IDEAS home Printed from https://ideas.repec.org/r/eee/transe/v126y2019icp103-121.html

An exact algorithm for integrated planning of operations in dry bulk terminals

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Liu, Baoli & Li, Zhi-Chun & Wang, Yadong, 2022. "A two-stage stochastic programming model for seaport berth and channel planning with uncertainties in ship arrival and handling times," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 167(C).
  2. Gleb Belov & Natashia L. Boland & Martin W. P. Savelsbergh & Peter J. Stuckey, 2020. "Logistics optimization for a coal supply chain," Journal of Heuristics, Springer, vol. 26(2), pages 269-300, April.
  3. Liu, Baoli & Li, Zhi-Chun & Sheng, Dian & Wang, Yadong, 2021. "Integrated planning of berth allocation and vessel sequencing in a seaport with one-way navigation channel," Transportation Research Part B: Methodological, Elsevier, vol. 143(C), pages 23-47.
  4. Gao, Zhendi & Ji, Mingjun & Liang, Jinpeng & Kong, Lingrui, 2025. "Fill rate oriented scheduling policy for integrated ore terminal order acceptance and berth allocation," Transportation Research Part B: Methodological, Elsevier, vol. 202(C).
  5. Gao, Yuan & Sun, Zhuo, 2023. "Tramp ship routing and speed optimization with tidal berth time windows," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 178(C).
  6. Guo, Zijian & Cao, Zhen & Wang, Wenyuan & Jiang, Ying & Xu, Xinglu & Feng, Peng, 2021. "An integrated model for vessel traffic and deballasting scheduling in coal export terminals," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 152(C).
  7. Liu, Baoli & Li, Zhi-Chun & Wang, Yadong, 2023. "A branch-and-price heuristic algorithm for the bunkering operation problem of a liquefied natural gas bunkering station in the inland waterways," Transportation Research Part B: Methodological, Elsevier, vol. 167(C), pages 145-170.
  8. Chen, Sumin & Zeng, Qingcheng & Li, Yantong, 2023. "Integrated operations planning in highly electrified container terminals considering time-of-use tariffs," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 171(C).
  9. Wang, Lin & Zhang, Ziqing & Wang, Sirui, 2026. "Grain drying capacity planning and scheduling under yield uncertainty: Minimizing post-harvest losses and operational costs," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 205(C).
  10. Sun, Defeng & Meng, Ying & Tang, Lixin & Liu, Jinyin & Huang, Baobin & Yang, Jiefu, 2020. "Storage space allocation problem at inland bulk material stockyard," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 134(C).
  11. Bor-Hong Lin & Hsuan-Shih Lee & Cheng-Chi Chung, 2020. "The Construction and Implication of Group Scale Efficiency Evaluation Model for Bulk Shipping Corporations," Mathematics, MDPI, vol. 8(5), pages 1-13, May.
  12. Wang, Wenyuan & Guo, Jiaqi & Tian, Qi & Peng, Yun & Cao, Zhen & Liu, Keke & Peng, Shitao, 2025. "Stockyard allocation in dry bulk ports considering resource consumption reduction of spraying operations," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 193(C).
  13. Tianhao Shao & Weijie Du & Yun Ye & Haoqing Li & Jingxin Dong & Guiyun Liu & Pengjun Zheng, 2024. "A Novel Virtual Arrival Optimization Method for Traffic Organization Scenarios," Sustainability, MDPI, vol. 16(1), pages 1-17, January.
  14. Gao, Zhendi & Ji, Mingjun & Kong, Lingrui & Hou, Xinhao, 2024. "Scheduling of automated ore terminal operations based on fixed inflow rhythm," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 182(C).
  15. Hamza Bouzekri & Gülgün Alpan & Vincent Giard, 2022. "Integrated Laycan and Berth Allocation Problem with ship stability and conveyor routing constraints in bulk ports," Working Papers hal-03431793, HAL.
  16. Bouzekri, Hamza & Bara, Najat & Alpan, Gülgün & Giard, Vincent, 2022. "An integrated Decision Support System for planning production, storage and bulk port operations in a fertilizer supply chain," International Journal of Production Economics, Elsevier, vol. 252(C).
  17. Cao, Zhen & Wang, Wenyuan & Jiang, Ying & Xu, Xinglu & Xu, Yunzhuo & Guo, Zijian, 2022. "Joint berth allocation and ship loader scheduling under the rotary loading mode in coal export terminals," Transportation Research Part B: Methodological, Elsevier, vol. 162(C), pages 229-260.
  18. Hamza Bouzekri & Gülgün Alpan & Vincent Giard, 2020. "Modélisation du problème de l'allocation des planches et des postes à quai dans les ports vraquiers," Post-Print hal-03005639, HAL.
  19. Kong, Lingrui & Ji, Mingjun & Gao, Zhendi, 2022. "An exact algorithm for scheduling tandem quay crane operations in container terminals," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 168(C).
  20. Qin, Tianbao & Du, Yuquan & Chen, Jiang Hang & Sha, Mei, 2020. "Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel," European Journal of Operational Research, Elsevier, vol. 285(3), pages 884-901.
  21. Yang, Zhiyuan & Wang, Miaomiao & Wang, Shuaian & Zhen, Lu, 2025. "Optimizing continuous-time berth allocation, time-variant quay crane and yard assignment," Transportation Research Part B: Methodological, Elsevier, vol. 200(C).
  22. Gao, Zhendi & Ji, Mingjun & Kong, Lingrui & Ji, Shengzhong & Hou, Xinhao, 2026. "Integrated scheduling for ore terminals under cargo flow uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 205(C).
  23. Mina Roohnavazfar & Seyed Hamid Reza Pasandideh, 2022. "Decomposition algorithm for the multi-trip single vehicle routing problem with AND-type precedence constraints," Operational Research, Springer, vol. 22(4), pages 4253-4285, September.
  24. Bahman Naderi & Rubén Ruiz & Vahid Roshanaei, 2023. "Mixed-Integer Programming vs. Constraint Programming for Shop Scheduling Problems: New Results and Outlook," INFORMS Journal on Computing, INFORMS, vol. 35(4), pages 817-843, July.
  25. João Luiz Marques Andrade & Gustavo Campos Menezes, 2023. "A column generation-based heuristic to solve the integrated planning, scheduling, yard allocation and berth allocation problem in bulk ports," Journal of Heuristics, Springer, vol. 29(1), pages 39-76, February.
  26. Liu, Baoli & Wang, Xincheng & Wang, Zehao & Zheng, Jianfeng & Sheng, Dian, 2025. "Modeling and solving the joint berth allocation and vessel sequencing problem with speed optimization in a busy seaport," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 197(C).
  27. Marcos Wagner Jesus Servare Junior & Helder Roberto de Oliveira Rocha & José Leandro Félix Salles & Sylvain Perron, 2020. "A Linear Relaxation-Based Heuristic for Iron Ore Stockyard Energy Planning," Energies, MDPI, vol. 13(19), pages 1-18, October.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.