Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Leong, GK & Oliff, MD, 1990. "A sequencing heuristic for dependent setups in a batch process industry," Omega, Elsevier, vol. 18(3), pages 283-297.
- Nagar, Amit & Haddock, Jorge & Heragu, Sunderesh, 1995. "Multiple and bicriteria scheduling: A literature survey," European Journal of Operational Research, Elsevier, vol. 81(1), pages 88-104, February.
- Brandimarte, Paolo, 1999. "Exploiting process plan flexibility in production scheduling: A multi-objective approach," European Journal of Operational Research, Elsevier, vol. 114(1), pages 59-71, April.
- Blazewicz, Jacek & Domschke, Wolfgang & Pesch, Erwin, 1996. "The job shop scheduling problem: Conventional and new solution techniques," European Journal of Operational Research, Elsevier, vol. 93(1), pages 1-33, August.
- Lee, Young Hoon & Pinedo, Michael, 1997. "Scheduling jobs on parallel machines with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 100(3), pages 464-474, August.
- Selen, W. J. & Heuts, R. M. J., 1990. "Operational production planning in a chemical manufacturing environment," European Journal of Operational Research, Elsevier, vol. 45(1), pages 38-46, March.
- Bjorndal, M. H. & Caprara, A. & Cowling, P. I. & Della Croce, F. & Lourenco, H. & Malucelli, F. & Orman, A. J. & Pisinger, D. & Rego, C. & Salazar, J. J., 1995. "Some thoughts on combinatorial optimisation," European Journal of Operational Research, Elsevier, vol. 83(2), pages 253-270, June.
- Sabuncuoglu, Ihsan & Gurgun, Burckaan, 1996. "A neural network model for scheduling problems," European Journal of Operational Research, Elsevier, vol. 93(2), pages 288-299, September.
- Franca, Paulo M. & Gendreau, Michel & Laporte, Gilbert & Muller, Felipe M., 1996. "A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times," International Journal of Production Economics, Elsevier, vol. 43(2-3), pages 79-89, June.
- Valls, Vicente & Angeles Perez, M. & Sacramento Quintanilla, M., 1998. "A tabu search approach to machine scheduling," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 277-300, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Moncayo-Martínez, Luis A. & Zhang, David Z., 2011. "Multi-objective ant colony optimisation: A meta-heuristic approach to supply chain design," International Journal of Production Economics, Elsevier, vol. 131(1), pages 407-420, May.
- Ferretti, Ivan & Zanoni, Simone & Zavanella, Lucio, 2006. "Production-inventory scheduling using Ant System metaheuristic," International Journal of Production Economics, Elsevier, vol. 104(2), pages 317-326, December.
- Bo Liu & Ling Wang & Ying Liu & Shouyang Wang, 2011. "A unified framework for population-based metaheuristics," Annals of Operations Research, Springer, vol. 186(1), pages 231-262, June.
- Garcia-Martinez, C. & Cordon, O. & Herrera, F., 2007. "A taxonomy and an empirical analysis of multiple objective ant colony optimization algorithms for the bi-criteria TSP," European Journal of Operational Research, Elsevier, vol. 180(1), pages 116-148, July.
- C Gagné & M Gravel & W L Price, 2005. "Using metaheuristic compromise programming for the solution of multiple-objective scheduling problems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(6), pages 687-698, June.
- Labiba Noshin Asha & Arup Dey & Nita Yodo & Lucy G. Aragon, 2022. "Optimization Approaches for Multiple Conflicting Objectives in Sustainable Green Supply Chain Management," Sustainability, MDPI, vol. 14(19), pages 1-24, October.
- Gagne, Caroline & Gravel, Marc & Price, Wilson L., 2006. "Solving real car sequencing problems with ant colony optimization," European Journal of Operational Research, Elsevier, vol. 174(3), pages 1427-1448, November.
- Goutam Dutta & Payal Apujani & Narain Gupta, 2016. "An Introduction to the Aluminium Industry and Survey of OR Applications in an Integrated Aluminium Plant," Working Papers id:11097, eSocialSciences.
- Pablo Valledor & Alberto Gomez & Javier Puente & Isabel Fernandez, 2022. "Solving Rescheduling Problems in Dynamic Permutation Flow Shop Environments with Multiple Objectives Using the Hybrid Dynamic Non-Dominated Sorting Genetic II Algorithm," Mathematics, MDPI, vol. 10(14), pages 1-20, July.
- Xu, Rui & Chen, Huaping & Li, Xueping, 2013. "A bi-objective scheduling problem on batch machines via a Pareto-based ant colony system," International Journal of Production Economics, Elsevier, vol. 145(1), pages 371-386.
- Farhan Aadil & Khalid Bashir Bajwa & Salabat Khan & Nadeem Majeed Chaudary & Adeel Akram, 2016. "CACONET: Ant Colony Optimization (ACO) Based Clustering Algorithm for VANET," PLOS ONE, Public Library of Science, vol. 11(5), pages 1-21, May.
- Sahar Ebadinezhad & Ziya Dereboylu & Enver Ever, 2019. "Clustering-Based Modified Ant Colony Optimizer for Internet of Vehicles (CACOIOV)," Sustainability, MDPI, vol. 11(9), pages 1-22, May.
- Apujani, Payal & Dutta, Goutam & Gupta, Narain, 2016. "An Introduction to the Aluminum Industry and Survey of OR Applications in an Integrated Aluminum Plant," IIMA Working Papers WP2016-03-50, Indian Institute of Management Ahmedabad, Research and Publication Department.
- Moncayo-Martínez, Luis A. & Zhang, David Z., 2013. "Optimising safety stock placement and lead time in an assembly supply chain using bi-objective MAX–MIN ant system," International Journal of Production Economics, Elsevier, vol. 145(1), pages 18-28.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ferretti, Ivan & Zanoni, Simone & Zavanella, Lucio, 2006. "Production-inventory scheduling using Ant System metaheuristic," International Journal of Production Economics, Elsevier, vol. 104(2), pages 317-326, December.
- Liao, C. J. & Yu, W. C., 1996. "Sequencing heuristics for dependent setups in a continuous process industry," Omega, Elsevier, vol. 24(6), pages 649-659, December.
- Vallada, Eva & Ruiz, Rubén, 2011. "A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times," European Journal of Operational Research, Elsevier, vol. 211(3), pages 612-622, June.
- Ashayeri, J. & van Esch, W.H.L. & Heuts, R.M.J., 1992. "Amendment of Heuts-Selen's lotsizing and sequencing heuristic for single stage process manufacturing systems," Research Memorandum FEW 579, Tilburg University, School of Economics and Management.
- Mattfeld, Dirk C. & Bierwirth, Christian, 2004. "An efficient genetic algorithm for job shop scheduling with tardiness objectives," European Journal of Operational Research, Elsevier, vol. 155(3), pages 616-630, June.
- Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
- Ashayeri, J. & van Esch, W.H.L. & Heuts, R.M.J., 1992. "Amendment of Heuts-Selen's lotsizing and sequencing heuristic for single stage process manufacturing systems," Other publications TiSEM 0cf065b7-4836-4cdd-9317-0, Tilburg University, School of Economics and Management.
- J. E. Beasley & M. Krishnamoorthy & Y. M. Sharaiha & D. Abramson, 2000. "Scheduling Aircraft Landings—The Static Case," Transportation Science, INFORMS, vol. 34(2), pages 180-197, May.
- Armentano, Vinicius Amaral & de Franca Filho, Moacir Felizardo, 2007. "Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach," European Journal of Operational Research, Elsevier, vol. 183(1), pages 100-114, November.
- Derya Deliktaş, 2022. "Self-adaptive memetic algorithms for multi-objective single machine learning-effect scheduling problems with release times," Flexible Services and Manufacturing Journal, Springer, vol. 34(3), pages 748-784, September.
- Sels, Veronique & Craeymeersch, Kjeld & Vanhoucke, Mario, 2011.
"A hybrid single and dual population search procedure for the job shop scheduling problem,"
European Journal of Operational Research, Elsevier, vol. 215(3), pages 512-523, December.
- V. Sels & K. Craeymeersch & M. Vanhoucke, 2010. "A hybrid single and dual population search procedure for the job shop scheduling problem," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 10/679, Ghent University, Faculty of Economics and Business Administration.
- Anurag Agarwal & Varghese S. Jacob & Hasan Pirkul, 2006. "An Improved Augmented Neural-Network Approach for Scheduling Problems," INFORMS Journal on Computing, INFORMS, vol. 18(1), pages 119-128, February.
- Raaymakers, W. H. M. & Weijters, A. J. M. M., 2003. "Makespan estimation in batch process industries: A comparison between regression analysis and neural networks," European Journal of Operational Research, Elsevier, vol. 145(1), pages 14-30, February.
- Alidaee, Bahram & Kochenberger, Gary A. & Amini, Mohammad M., 2001. "Greedy solutions of selection and ordering problems," European Journal of Operational Research, Elsevier, vol. 134(1), pages 203-215, October.
- Jacomine Grobler & Andries Engelbrecht & Schalk Kok & Sarma Yadavalli, 2010. "Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time," Annals of Operations Research, Springer, vol. 180(1), pages 165-196, November.
- Ganesan, Viswanath Kumar & Sivakumar, Appa Iyer, 2006. "Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times," International Journal of Production Economics, Elsevier, vol. 103(2), pages 633-647, October.
- Pempera, Jaroslaw & Smutnicki, Czeslaw, 2018. "Open shop cyclic scheduling," European Journal of Operational Research, Elsevier, vol. 269(2), pages 773-781.
- Vitayasak, Srisatja & Pongcharoen, Pupong & Hicks, Chris, 2017. "A tool for solving stochastic dynamic facility layout problems with stochastic demand using either a Genetic Algorithm or modified Backtracking Search Algorithm," International Journal of Production Economics, Elsevier, vol. 190(C), pages 146-157.
- Honorine Harlé & Sophie Hooge & Pascal Le Masson & Kevin Levillain & Benoit Weil & Guillaume Bulin & Thierry Menard, 2019. "Innovative design in factory: new methods to go from closed to expandable prescriptions at the shop floor," Working Papers hal-02094246, HAL.
- Wu, Lingxiao & Wang, Shuaian, 2018. "Exact and heuristic methods to solve the parallel machine scheduling problem with multi-processor tasks," International Journal of Production Economics, Elsevier, vol. 201(C), pages 26-40.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:143:y:2002:i:1:p:218-229. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.