A Comparison of Strategies to Dampen Nervousness in MRP Systems

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. de Kok, Ton & Inderfurth, Karl, 1997. "Nervousness in inventory management: Comparison of basic control rules," European Journal of Operational Research, Elsevier, vol. 103(1), pages 55-82, November.
  2. Kimms, A, 1998. "Stability Measures for Rolling Schedules with Applications to Capacity Expansion Planning, Master Production Scheduling, and Lot Sizing," Omega, Elsevier, vol. 26(3), pages 355-366, June.
  3. Tunc, Huseyin & Kilic, Onur A. & Tarim, S. Armagan & Eksioglu, Burak, 2013. "A simple approach for assessing the cost of system nervousness," International Journal of Production Economics, Elsevier, vol. 141(2), pages 619-625.
  4. Grubbstrom, Robert W. & Tang, Ou, 2000. "Modelling rescheduling activities in a multi-period production-inventory system," International Journal of Production Economics, Elsevier, vol. 68(2), pages 123-135, November.
  5. Özen, Ulaş & Doğru, Mustafa K. & Armagan Tarim, S., 2012. "Static-dynamic uncertainty strategy for a single-item stochastic inventory control problem," Omega, Elsevier, vol. 40(3), pages 348-357.
  6. Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
  7. Friederike Wall, 2024. "Incomplete incentive contracts in complex task environments: an agent-based simulation with minimal intelligence agents," Journal of Economic Interaction and Coordination, Springer;Society for Economic Science with Heterogeneous Interacting Agents, vol. 19(3), pages 523-552, July.
  8. Daniel Thiel, 1998. "Mise en évidence de l'instabilité des modèles de réapprovisionnement continu par une analyse dynamique des systèmes logistiques," Post-Print hal-02158955, HAL.
  9. Barba-Gutierrez, Y. & Adenso-Diaz, B. & Gupta, S.M., 2008. "Lot sizing in reverse MRP for scheduling disassembly," International Journal of Production Economics, Elsevier, vol. 111(2), pages 741-751, February.
  10. Zhao, Xiande & Lam, Kokin, 1997. "Lot-sizing rules and freezing the master production schedule in material requirements planning systems," International Journal of Production Economics, Elsevier, vol. 53(3), pages 281-305, December.
  11. Demirel, Edil & Özelkan, Ertunga C. & Lim, Churlzu, 2018. "Aggregate planning with Flexibility Requirements Profile," International Journal of Production Economics, Elsevier, vol. 202(C), pages 45-58.
  12. Salewski, Frank & Nissen, Rüdiger, 1993. "Revidierende hierarchische Planung: Ein Konzept am Beispiel der Personaleinsatzplanung in Wirtschaftsprüfungsgesellschaften," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 335, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  13. Kilic, Onur A. & Tarim, S. Armagan, 2011. "An investigation of setup instability in non-stationary stochastic inventory systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 286-292, September.
  14. Simpson, N. C., 1999. "Multiple level production planning in rolling horizon assembly environments," European Journal of Operational Research, Elsevier, vol. 114(1), pages 15-28, April.
  15. Thiel, Daniel, 1998. "Mise en évidence de l'instabilité des modèles de réapprovisionnement continu par une analyse dynamique des systèmes logistiques," Économie rurale, French Society of Rural Economics (SFER Société Française d'Economie Rurale), vol. 245.
  16. Chen, Wenchong & Gong, Xuejian & Rahman, Humyun Fuad & Liu, Hongwei & Qi, Ershi, 2021. "Real-time order acceptance and scheduling for data-enabled permutation flow shops: Bilevel interactive optimization with nonlinear integer programming," Omega, Elsevier, vol. 105(C).
  17. Xie, Jinxing & Zhao, Xiande & Lee, T. S., 2003. "Freezing the master production schedule under single resource constraint and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 83(1), pages 65-84, January.
  18. Daniel Thiel, 1998. "Mise en évidence de l'instabilité des modèles de réapprovisionnement continu par une analyse dynamique des systèmes logistiques," Économie rurale, Programme National Persée, vol. 245(1), pages 56-68.
  19. van Donselaar, K. & van den Nieuwenhof, J. & Visschers, J., 2000. "The impact of material coordination concepts on planning stability in supply chains," International Journal of Production Economics, Elsevier, vol. 68(2), pages 169-176, November.
  20. Narayanan, Arunachalam & Robinson, Powell, 2010. "Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems," International Journal of Production Economics, Elsevier, vol. 127(1), pages 85-94, September.
  21. Tarim, S. Armagan & Kingsman, Brian G., 2006. "Modelling and computing (Rn, Sn) policies for inventory systems with non-stationary stochastic demand," European Journal of Operational Research, Elsevier, vol. 174(1), pages 581-599, October.
  22. Sivadasan, Suja & Smart, Janet & Huaccho Huatuco, Luisa & Calinescu, Anisoara, 2013. "Reducing schedule instability by identifying and omitting complexity-adding information flows at the supplier–customer interface," International Journal of Production Economics, Elsevier, vol. 145(1), pages 253-262.
  23. Wijngaard, J., 2004. "The effect of foreknowledge of demand in case of a restricted capacity: The single-stage, single-product case," European Journal of Operational Research, Elsevier, vol. 159(1), pages 95-109, November.
  24. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
  25. Ghobbar, Adel A. & Friend, Chris H., 2004. "The material requirements planning system for aircraft maintenance and inventory control: a note," Journal of Air Transport Management, Elsevier, vol. 10(3), pages 217-221.
  26. Heisig, Gerald, 2001. "Comparison of (s,S) and (s,nQ) inventory control rules with respect to planning stability," International Journal of Production Economics, Elsevier, vol. 73(1), pages 59-82, August.
  27. Salewski, Frank, 1994. "An integrative approach to audit-staff scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 358, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  28. Clark, Alistair R., 2003. "Optimization approximations for capacity constrained material requirements planning," International Journal of Production Economics, Elsevier, vol. 84(2), pages 115-131, May.