IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v60y2009i10d10.1057_jors.2008.111.html
   My bibliography  Save this article

The final order problem for repairable spare parts under condemnation

Author

Listed:
  • J P J van Kooten

    (Technische Universiteit Eindhoven)

  • T Tan

    (Technische Universiteit Eindhoven)

Abstract

We consider a manufacturer of complex machines that offers service contracts to her customers, committing herself to repair failed spare parts throughout a fixed service period. The suppliers of spare parts often discontinue the production of some parts as technology advances and ask the manufacturer to place a final order. We address the problem of determining final orders for such spare parts. The parts that we consider are repairable, but they are subject to the risk of condemnation. We build a transient Markovian model to represent the problem for a repairable spare part with a certain repair probability and repair lead time and we present some approximations that allow for further real-life characteristics to be included. Furthermore, an approximate model that can be computed more efficiently is presented, and the sensitivity of the results obtained with respect to the problem parameters is discussed, helping us develop several managerial insights.

Suggested Citation

  • J P J van Kooten & T Tan, 2009. "The final order problem for repairable spare parts under condemnation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(10), pages 1449-1461, October.
  • Handle: RePEc:pal:jorsoc:v:60:y:2009:i:10:d:10.1057_jors.2008.111
    DOI: 10.1057/jors.2008.111
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/jors.2008.111
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/jors.2008.111?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hill, Roger M. & Omar, Mohd & Smith, David K., 1999. "Stock replenishment policies for a stochastic exponentially-declining demand process," European Journal of Operational Research, Elsevier, vol. 116(2), pages 374-388, July.
    2. Ritchie, E. & Wilcox, P., 1977. "Renewal theory forecasting for stock control," European Journal of Operational Research, Elsevier, vol. 1(2), pages 90-93, March.
    3. Teunter, Ruud H. & Fortuin, Leonard, 1998. "End-of-life service: A case study," European Journal of Operational Research, Elsevier, vol. 107(1), pages 19-34, May.
    4. Cattani, Kyle D. & Souza, Gilvan C., 2003. "Good buy? Delaying end-of-life purchases," European Journal of Operational Research, Elsevier, vol. 146(1), pages 216-228, April.
    5. John R. Moore, Jr., 1971. "Forecasting and Scheduling for Past-Model Replacement Parts," Management Science, INFORMS, vol. 18(4-Part-I), pages 200-213, December.
    6. Craig C. Sherbrooke, 1971. "An Evaluator for the Number of Operationally Ready Aircraft in a Multilevel Supply System," Operations Research, INFORMS, vol. 19(3), pages 618-635, June.
    7. Teunter, Ruud H. & Fortuin, Leonard, 1999. "End-of-life service," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 487-497, March.
    8. Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Karl Inderfurth & Rainer Kleber, 2010. "An Advanced Heuristic for Multiple-Option Spare Parts Procurement after End-of-Production," FEMM Working Papers 100005, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
    2. Behfard, S. & van der Heijden, M.C. & Al Hanbali, A. & Zijm, W.H.M., 2015. "Last time buy and repair decisions for spare parts," European Journal of Operational Research, Elsevier, vol. 244(2), pages 498-510.
    3. Pinçe, Çerag & Dekker, Rommert, 2011. "An inventory model for slow moving items subject to obsolescence," European Journal of Operational Research, Elsevier, vol. 213(1), pages 83-95, August.
    4. Shen, Yuelin & Willems, Sean P., 2014. "Modeling sourcing strategies to mitigate part obsolescence," European Journal of Operational Research, Elsevier, vol. 236(2), pages 522-533.
    5. M. Pourakbar & E. Laan & R. Dekker, 2014. "End-of-Life Inventory Problem with Phaseout Returns," Production and Operations Management, Production and Operations Management Society, vol. 23(9), pages 1561-1576, September.
    6. J. B. G. Frenk & Canan Pehlivan & Semih O. Sezer, 2019. "Order and exit decisions under non-increasing price curves for products with short life cycles," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 365-397, December.
    7. van Jaarsveld, Willem & Dekker, Rommert, 2011. "Estimating obsolescence risk from demand data to enhance inventory control--A case study," International Journal of Production Economics, Elsevier, vol. 133(1), pages 423-431, September.
    8. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    9. Ozyoruk, Emin & Erkip, Nesim Kohen & Ararat, Çağın, 2022. "End-of-life inventory management problem: Results and insights," International Journal of Production Economics, Elsevier, vol. 243(C).
    10. J. B. G. Frenk & Sonya Javadi & Semih O. Sezer, 2019. "An optimal stopping approach for the end-of-life inventory problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 329-363, December.
    11. Pourakbar, Morteza & Dekker, Rommert, 2012. "Customer differentiated end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 222(1), pages 44-53.
    12. Frenk, J.B.G. & Javadi, S. & Pourakbar, M. & Sezer, S.O., 2019. "An exact static solution approach for the service parts end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 272(2), pages 496-504.
    13. Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
    14. Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. van Jaarsveld, Willem & Dekker, Rommert, 2011. "Estimating obsolescence risk from demand data to enhance inventory control--A case study," International Journal of Production Economics, Elsevier, vol. 133(1), pages 423-431, September.
    2. Pourakbar, M. & Frenk, J.B.G. & Dekker, R., 2010. "End-of-Life Inventory Decisions for Consumer Electronics Service Parts," Econometric Institute Research Papers EI 2009-48, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    3. Pourakbar, Morteza & Dekker, Rommert, 2012. "Customer differentiated end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 222(1), pages 44-53.
    4. J. B. G. Frenk & Sonya Javadi & Semih O. Sezer, 2019. "An optimal stopping approach for the end-of-life inventory problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 329-363, December.
    5. Behfard, S. & van der Heijden, M.C. & Al Hanbali, A. & Zijm, W.H.M., 2015. "Last time buy and repair decisions for spare parts," European Journal of Operational Research, Elsevier, vol. 244(2), pages 498-510.
    6. van Jaarsveld, W.L., 2010. "Estimating obsolescence risk from demand data - a case study," Econometric Institute Research Papers EI 2010-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    7. Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.
    8. Krikke, H.R. & van der Laan, E., 2009. "Last Time Buy and Control Policies With Phase-Out Returns : A Case Study in Plant Control Systems," Discussion Paper 2009-66, Tilburg University, Center for Economic Research.
    9. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    10. Frenk, J.B.G. & Javadi, S. & Pourakbar, M. & Sezer, S.O., 2019. "An exact static solution approach for the service parts end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 272(2), pages 496-504.
    11. Van der Auweraer, Sarah & Boute, Robert N. & Syntetos, Aris A., 2019. "Forecasting spare part demand with installed base information: A review," International Journal of Forecasting, Elsevier, vol. 35(1), pages 181-196.
    12. M. Pourakbar & E. Laan & R. Dekker, 2014. "End-of-Life Inventory Problem with Phaseout Returns," Production and Operations Management, Production and Operations Management Society, vol. 23(9), pages 1561-1576, September.
    13. Karl Inderfurth & Rainer Kleber, 2010. "An Advanced Heuristic for Multiple-Option Spare Parts Procurement after End-of-Production," FEMM Working Papers 100005, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
    14. Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
    15. Shen, Yuelin & Willems, Sean P., 2014. "Modeling sourcing strategies to mitigate part obsolescence," European Journal of Operational Research, Elsevier, vol. 236(2), pages 522-533.
    16. J. B. G. Frenk & Canan Pehlivan & Semih O. Sezer, 2019. "Order and exit decisions under non-increasing price curves for products with short life cycles," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 365-397, December.
    17. Kim, Bowon & Park, Sangsun, 2008. "Optimal pricing, EOL (end of life) warranty, and spare parts manufacturing strategy amid product transition," European Journal of Operational Research, Elsevier, vol. 188(3), pages 723-745, August.
    18. R. Sundarraj, 2006. "A model for standardizing human decisions concerning service-contracts management," Annals of Operations Research, Springer, vol. 143(1), pages 171-189, March.
    19. Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase," European Journal of Operational Research, Elsevier, vol. 137(3), pages 497-511, March.
    20. Ozyoruk, Emin & Erkip, Nesim Kohen & Ararat, Çağın, 2022. "End-of-life inventory management problem: Results and insights," International Journal of Production Economics, Elsevier, vol. 243(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:60:y:2009:i:10:d:10.1057_jors.2008.111. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.