Single-machine scheduling with waiting-time-dependent due dates

Author

Listed:
  • Koulamas, Christos
  • Kyparisis, George J.

Abstract

We consider a single-machine scheduling problem in which due dates are linear functions of the job waiting-times and the objective is to minimize the maximum lateness. An optimal sequence is constructed by implementing an index-based priority rule for a fixed value of the due date normalizing constant k. We determine in polynomial time all the k value ranges so that the optimal sequence remains the same within each range. The optimal due dates are computed as linear functions of the global optimal value of k. The overall procedure is illustrated in a numerical example.

Suggested Citation

  • Koulamas, Christos & Kyparisis, George J., 2008. "Single-machine scheduling with waiting-time-dependent due dates," European Journal of Operational Research, Elsevier, vol. 191(2), pages 577-581, December.
  • Handle: RePEc:eee:ejores:v:191:y:2008:i:2:p:577-581
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(07)00889-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. James K. Weeks, 1979. "A Simulation Study of Predictable Due-Dates," Management Science, INFORMS, vol. 25(4), pages 363-373, April.
    2. Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.
    2. MLINAR, Tanja B. & CHEVALIER, Philippe, 2013. "Pooling in manufacturing: do opposites attract?," LIDAM Discussion Papers CORE 2013040, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Nekoiemehr, Nooshin & Zhang, Guoqing & Selvarajah, Esaignani, 2019. "Due date quotation in a dual-channel supply chain," International Journal of Production Economics, Elsevier, vol. 215(C), pages 102-111.
    2. Raaymakers, W. H. M. & Weijters, A. J. M. M., 2003. "Makespan estimation in batch process industries: A comparison between regression analysis and neural networks," European Journal of Operational Research, Elsevier, vol. 145(1), pages 14-30, February.
    3. Pinar Keskinocak & R. Ravi & Sridhar Tayur, 2001. "Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues," Management Science, INFORMS, vol. 47(2), pages 264-279, February.
    4. Sabuncuoglu, I. & Comlekci, A., 2002. "Operation-based flowtime estimation in a dynamic job shop," Omega, Elsevier, vol. 30(6), pages 423-442, December.
    5. H.M. Raaymakers, Wenny & Will M. Bertrand, J. & C. Fransoo, Jan, 2001. "Makespan estimation in batch process industries using aggregate resource and job set characteristics," International Journal of Production Economics, Elsevier, vol. 70(2), pages 145-161, March.
    6. Ozturk, Atakan & Kayaligil, Sinan & Ozdemirel, Nur E., 2006. "Manufacturing lead time estimation using data mining," European Journal of Operational Research, Elsevier, vol. 173(2), pages 683-700, September.
    7. Enns, S. T., 1998. "Lead time selection and the behaviour of work flow in job shops," European Journal of Operational Research, Elsevier, vol. 109(1), pages 122-136, August.
    8. Raaymakers, Wenny H. M. & Fransoo, Jan C., 2000. "Identification of aggregate resource and job set characteristics for predicting job set makespan in batch process industries," International Journal of Production Economics, Elsevier, vol. 68(2), pages 137-149, November.
    9. Roman Kapuscinski & Sridhar Tayur, 2007. "Reliable Due-Date Setting in a Capacitated MTO System with Two Customer Classes," Operations Research, INFORMS, vol. 55(1), pages 56-74, February.
    10. Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.
    11. Slotnick, Susan A. & Sobel, Matthew J., 2005. "Manufacturing lead-time rules: Customer retention versus tardiness costs," European Journal of Operational Research, Elsevier, vol. 163(3), pages 825-856, June.
    12. Saeed Yaghoubi, 2015. "Due-date assignment for multi-server multi-stage assembly systems," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(7), pages 1246-1256, May.
    13. Zhenying Zhao & Michael Ball & Masahiro Kotake, 2005. "Optimization-Based Available-To-Promise with Multi-Stage Resource Availability," Annals of Operations Research, Springer, vol. 135(1), pages 65-85, March.
    14. Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
    15. Prabuddha De & Jay B. Ghosh & Charles E. Wells, 1994. "Due‐date assignment and early/tardy scheduling on identical parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 17-32, February.
    16. X. Cai & F. S. Tu, 1996. "Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early‐tardy penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(8), pages 1127-1146, December.
    17. Sarper, H. & Henry, M. C., 1996. "Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop," Omega, Elsevier, vol. 24(1), pages 73-81, February.
    18. Philip Kaminsky & Onur Kaya, 2008. "Scheduling and due‐date quotation in a make‐to‐order supply chain," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(5), pages 444-458, August.
    19. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    20. Vineet Jain & Tilak Raj, 2018. "An adaptive neuro-fuzzy inference system for makespan estimation of flexible manufacturing system assembly shop: a case study," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(6), pages 1302-1314, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:191:y:2008:i:2:p:577-581. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.