furniture production," International Journal of Production Economics, Elsevier, vol. 81(1), pages 95-102, January.
  • Handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:95-102
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(02)00359-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sianesi, Andrea, 1998. "An analysis of the impact of plant and management variables in a multi-stage, mixed-model production system," International Journal of Production Economics, Elsevier, vol. 56(1), pages 575-585, September.
    2. Wieslaw Kubiak & Suresh Sethi, 1991. "A Note on "Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems"," Management Science, INFORMS, vol. 37(1), pages 121-122, January.
    3. Bayo-Moriones, Alberto & Merino-Diaz de Cerio, Javier, 2001. "Quality management and high performance work practices: Do they coexist?," International Journal of Production Economics, Elsevier, vol. 73(3), pages 251-259, October.
    4. Katayama, Hiroshi & Bennett, David, 1999. "Agility, adaptability and leanness: A comparison of concepts and a study of practice," International Journal of Production Economics, Elsevier, vol. 60(1), pages 43-51, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bottani, Eleonora, 2010. "Profile and enablers of agile companies: An empirical investigation," International Journal of Production Economics, Elsevier, vol. 125(2), pages 251-261, June.
    2. Hüttmeir, Andreas & de Treville, Suzanne & van Ackere, Ann & Monnier, Léonard & Prenninger, Johann, 2009. "Trading off between heijunka and just-in-sequence," International Journal of Production Economics, Elsevier, vol. 118(2), pages 501-507, April.
    3. Arnold Kamis & Tziporah Stern & Daniel M. Ladik, 2010. "A flow-based model of web site intentions when users customize products in business-to-consumer electronic commerce," Information Systems Frontiers, Springer, vol. 12(2), pages 157-168, April.
    4. Anna-Theresa Walter, 2021. "Organizational agility: ill-defined and somewhat confusing? A systematic literature review and conceptualization," Management Review Quarterly, Springer, vol. 71(2), pages 343-391, April.
    5. Fogliatto, Flavio S. & da Silveira, Giovani J.C. & Borenstein, Denis, 2012. "The mass customization decade: An updated review of the literature," International Journal of Production Economics, Elsevier, vol. 138(1), pages 14-25.
    6. Holmström, Jan & Främling, Kary & Ala-Risku, Timo, 2010. "The uses of tracking in operations management: Synthesis of a research program," International Journal of Production Economics, Elsevier, vol. 126(2), pages 267-275, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Carlson, John G.H. & Yao, Andrew C., 2008. "Simulating an agile, synchronized manufacturing system," International Journal of Production Economics, Elsevier, vol. 112(2), pages 714-722, April.
    2. Sujan Piya & Ahm Shamsuzzoha & Mohammad Khadem & Nasr Al-Hinai, 2020. "Identification of Critical Factors and Their Interrelationships to Design Agile Supply Chain: Special Focus to Oil and Gas Industries," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 21(3), pages 263-281, September.
    3. Bayo-Moriones, Alberto & Merino-Díaz-de-Cerio, Javier & Antonio Escamilla-de-León, Sergio & Mary Selvam, Rejina, 2011. "The impact of ISO 9000 and EFQM on the use of flexible work practices," International Journal of Production Economics, Elsevier, vol. 130(1), pages 33-42, March.
    4. N. Brauner & Y. Crama & A. Grigoriev & J. Klundert, 2005. "A Framework for the Complexity of High-Multiplicity Scheduling Problems," Journal of Combinatorial Optimization, Springer, vol. 9(3), pages 313-323, May.
    5. Giard, Vincent & Jeunet, Jully, 2010. "Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line," International Journal of Production Economics, Elsevier, vol. 123(2), pages 290-300, February.
    6. Leonel Prieto & Md Farid Talukder, 2023. "Resilient Agility: A Necessary Condition for Employee and Organizational Sustainability," Sustainability, MDPI, vol. 15(2), pages 1-24, January.
    7. Yavuz, Mesut & Tufekci, Suleyman, 2006. "A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems," International Journal of Production Economics, Elsevier, vol. 103(2), pages 841-862, October.
    8. Bollapragada, Srinivas & Bussieck, Michael & Mallik, Suman, 2002. "Scheduling Commercial Videotapes in Broadcast Television," Working Papers 02-0127, University of Illinois at Urbana-Champaign, College of Business.
    9. Chun-Pin Tseng & Cheng-Wu Chen, 2012. "Natural disaster management mechanisms for probabilistic earthquake loss," Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards, Springer;International Society for the Prevention and Mitigation of Natural Hazards, vol. 60(3), pages 1055-1063, February.
    10. Vimlan Moonsamy & Shalini Singh, 2014. "Using factor analysis to explore principal components for quality management implementation," Quality & Quantity: International Journal of Methodology, Springer, vol. 48(2), pages 605-622, March.
    11. Sourd, Francis, 2005. "Punctuality and idleness in just-in-time scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 739-751, December.
    12. Anna-Theresa Walter, 2021. "Organizational agility: ill-defined and somewhat confusing? A systematic literature review and conceptualization," Management Review Quarterly, Springer, vol. 71(2), pages 343-391, April.
    13. Drexl, Andreas & Jordan, Carsten, 1994. "Materialflußorientierte Produktionssteuerung bei Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 362, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    14. Olexandr Yemelyanov & Anastasiya Symak & Tetyana Petrushka & Roman Lesyk & Lilia Lesyk, 2018. "Evaluation of the Adaptability of the Ukrainian Economy to Changes in Prices for Energy Carriers and to Energy Market Risks," Energies, MDPI, vol. 11(12), pages 1-34, December.
    15. Boysen, Nils & Scholl, Armin & Wopperer, Nico, 2012. "Resequencing of mixed-model assembly lines: Survey and research agenda," European Journal of Operational Research, Elsevier, vol. 216(3), pages 594-604.
    16. Wieslaw Kubiak & Mesut Yavuz, 2008. "Just-in-Time Smoothing Through Batching," Manufacturing & Service Operations Management, INFORMS, vol. 10(3), pages 506-518, June.
    17. Andreas Drexl & Alf Kimms, 2001. "Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints," Management Science, INFORMS, vol. 47(3), pages 480-491, March.
    18. Hubert Elisé Fotso, 2022. "Die Leistungsfähigkeit agiler KMU auf dem Prüfstand der Ungewissheit: Sondierungsstudie in einem Dienstleistungs-KMU [The performance of agile SMEs put to the test of uncertainty: Exploratory study," Working Papers hal-03721715, HAL.
    19. Sianesi, Andrea, 1998. "An analysis of the impact of plant and management variables in a multi-stage, mixed-model production system," International Journal of Production Economics, Elsevier, vol. 56(1), pages 575-585, September.
    20. Korkmazel, Tugrul & Meral, Sedef, 2001. "Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems," European Journal of Operational Research, Elsevier, vol. 131(1), pages 188-207, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:95-102. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.