Lead-time quotation and hedging coordination in make-to-order supply chain
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2021.07.045
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Hammami, Ramzi & Frein, Yannick & Albana, Abduh S., 2020. "Delivery time quotation and pricing in two-stage supply chains: Centralized decision-making with global and local managerial approaches," European Journal of Operational Research, Elsevier, vol. 286(1), pages 164-177.
- Kut C. So, 2000. "Price and Time Competition for Service Delivery," Manufacturing & Service Operations Management, INFORMS, vol. 2(4), pages 392-409, April.
- Yue Zhai & Ray Y. Zhong & Zhi Li & George Huang, 2017. "Production lead-time hedging and coordination in prefabricated construction supply chain management," International Journal of Production Research, Taylor & Francis Journals, vol. 55(14), pages 3984-4002, July.
- Xiao, Tiaojun & Choi, Tsan-Ming & Cheng, T.C.E., 2016. "Delivery leadtime and channel structure decisions for make-to-order duopoly under different game scenarios," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 87(C), pages 113-129.
- Glock, C. H. & Kim, T., 2012. "A joint economic lot sizemodel with returnable transport items," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 59079, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Sabri Çelik & Costis Maglaras, 2008. "Dynamic Pricing and Lead-Time Quotation for a Multiclass Make-to-Order Queue," Management Science, INFORMS, vol. 54(6), pages 1132-1146, June.
- Zhu, Stuart X., 2015. "Integration of capacity, pricing, and lead-time decisions in a decentralized supply chain," International Journal of Production Economics, Elsevier, vol. 164(C), pages 14-23.
- Glock, C. H. & Rekik, Y. & Ries, J. M., 2020. "A coordination mechanism for supply chains with capacity expansions and order-dependent lead times," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 118935, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Öner-Közen, Miray & Minner, Stefan, 2017. "Impact of priority sequencing decisions on on-time probability and expected tardiness of orders in make-to-order production systems with external due-dates," European Journal of Operational Research, Elsevier, vol. 263(2), pages 524-539.
- Noori-Daryan, Mahsa & Taleizadeh, Ata Allah & Jolai, Fariborz, 2019. "Analyzing pricing, promised delivery lead time, supplier-selection, and ordering decisions of a multi-national supply chain under uncertain environment," International Journal of Production Economics, Elsevier, vol. 209(C), pages 236-248.
- Liming Liu & Mahmut Parlar & Stuart X. Zhu, 2007. "Pricing and Lead Time Decisions in Decentralized Supply Chains," Management Science, INFORMS, vol. 53(5), pages 713-725, May.
- Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
- Hu, Yinan & Guan, Yongpei & Liu, Tieming, 2011. "Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg games," European Journal of Operational Research, Elsevier, vol. 210(2), pages 231-240, April.
- Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2004. "Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time," International Journal of Production Economics, Elsevier, vol. 92(3), pages 255-266, December.
- Zhai, Yue & Choi, Tsan-Ming & Shao, Saijun & Xu, Su Xiu & Huang, George Q., 2020. "Spatial-temporal hedging coordination in prefabricated housing production," International Journal of Production Economics, Elsevier, vol. 229(C).
- Candace Arai Yano, 1987. "Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs," Management Science, INFORMS, vol. 33(1), pages 95-106, January.
- Kingsman, B. G. & Tatsiopoulos, I. P. & Hendry, L. C., 1989. "A structural methodology for managing manufacturing lead times in make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(2), pages 196-209, May.
- Saif Benjaafar & Ehsan Elahi & Karen L. Donohue, 2007. "Outsourcing via Service Competition," Management Science, INFORMS, vol. 53(2), pages 241-259, February.
- Feng, Jiejian & Zhang, Michael, 2017. "Dynamic quotation of leadtime and price for a Make-To-Order system with multiple customer classes and perfect information on customer preferences," European Journal of Operational Research, Elsevier, vol. 258(1), pages 334-342.
- So, Kut C. & Song, Jing-Sheng, 1998. "Price, delivery time guarantees and capacity selection," European Journal of Operational Research, Elsevier, vol. 111(1), pages 28-49, November.
- Xin Xu & Yao Zhao & Ching-Yu Chen, 2016. "Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects," Annals of Operations Research, Springer, vol. 241(1), pages 225-247, June.
- Hua, Guowei & Wang, Shouyang & Cheng, T.C.E., 2010. "Price and lead time decisions in dual-channel supply chains," European Journal of Operational Research, Elsevier, vol. 205(1), pages 113-126, August.
- Li, Xueping & Wang, Jiao & Sawhney, Rapinder, 2012. "Reinforcement learning for joint pricing, lead-time and scheduling decisions in make-to-order systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 99-109.
- Hsu, Shu-Lu & Lee, Chun Chen, 2009. "Replenishment and lead time decisions in manufacturer-retailer chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 45(3), pages 398-408, May.
- A. Baykal Hafızoğlu & Esma S. Gel & Pınar Keskinocak, 2016. "Price and Lead Time Quotation for Contract and Spot Customers," Operations Research, INFORMS, vol. 64(2), pages 406-415, April.
- Glock, Christoph H. & Rekik, Yacine & Ries, Jörg M., 2020. "A coordination mechanism for supply chains with capacity expansions and order-dependent lead times," European Journal of Operational Research, Elsevier, vol. 285(1), pages 247-262.
- Ramzi Hammami & Yannick Frein & Abduh Albana, 2020. "Delivery time quotation and pricing in two-stage supply chains: Centralized decision-making with global and local managerial approaches," Post-Print hal-02898219, HAL.
- Talay, Işılay & Özdemir-Akyıldırım, Öznur, 2019. "Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty," European Journal of Operational Research, Elsevier, vol. 275(2), pages 536-551.
- Leng, Mingming & Parlar, Mahmut, 2009. "Lead-time reduction in a two-level supply chain: Non-cooperative equilibria vs. coordination with a profit-sharing contract," International Journal of Production Economics, Elsevier, vol. 118(2), pages 521-544, April.
- Li, Haitao & Womer, Keith, 2012. "Optimizing the supply chain configuration for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 118-128.
- Sarker, Bhaba R. & Diponegoro, Ahmad, 2009. "Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers," European Journal of Operational Research, Elsevier, vol. 194(3), pages 753-773, May.
- Glock, C. H., 2012. "The joint economic lot size problem: a review," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57811, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Tianwen Chen & Ronghu Zhou & Changqing Liu & Xiang Xu, 2023. "Research on Coordination in a Dual-Channel Green Supply Chain under Live Streaming Mode," Sustainability, MDPI, vol. 15(1), pages 1-23, January.
- Zheng, Meimei & Dong, Shuangshuang & Zhou, Yaoming & Choi, Tsan-Ming, 2023. "Sourcing decisions with uncertain time-dependent supply from an unreliable supplier," European Journal of Operational Research, Elsevier, vol. 308(3), pages 1365-1379.
- Zhai, Yue & Hua, Guowei & Cheng, Meng & Cheng, T.C.E., 2023. "Production lead-time hedging and order allocation in an MTO supply chain," European Journal of Operational Research, Elsevier, vol. 311(3), pages 887-905.
- Liu, Jian & Chen, Jian & Bo, Rui & Meng, Fanlin & Xu, Yong & Li, Peng, 2023. "Increases or discounts: Price strategies based on customers’ patience times," European Journal of Operational Research, Elsevier, vol. 305(2), pages 722-737.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Zhai, Yue & Hua, Guowei & Cheng, Meng & Cheng, T.C.E., 2023. "Production lead-time hedging and order allocation in an MTO supply chain," European Journal of Operational Research, Elsevier, vol. 311(3), pages 887-905.
- Hammami, Ramzi & Frein, Yannick & Nouira, Imen & Albana, Abduh-Sayid, 2022. "On the interplay between local lead times, overall lead time, prices, and profits in decentralized supply chains," International Journal of Production Economics, Elsevier, vol. 243(C).
- Xiao, Tiaojun & Choi, Tsan-Ming & Cheng, T.C.E., 2016. "Delivery leadtime and channel structure decisions for make-to-order duopoly under different game scenarios," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 87(C), pages 113-129.
- Zhao, Jing & Zhang, Qin, 2021. "The effect of contract methods on the lead time of a two-level photovoltaic supply chain: revenue-sharing vs. cost-sharing," Energy, Elsevier, vol. 231(C).
- Yang, Yang & Liu, Jie & Hu, Taizhong, 2023. "Capital allocation and pricing decisions under trade credit with time-sensitive stochastic demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 173(C).
- Zhai, Yue & Choi, Tsan-Ming & Shao, Saijun & Xu, Su Xiu & Huang, George Q., 2020. "Spatial-temporal hedging coordination in prefabricated housing production," International Journal of Production Economics, Elsevier, vol. 229(C).
- Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
- Hammami, Ramzi & Asgari, Erfan & Frein, Yannick & Nouira, Imen, 2022. "Time- and price-based product differentiation in hybrid distribution with stockout-based substitution," European Journal of Operational Research, Elsevier, vol. 300(3), pages 884-901.
- Zhu, Stuart X., 2015. "Integration of capacity, pricing, and lead-time decisions in a decentralized supply chain," International Journal of Production Economics, Elsevier, vol. 164(C), pages 14-23.
- Sun, Yiqi & Wu, Zhengping & Zhu, Wanshan, 2022. "When do firms benefit from joint price and lead-time competition?," European Journal of Operational Research, Elsevier, vol. 302(2), pages 497-517.
- Noori-Daryan, Mahsa & Taleizadeh, Ata Allah & Jolai, Fariborz, 2019. "Analyzing pricing, promised delivery lead time, supplier-selection, and ordering decisions of a multi-national supply chain under uncertain environment," International Journal of Production Economics, Elsevier, vol. 209(C), pages 236-248.
- K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
- Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).
- Meherishi, Lavanya & Narayana, Sushmita A. & Ranjani, K.S., 2021. "Integrated product and packaging decisions with secondary packaging returns and protective packaging management," European Journal of Operational Research, Elsevier, vol. 292(3), pages 930-952.
- AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
- Weixin Shang & Liming Liu, 2011. "Promised Delivery Time and Capacity Games in Time-Based Competition," Management Science, INFORMS, vol. 57(3), pages 599-610, March.
- Zhang, Jian & Nault, Barrie R. & Tu, Yiliu, 2015. "A dynamic pricing strategy for a 3PL provider with heterogeneous customers," International Journal of Production Economics, Elsevier, vol. 169(C), pages 31-43.
- Ma, Jun & Nault, Barrie R. & Tu, Yiliu (Paul), 2023. "Customer segmentation, pricing, and lead time decisions: A stochastic-user-equilibrium perspective," International Journal of Production Economics, Elsevier, vol. 264(C).
- Yue Zhai & Ray Y. Zhong & Zhi Li & George Huang, 2017. "Production lead-time hedging and coordination in prefabricated construction supply chain management," International Journal of Production Research, Taylor & Francis Journals, vol. 55(14), pages 3984-4002, July.
- Wu, Kan & Yuan, Xue-Ming, 2016. "Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demandAuthor-Name: Zhao, Shi Tao," European Journal of Operational Research, Elsevier, vol. 255(2), pages 364-379.
More about this item
Keywords
Supply chain management; Game theory; Lead-time quotation; Hedging; Make-to-order;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:300:y:2022:i:2:p:449-460. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.