IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v56-57y1998i1p699-709.html
   My bibliography  Save this article

Customer-order-driven production: An economical concept for responding to demand uncertainty?

Author

Listed:
  • Zapfel, Gunther

Abstract

No abstract is available for this item.

Suggested Citation

  • Zapfel, Gunther, 1998. "Customer-order-driven production: An economical concept for responding to demand uncertainty?," International Journal of Production Economics, Elsevier, vol. 56(1), pages 699-709, September.
  • Handle: RePEc:eee:proeco:v:56-57:y:1998:i:1:p:699-709
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(97)00080-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Murakoshi, Toshihiro, 1994. "Customer-driven manufacturing in Japan," International Journal of Production Economics, Elsevier, vol. 37(1), pages 63-72, November.
    2. G. J. Miltenburg & J. Wijngaard, 1994. "The U-line Line Balancing Problem," Management Science, INFORMS, vol. 40(10), pages 1378-1388, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tordecilla-Madera, Rafael & Polo, Andrés & Muñoz, Dairo & González-Rodríguez, Leonardo, 2017. "A robust design for a Colombian dairy cooperative's milk storage and refrigeration logistics system using binary programming," International Journal of Production Economics, Elsevier, vol. 183(PC), pages 710-720.
    2. Altendorfer, Klaus & Jodlbauer, Herbert, 2011. "Which utilization and service level lead to the maximum EVA?," International Journal of Production Economics, Elsevier, vol. 130(1), pages 16-26, March.
    3. Moattar Husseini, S.M. & O'Brien, C. & Hosseini, S.T., 2006. "A method to enhance volume flexibility in JIT production control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 653-665, December.
    4. Vlajic, Jelena V. & van der Vorst, Jack G.A.J. & Haijema, René, 2012. "A framework for designing robust food supply chains," International Journal of Production Economics, Elsevier, vol. 137(1), pages 176-189.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Becker, Christian & Scholl, Armin, 2006. "A survey on problems and methods in generalized assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
    2. Nakade, Koichi & Ohno, Katsuhisa, 2003. "Separate and carousel type allocations of workers in a U-shaped production line," European Journal of Operational Research, Elsevier, vol. 145(2), pages 403-424, March.
    3. Hong, Paul & Jagani, Sandeep & Kim, Jinhwan & Youn, Sun Hee, 2019. "Managing sustainability orientation: An empirical investigation of manufacturing firms," International Journal of Production Economics, Elsevier, vol. 211(C), pages 71-81.
    4. Chiang, Wen-Chyuan & Kouvelis, Panagiotis & Urban, Timothy L., 2006. "Single- and multi-objective facility layout with workflow interference considerations," European Journal of Operational Research, Elsevier, vol. 174(3), pages 1414-1426, November.
    5. Kara, Yakup & Paksoy, Turan & Chang, Ching-Ter, 2009. "Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing," European Journal of Operational Research, Elsevier, vol. 195(2), pages 335-347, June.
    6. Boysen, Nils & Fliedner, Malte, 2008. "A versatile algorithm for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 184(1), pages 39-56, January.
    7. Miltenburg, John, 1998. "Balancing U-lines in a multiple U-line facility," European Journal of Operational Research, Elsevier, vol. 109(1), pages 1-23, August.
    8. Gokcen, Hadi & Ag[caron]pak, Kursad, 2006. "A goal programming approach to simple U-line balancing problem," European Journal of Operational Research, Elsevier, vol. 171(2), pages 577-585, June.
    9. Miltenburg, John, 2001. "U-shaped production lines: A review of theory and practice," International Journal of Production Economics, Elsevier, vol. 70(3), pages 201-214, April.
    10. Bautista, Joaquín & Pereira, Jordi, 2011. "Procedures for the Time and Space constrained Assembly Line Balancing Problem," European Journal of Operational Research, Elsevier, vol. 212(3), pages 473-481, August.
    11. Koichi Nakade, 2017. "Effect of worker sequence on cycle time in a U-shaped line with chase mode," International Journal of Production Research, Taylor & Francis Journals, vol. 55(10), pages 2752-2763, May.
    12. M. H. Alavidoost & M. H. Fazel Zarandi & Mosahar Tarimoradi & Yaser Nemati, 2017. "Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 313-336, February.
    13. Suresh Chand & Ting Zeng, 2001. "A Comparison of U-Line and Straight-Line Performances Under Stochastic Task Times," Manufacturing & Service Operations Management, INFORMS, vol. 3(2), pages 138-150, January.
    14. Ibrahim Kucukkoc & David Z. Zhang, 2017. "Balancing of mixed-model parallel U-shaped assembly lines considering model sequences," International Journal of Production Research, Taylor & Francis Journals, vol. 55(20), pages 5958-5975, October.
    15. Bukchin, Yossi & Raviv, Tal, 2018. "Constraint programming for solving various assembly line balancing problems," Omega, Elsevier, vol. 78(C), pages 57-68.
    16. Gokcen, Hadi & Agpak, Kursad & Benzer, Recep, 2006. "Balancing of parallel assembly lines," International Journal of Production Economics, Elsevier, vol. 103(2), pages 600-609, October.
    17. Scholl, Armin & Boysen, Nils, 2009. "Designing parallel assembly lines with split workplaces: Model and optimization procedure," International Journal of Production Economics, Elsevier, vol. 119(1), pages 90-100, May.
    18. Aase, Gerald R. & Olson, John R. & Schniederjans, Marc J., 2004. "U-shaped assembly line layouts and their impact on labor productivity: An experimental study," European Journal of Operational Research, Elsevier, vol. 156(3), pages 698-711, August.
    19. Sprecher, Arno, 2000. "SALBLIB: Challenging instances for assembly line balancing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 526, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    20. Yuling Jiao & Nan Cao & Jin Li & Lin Li & Xue Deng, 2022. "Balancing a U-Shaped Assembly Line with a Heuristic Algorithm Based on a Comprehensive Rank Value," Sustainability, MDPI, vol. 14(2), pages 1-13, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:56-57:y:1998:i:1:p:699-709. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.