IDEAS home Printed from https://ideas.repec.org/a/cwk/ajocsl/2026-067.html

Assessment of the Role of the Deming Cycle in Enhancing the Implementation of Constituency Development Fund (CDF) Projects in Lusaka

Author

Listed:
  • Banda, Jeff

    (University of Zambia)

  • Mutono-Mwanza, Bupe G.

    (University of Zambia)

Abstract

This study applied the Deming Cycle (Plan-Do-Check-Act) to improve continual improvement practices in Constituency Development Fund (CDF) projects in Zambia. Three objectives guided the research: (i) assess how PDCA stages can strengthen planning, monitoring, and evaluation; (ii) analyze the extent PDCA addresses performance gaps; and (iii) develop a PDCA-based framework tailored to CDF projects. Despite CDF allocations increasing from K1.6 million per constituency in 2021 to K25.7 million in 2023, only 58% of funds are disbursed and 65% of projects face delays or abandonment. Independent variables comprised PDCA stage practices (PLAN, DO, CHECK, ACT). Dependent variables included project performance indicators (delays, cost overruns, community satisfaction, quality, functionality). Monitoring effectiveness, learning application, and planning quality served as mediating constructs. Explanatory sequential mixed-methods design across three Lusaka constituencies (Mandevu urban, Matero peri-urban, Chongwe rural-urban mix). Surveys (n=140, 94.0% response rate), 15 key informant interviews, 3 focus groups (n=30), and 40 project documents. Quantitative analysis used SPSS v26 (descriptive statistics, Pearson correlation, one-way ANOVA, multiple linear regression: Y = β₀ + β₠X₠+ β₂X₂ + β₃X₃ + ε). Qualitative analysis used NVivo 12 (thematic analysis). Systemic failures permeate all PDCA stages: PLAN (mean=2.83 consultation, 2.51 technical input), DO (mean=2.12 fund disbursement; 42.9% identify funding delays as primary cause), CHECK (mean=2.38 monitoring; 60.0% rate ineffective), ACT (mean=2.13; only 10.7% report formal corrective processes). Performance gaps are pervasive: 70.7% report frequent delays, 56.4% cost overruns, 60.0% dissatisfaction with community involvement, 57.1% indicate 85% agreement) but express capacity concerns (28.6%) and system flexibility doubts (25.0%). This study makes three original contributions. First, it bridges quality management theory (TQM/PDCA) with decentralized development practice, empirically validating PDCA's applicability in resource-constrained, politically sensitive grassroots project environments, an underexplored context. Second, it provides the first empirical ranking of PDCA stage effects in development projects, demonstrating monitoring (CHECK) as the strongest success predictor (β=0.41), followed by learning (ACT) (β=0.29), a hierarchical finding with resource allocation implications. Third, it develops the CDF-PDCA Continuum Model, a practical framework with constituency-specific adaptations (urban political accountability, peri-urban capacity building, rural accessibility solutions), operationalizing continuous improvement for Zambia's largest decentralized funding mechanism.

Suggested Citation

  • Banda, Jeff & Mutono-Mwanza, Bupe G., 2026. "Assessment of the Role of the Deming Cycle in Enhancing the Implementation of Constituency Development Fund (CDF) Projects in Lusaka," African Journal of Commercial Studies, African Journal of Commercial Studies, vol. 7(4).
  • Handle: RePEc:cwk:ajocsl:2026-067
    DOI: 10.59413/ajocs/v7.i4.2.34
    as

    Download full text from publisher

    File URL: https://ijcsacademia.com/index.php/journal/article/view/698
    Download Restriction: no

    File URL: https://libkey.io/10.59413/ajocs/v7.i4.2.34?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;

    JEL classification:

    • H72 - Public Economics - - State and Local Government; Intergovernmental Relations - - - State and Local Budget and Expenditures
    • H83 - Public Economics - - Miscellaneous Issues - - - Public Administration
    • L15 - Industrial Organization - - Market Structure, Firm Strategy, and Market Performance - - - Information and Product Quality
    • O22 - Economic Development, Innovation, Technological Change, and Growth - - Development Planning and Policy - - - Project Analysis

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:cwk:ajocsl:2026-067. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Charles G. Kamau (email available below). General contact details of provider: https://ijcsacademia.com/index.php/journal .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.