End-of-life inventory management problem: Results and insights
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2021.108313
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Çerağ Pinçe & J. B. G. Frenk & Rommert Dekker, 2015. "The Role of Contract Expirations in Service Parts Management," Production and Operations Management, Production and Operations Management Society, vol. 24(10), pages 1580-1597, October.
- Teunter, Ruud H. & Fortuin, Leonard, 1999. "End-of-life service," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 487-497, March.
- Nicholas W. Leifker & Philip C. Jones & Timothy J. Lowe, 2014. "Determining Optimal Order Amount for End-of-Life Parts Acquisition with Possibility of Contract Extension," The Engineering Economist, Taylor & Francis Journals, vol. 59(4), pages 259-281, October.
- J. B. G. Frenk & Sonya Javadi & Semih O. Sezer, 2019. "An optimal stopping approach for the end-of-life inventory problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 329-363, December.
- J P J van Kooten & T Tan, 2009. "The final order problem for repairable spare parts under condemnation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(10), pages 1449-1461, October.
- Jack, Nat & Van der Duyn Schouten, Frank, 2000. "Optimal repair-replace strategies for a warranted product," International Journal of Production Economics, Elsevier, vol. 67(1), pages 95-100, August.
- Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase," European Journal of Operational Research, Elsevier, vol. 137(3), pages 497-511, March.
- M. Pourakbar & E. Laan & R. Dekker, 2014.
"End-of-Life Inventory Problem with Phaseout Returns,"
Production and Operations Management, Production and Operations Management Society, vol. 23(9), pages 1561-1576, September.
- Pourakbar, M. & van der Laan, E.A. & Dekker, R., 2011. "End-of-Life Inventory Problem with Phase-out Returns," Econometric Institute Research Papers EI 2011-12, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Pourakbar, Morteza & Dekker, Rommert, 2012.
"Customer differentiated end-of-life inventory problem,"
European Journal of Operational Research, Elsevier, vol. 222(1), pages 44-53.
- Pourakbar, M. & Dekker, R., 2011. "Customer Differentiated End-of-Life Inventory Problem," Econometric Institute Research Papers EI 2011-21, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Behfard, S. & van der Heijden, M.C. & Al Hanbali, A. & Zijm, W.H.M., 2015. "Last time buy and repair decisions for spare parts," European Journal of Operational Research, Elsevier, vol. 244(2), pages 498-510.
- Pinçe, Çerag & Dekker, Rommert, 2011.
"An inventory model for slow moving items subject to obsolescence,"
European Journal of Operational Research, Elsevier, vol. 213(1), pages 83-95, August.
- Pinçe, C. & Dekker, R., 2009. "An Inventory Model for Slow Moving Items Subject to Obsolescence," ERIM Report Series Research in Management ERS-2009-053-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Shen, Yuelin & Willems, Sean P., 2014. "Modeling sourcing strategies to mitigate part obsolescence," European Journal of Operational Research, Elsevier, vol. 236(2), pages 522-533.
- Dirk Beyer & Feng Cheng & Suresh P. Sethi & Michael Taksar, 2010. "Markovian Demand Inventory Models," International Series in Operations Research and Management Science, Springer, number 978-0-387-71604-6, December.
- Shi, Zhenyang & Liu, Shaoxuan, 2020. "Optimal inventory control and design refresh selection in managing part obsolescence," European Journal of Operational Research, Elsevier, vol. 287(1), pages 133-144.
- Frenk, J.B.G. & Javadi, S. & Pourakbar, M. & Sezer, S.O., 2019. "An exact static solution approach for the service parts end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 272(2), pages 496-504.
- Karl Inderfurth & Kampan Mukherjee, 2008. "Decision support for spare parts acquisition in post product life cycle," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 16(1), pages 17-42, March.
- Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase: A central depot and repair kits," European Journal of Operational Research, Elsevier, vol. 138(1), pages 76-86, April.
- J. B. G. Frenk & Canan Pehlivan & Semih O. Sezer, 2019. "Order and exit decisions under non-increasing price curves for products with short life cycles," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 365-397, December.
- Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
- Cattani, Kyle D. & Souza, Gilvan C., 2003. "Good buy? Delaying end-of-life purchases," European Journal of Operational Research, Elsevier, vol. 146(1), pages 216-228, April.
- Israel David & Eitan Greenshtein & Avraham Mehrez, 1997. "A dynamic‐programming approach to continuous‐review obsolescent inventory problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(8), pages 757-774, December.
- van der Heijden, Matthieu & Iskandar, Bermawi P., 2013. "Last time buy decisions for products sold under warranty," European Journal of Operational Research, Elsevier, vol. 224(2), pages 302-312.
- Sechan Oh & Özalp Özer, 2016. "Characterizing the Structure of Optimal Stopping Policies," Production and Operations Management, Production and Operations Management Society, vol. 25(11), pages 1820-1838, November.
- Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.
- Nicholas Leifker & Philip Jones & Timothy Lowe, 2012. "A Continuous-Time Examination of End-of-Life Parts Acquisition With Limited Customer Information," The Engineering Economist, Taylor & Francis Journals, vol. 57(4), pages 284-301.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Van Foreest, Nicky D. & Kilic, Onur A., 2023. "An intuitive approach to inventory control with optimal stopping," European Journal of Operational Research, Elsevier, vol. 311(3), pages 921-924.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Shi, Zhenyang & Liu, Shaoxuan, 2020. "Optimal inventory control and design refresh selection in managing part obsolescence," European Journal of Operational Research, Elsevier, vol. 287(1), pages 133-144.
- Behfard, S. & van der Heijden, M.C. & Al Hanbali, A. & Zijm, W.H.M., 2015. "Last time buy and repair decisions for spare parts," European Journal of Operational Research, Elsevier, vol. 244(2), pages 498-510.
- Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.
- Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
- Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
- Pourakbar, Morteza & Dekker, Rommert, 2012.
"Customer differentiated end-of-life inventory problem,"
European Journal of Operational Research, Elsevier, vol. 222(1), pages 44-53.
- Pourakbar, M. & Dekker, R., 2011. "Customer Differentiated End-of-Life Inventory Problem," Econometric Institute Research Papers EI 2011-21, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Shen, Yuelin & Willems, Sean P., 2014. "Modeling sourcing strategies to mitigate part obsolescence," European Journal of Operational Research, Elsevier, vol. 236(2), pages 522-533.
- Frenk, J.B.G. & Javadi, S. & Pourakbar, M. & Sezer, S.O., 2019. "An exact static solution approach for the service parts end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 272(2), pages 496-504.
- J. B. G. Frenk & Sonya Javadi & Semih O. Sezer, 2019. "An optimal stopping approach for the end-of-life inventory problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 329-363, December.
- van Jaarsveld, Willem & Dekker, Rommert, 2011. "Estimating obsolescence risk from demand data to enhance inventory control--A case study," International Journal of Production Economics, Elsevier, vol. 133(1), pages 423-431, September.
- Pinçe, Çerag & Dekker, Rommert, 2011.
"An inventory model for slow moving items subject to obsolescence,"
European Journal of Operational Research, Elsevier, vol. 213(1), pages 83-95, August.
- Pinçe, C. & Dekker, R., 2009. "An Inventory Model for Slow Moving Items Subject to Obsolescence," ERIM Report Series Research in Management ERS-2009-053-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Christiane B. Haubitz & Ulrich W. Thonemann, 2021. "How to Change a Running System—Controlling the Transition to Optimized Spare Parts Inventory Policies," Production and Operations Management, Production and Operations Management Society, vol. 30(5), pages 1386-1405, May.
- Karl Inderfurth & Rainer Kleber, 2010. "An Advanced Heuristic for Multiple-Option Spare Parts Procurement after End-of-Production," FEMM Working Papers 100005, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
- van der Heijden, Matthieu & Iskandar, Bermawi P., 2013. "Last time buy decisions for products sold under warranty," European Journal of Operational Research, Elsevier, vol. 224(2), pages 302-312.
- Van Foreest, Nicky D. & Kilic, Onur A., 2023. "An intuitive approach to inventory control with optimal stopping," European Journal of Operational Research, Elsevier, vol. 311(3), pages 921-924.
- J. B. G. Frenk & Canan Pehlivan & Semih O. Sezer, 2019. "Order and exit decisions under non-increasing price curves for products with short life cycles," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 365-397, December.
- Krikke, H.R. & van der Laan, E., 2009.
"Last Time Buy and Control Policies With Phase-Out Returns : A Case Study in Plant Control Systems,"
Discussion Paper
2009-66, Tilburg University, Center for Economic Research.
- Krikke, H.R. & van der Laan, E., 2009. "Last Time Buy and Control Policies With Phase-Out Returns : A Case Study in Plant Control Systems," Other publications TiSEM c1a3c438-6d31-4147-afd7-8, Tilburg University, School of Economics and Management.
- Shuai Zhang & Kai Huang & Yufei Yuan, 2021. "Spare Parts Inventory Management: A Literature Review," Sustainability, MDPI, vol. 13(5), pages 1-23, February.
- Zaarour, Nizar & Melachrinoudis, Emanuel & Solomon, Marius M., 2016. "Maximizing revenue of end of life items in retail stores," European Journal of Operational Research, Elsevier, vol. 255(1), pages 133-141.
- Kim, T.Y. & Dekker, R. & Heij, C., 2016. "Spare part demand forecasting for consumer goods using installed base information," Econometric Institute Research Papers EI2016-11, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
More about this item
Keywords
Management of end-of-life problem; End-of-life inventory management; Optimal stopping with additional decisions; Non-homogeneous poisson process;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:243:y:2022:i:c:s0925527321002899. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.