IDEAS home Printed from https://ideas.repec.org/a/eee/ecmode/v39y2014icp163-167.html
   My bibliography  Save this article

Combining an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in production

Author

Listed:
  • Chiu, Yuan-Shyi Peter
  • Chen, Yung-Chung
  • Lin, Hong-Dar
  • Chang, Huei-Hsin

Abstract

Operating in highly competitive global markets, management of the contemporary corporations constantly seeks to cut down various operating costs, such as inventory holding costs in the production units and their affiliated retailers. For the purpose of reducing stock holding cost, this paper combines an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in production. We extend a study by Chiu et al. (2013a) by augmenting an alternative n+1 product distribution policy to their integrated inventory system. An initial delivery of finished items is shipped to multiple retailers to meet demand during the production unit's uptime. After the remaining production lot is produced and screened, fixed quantity n installments of the finished products are delivered to retailers at a fixed time interval. With the help of a mathematical model along with Hessian matrix equations, the closed-form optimal operating policies for the proposed system are derived. Further, the study demonstrates, through a numerical example, significant savings in stock holding cost for both the production unit and retailers.

Suggested Citation

  • Chiu, Yuan-Shyi Peter & Chen, Yung-Chung & Lin, Hong-Dar & Chang, Huei-Hsin, 2014. "Combining an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in production," Economic Modelling, Elsevier, vol. 39(C), pages 163-167.
  • Handle: RePEc:eee:ecmode:v:39:y:2014:i:c:p:163-167
    DOI: 10.1016/j.econmod.2014.02.031
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0264999314000753
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.econmod.2014.02.031?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Glock, Christoph H., 2012. "Coordination of a production network with a single buyer and multiple vendors," International Journal of Production Economics, Elsevier, vol. 135(2), pages 771-780.
    2. Sucky, Eric, 2005. "Inventory management in supply chains: A bargaining problem," International Journal of Production Economics, Elsevier, vol. 93(1), pages 253-262, January.
    3. Leroy B. Schwarz, 1973. "A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem," Management Science, INFORMS, vol. 19(5), pages 555-566, January.
    4. Chiu, Singa Wang & Chou, Chung-Li & Wu, Wen-Kuei, 2013. "Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown," Economic Modelling, Elsevier, vol. 35(C), pages 330-337.
    5. Leroy B. Schwarz & Bryan L. Deuermeyer & Ralph D. Badinelli, 1985. "Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System," Management Science, INFORMS, vol. 31(4), pages 488-498, April.
    6. Glock, C. H., 2012. "Coordination of a production network with a single buyer and multiple vendors," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57812, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    7. Viswanathan, S., 1998. "Optimal strategy for the integrated vendor-buyer inventory model," European Journal of Operational Research, Elsevier, vol. 105(1), pages 38-42, February.
    8. Thomas, Douglas J. & Hackman, Steven T., 2003. "A committed delivery strategy with fixed frequency and quantity," European Journal of Operational Research, Elsevier, vol. 148(2), pages 363-373, July.
    9. Sana, Shib Sankar, 2010. "A production-inventory model in an imperfect production process," European Journal of Operational Research, Elsevier, vol. 200(2), pages 451-464, January.
    10. Sana, Shib Sankar, 2012. "A collaborating inventory model in a supply chain," Economic Modelling, Elsevier, vol. 29(5), pages 2016-2023.
    11. Chiu, Singa Wang & Pai, Fan-Yun & Wu, Wen Kuei, 2013. "Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework," Economic Modelling, Elsevier, vol. 35(C), pages 593-596.
    12. Sarkar, Biswajit & Sarkar, Sumon, 2013. "An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand," Economic Modelling, Elsevier, vol. 30(C), pages 924-932.
    13. Hall, Randolph W., 1996. "On the integration of production and distribution: Economic order and production quantity implications," Transportation Research Part B: Methodological, Elsevier, vol. 30(5), pages 387-403, October.
    14. Alghalith, Moawia, 2013. "The interaction among production, hedging and investment decisions," Economic Modelling, Elsevier, vol. 30(C), pages 193-195.
    15. Pal, Brojeswar & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2012. "A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption," Economic Modelling, Elsevier, vol. 29(5), pages 1891-1898.
    16. Chelbi, Anis & Rezg, Nidhal, 2006. "Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 131-143, February.
    17. Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.
    18. Jean-Philippe Gayon & Saif Benjaafar & Francis de Véricourt, 2009. "Using Imperfect Advance Demand Information in Production-Inventory Systems with Multiple Customer Classes," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 128-143, July.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chiu, Yuan-Shyi Peter & Huang, Chao-Chih & Wu, Mei-Fang & Chang, Huei-Hsin, 2013. "Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate," Economic Modelling, Elsevier, vol. 35(C), pages 112-117.
    2. Chiu, Singa Wang & Lin, Li-Wen & Chen, Kuang-Ku & Chou, Chung-Li, 2013. "Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule," Economic Modelling, Elsevier, vol. 33(C), pages 668-675.
    3. Tseng, Chao-Tang & Wu, Mei-Fang & Lin, Hong-Dar & Chiu, Yuan-Shyi Peter, 2014. "Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach," Economic Modelling, Elsevier, vol. 36(C), pages 30-36.
    4. Chiu, Singa Wang & Chou, Chung-Li & Wu, Wen-Kuei, 2013. "Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown," Economic Modelling, Elsevier, vol. 35(C), pages 330-337.
    5. Herbon, Avi, 2020. "An approximated solution to the constrained integrated manufacturer-buyer supply problem," Operations Research Perspectives, Elsevier, vol. 7(C).
    6. Paul, Sanjoy Kumar & Sarker, Ruhul & Essam, Daryl, 2014. "Managing real-time demand fluctuation under a supplier–retailer coordinated system," International Journal of Production Economics, Elsevier, vol. 158(C), pages 231-243.
    7. Chiu, Yuan-Shyi Peter & Chang, Huei-Hsin, 2014. "Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note," Economic Modelling, Elsevier, vol. 37(C), pages 143-148.
    8. Sarkar, Mitali & Sarkar, Biswajit, 2013. "An economic manufacturing quantity model with probabilistic deterioration in a production system," Economic Modelling, Elsevier, vol. 31(C), pages 245-252.
    9. Muhammad Tayyab & Biswajit Sarkar & Bernardo Nugroho Yahya, 2018. "Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand," Mathematics, MDPI, vol. 7(1), pages 1-18, December.
    10. Beck, Fabian G. & Glock, Christoph H. & Kim, Taebok, 2017. "Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments," International Journal of Production Economics, Elsevier, vol. 193(C), pages 633-646.
    11. Song, Dong-Ping & Dong, Jing-Xin & Xu, Jingjing, 2014. "Integrated inventory management and supplier base reduction in a supply chain with multiple uncertainties," European Journal of Operational Research, Elsevier, vol. 232(3), pages 522-536.
    12. Bimal Kumar Sett & Bikash Koli Dey & Biswajit Sarkar, 2020. "Autonomated Inspection Policy for Smart Factory—An Improved Approach," Mathematics, MDPI, vol. 8(10), pages 1-19, October.
    13. Serin, Yasemin, 2012. "A geometric representation of profits in a supply chain network," International Journal of Production Economics, Elsevier, vol. 137(1), pages 36-44.
    14. Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
    15. Hwang, Juhwen & Wan, Yat-wah, 2013. "A supplier–retailer supply chain with intermediate storage for batch ordering," International Journal of Production Economics, Elsevier, vol. 142(2), pages 343-352.
    16. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    17. Sarkar, Biswajit & Majumder, Arunava, 2013. "A study on three different dimensional facility location problems," Economic Modelling, Elsevier, vol. 30(C), pages 879-887.
    18. R. Sundara rajan & R. Uthayakumar, 2017. "Comprehensive solution procedure for optimizing replenishment policies of instantaneous deteriorating items with stock-dependent demand under partial trade credit linked to order quantity," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1343-1373, November.
    19. Sarker, Bhaba R. & Rochanaluk, Ratkrit & Yi, Huizhi & Egbelu, Pius J., 2014. "An operational policy for a three-stage distributive supply chain system with retailers’ backorders," International Journal of Production Economics, Elsevier, vol. 156(C), pages 332-345.
    20. Sanjoy Kumar Paul & Ruhul Sarker & Daryl Essam, 2018. "A reactive mitigation approach for managing supply disruption in a three-tier supply chain," Journal of Intelligent Manufacturing, Springer, vol. 29(7), pages 1581-1597, October.

    More about this item

    Keywords

    Supply chains; Production–shipment policy; Multiple retailers; Cost reducing delivery policy; Synchronous deliveries;
    All these keywords.

    JEL classification:

    • C02 - Mathematical and Quantitative Methods - - General - - - Mathematical Economics
    • C44 - Mathematical and Quantitative Methods - - Econometric and Statistical Methods: Special Topics - - - Operations Research; Statistical Decision Theory
    • M11 - Business Administration and Business Economics; Marketing; Accounting; Personnel Economics - - Business Administration - - - Production Management
    • C61 - Mathematical and Quantitative Methods - - Mathematical Methods; Programming Models; Mathematical and Simulation Modeling - - - Optimization Techniques; Programming Models; Dynamic Analysis

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ecmode:v:39:y:2014:i:c:p:163-167. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/inca/30411 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.