IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v81y1995i1p88-104.html
   My bibliography  Save this item

Multiple and bicriteria scheduling: A literature survey

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Guner, Ertan & Erol, Serpil & Tani, Kazuo, 1998. "One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs," International Journal of Production Economics, Elsevier, vol. 55(2), pages 213-219, July.
  2. Julio Mar-Ortiz & Alex J. Ruiz Torres & Belarmino Adenso-Díaz, 2022. "Scheduling in parallel machines with two objectives: analysis of factors that influence the Pareto frontier," Operational Research, Springer, vol. 22(4), pages 4585-4605, September.
  3. Kimms, A, 1998. "Stability Measures for Rolling Schedules with Applications to Capacity Expansion Planning, Master Production Scheduling, and Lot Sizing," Omega, Elsevier, vol. 26(3), pages 355-366, June.
  4. Zeynep Adak & Mahmure Övül Arıoğlu Akan & Serol Bulkan, 0. "Multiprocessor open shop problem: literature review and future directions," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-23.
  5. Lemesre, J. & Dhaenens, C. & Talbi, E.G., 2007. "An exact parallel method for a bi-objective permutation flowshop problem," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1641-1655, March.
  6. Qi, Xiangtong & Bard, Jonathan F. & Yu, Gang, 2006. "Disruption management for machine scheduling: The case of SPT schedules," International Journal of Production Economics, Elsevier, vol. 103(1), pages 166-184, September.
  7. Koksalan, Murat & Burak Keha, Ahmet, 2003. "Using genetic algorithms for single-machine bicriteria scheduling problems," European Journal of Operational Research, Elsevier, vol. 145(3), pages 543-556, March.
  8. Mosheiov, Gur, 2005. "Minimizing total completion time and total deviation of job completion times from a restrictive due-date," European Journal of Operational Research, Elsevier, vol. 165(1), pages 20-33, August.
  9. T'kindt, V. & Billaut, J-C. & Proust, C., 2001. "Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry," European Journal of Operational Research, Elsevier, vol. 135(1), pages 42-49, November.
  10. Figueira, J.R. & Liefooghe, A. & Talbi, E.-G. & Wierzbicki, A.P., 2010. "A parallel multiple reference point approach for multi-objective optimization," European Journal of Operational Research, Elsevier, vol. 205(2), pages 390-400, September.
  11. Kimms, Alf, 1996. "Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 418, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  12. Cheng, Mingbao & Tadikamalla, Pandu R. & Shang, Jennifer & Zhang, Shaqing, 2014. "Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs," European Journal of Operational Research, Elsevier, vol. 234(3), pages 650-657.
  13. Choo Jun Tan & Siew Chin Neoh & Chee Peng Lim & Samer Hanoun & Wai Peng Wong & Chu Kong Loo & Li Zhang & Saeid Nahavandi, 2019. "Application of an evolutionary algorithm-based ensemble model to job-shop scheduling," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 879-890, February.
  14. Chen, Wei-Yang & Sheen, Gwo-Ji, 2007. "Single-machine scheduling with multiple performance measures: Minimizing job-dependent earliness and tardiness subject to the number of tardy jobs," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 214-229, September.
  15. Pongcharoen, P. & Hicks, C. & Braiden, P. M. & Stewardson, D. J., 2002. "Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products," International Journal of Production Economics, Elsevier, vol. 78(3), pages 311-322, August.
  16. Pongcharoen, P. & Hicks, C. & Braiden, P. M., 2004. "The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure," European Journal of Operational Research, Elsevier, vol. 152(1), pages 215-225, January.
  17. Wan, Guohua & Yen, Benjamin P.-C., 2009. "Single machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobs," European Journal of Operational Research, Elsevier, vol. 195(1), pages 89-97, May.
  18. Gupta, J.N.D. & Ruiz-Torres, Alex J., 2005. "Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs," European Journal of Operational Research, Elsevier, vol. 167(3), pages 679-695, December.
  19. Hicks, C., 2004. "A genetic algorithm tool for designing manufacturing facilities in the capital goods industry," International Journal of Production Economics, Elsevier, vol. 90(2), pages 199-211, July.
  20. Ganesan, Viswanath Kumar & Sivakumar, Appa Iyer, 2006. "Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times," International Journal of Production Economics, Elsevier, vol. 103(2), pages 633-647, October.
  21. M. Murat Köksalan, 1999. "A heuristic approach to bicriteria scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(7), pages 777-789, October.
  22. Haral, Uday & Chen, Rew-Win & Ferrell, William Jr & Kurz, Mary Beth, 2007. "Multiobjective single machine scheduling with nontraditional requirements," International Journal of Production Economics, Elsevier, vol. 106(2), pages 574-584, April.
  23. Zhou, Xuesong & Zhong, Ming, 2005. "Bicriteria train scheduling for high-speed passenger railroad planning applications," European Journal of Operational Research, Elsevier, vol. 167(3), pages 752-771, December.
  24. Pongcharoen, P. & Promtet, W. & Yenradee, P. & Hicks, C., 2008. "Stochastic Optimisation Timetabling Tool for university course scheduling," International Journal of Production Economics, Elsevier, vol. 112(2), pages 903-918, April.
  25. Sayin, Serpil & Karabati, Selcuk, 1999. "A bicriteria approach to the two-machine flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 113(2), pages 435-449, March.
  26. C Gagné & M Gravel & W L Price, 2005. "Using metaheuristic compromise programming for the solution of multiple-objective scheduling problems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(6), pages 687-698, June.
  27. Lin, B.M.T. & Lu, C.Y. & Shyu, S.J. & Tsai, C.Y., 2008. "Development of new features of ant colony optimization for flowshop scheduling," International Journal of Production Economics, Elsevier, vol. 112(2), pages 742-755, April.
  28. Dhaenens, C. & Lemesre, J. & Talbi, E.G., 2010. "K-PPM: A new exact method to solve multi-objective combinatorial optimization problems," European Journal of Operational Research, Elsevier, vol. 200(1), pages 45-53, January.
  29. J N D Gupta & A J Ruiz-torres & S Webster, 2003. "Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(12), pages 1263-1274, December.
  30. Gravel, Marc & Price, Wilson L. & Gagne, Caroline, 2002. "Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic," European Journal of Operational Research, Elsevier, vol. 143(1), pages 218-229, November.
  31. Sivrikaya-Serifoglu, Funda & Ulusoy, Gunduz, 1998. "A bicriteria two-machine permutation flowshop problem," European Journal of Operational Research, Elsevier, vol. 107(2), pages 414-430, June.
  32. Framinan, Jose M. & Leisten, Rainer & Ruiz-Usano, Rafael, 2002. "Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation," European Journal of Operational Research, Elsevier, vol. 141(3), pages 559-569, September.
  33. T'kindt, Vincent & Monmarche, Nicolas & Tercinet, Fabrice & Laugt, Daniel, 2002. "An Ant Colony Optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem," European Journal of Operational Research, Elsevier, vol. 142(2), pages 250-257, October.
  34. Gupta, Jatinder N. D. & Neppalli, Venkata R. & Werner, Frank, 2001. "Minimizing total flow time in a two-machine flowshop problem with minimum makespan," International Journal of Production Economics, Elsevier, vol. 69(3), pages 323-338, February.
  35. P Chen & C-C Wu & W-C Lee, 2006. "A bi-criteria two-machine flowshop scheduling problem with a learning effect," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(9), pages 1113-1125, September.
  36. Dhaenens-Flipo, Clarisse, 2001. "A bicriterion approach to deal with a constrained single-objective problem," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 93-101, December.
  37. Vitayasak, Srisatja & Pongcharoen, Pupong & Hicks, Chris, 2017. "A tool for solving stochastic dynamic facility layout problems with stochastic demand using either a Genetic Algorithm or modified Backtracking Search Algorithm," International Journal of Production Economics, Elsevier, vol. 190(C), pages 146-157.
  38. Gupta, Jatinder N. D. & Ruiz-Torres, Alex J., 2000. "Minimizing makespan subject to minimum total flow-time on identical parallel machines," European Journal of Operational Research, Elsevier, vol. 125(2), pages 370-380, September.
  39. Allesandro Agnetis & Pitu B. Mirchandani & Dario Pacciarelli & Andrea Pacifici, 2004. "Scheduling Problems with Two Competing Agents," Operations Research, INFORMS, vol. 52(2), pages 229-242, April.
  40. E. Dhouib & J. Teghem & T. Loukil, 2018. "Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic," Annals of Operations Research, Springer, vol. 267(1), pages 101-134, August.
  41. Arroyo, Jose Elias Claudio & Armentano, Vinicius Amaral, 2005. "Genetic local search for multi-objective flowshop scheduling problems," European Journal of Operational Research, Elsevier, vol. 167(3), pages 717-738, December.
  42. Zeynep Adak & Mahmure Övül Arıoğlu Akan & Serol Bulkan, 2020. "Multiprocessor open shop problem: literature review and future directions," Journal of Combinatorial Optimization, Springer, vol. 40(2), pages 547-569, August.
  43. Erenay, Fatih Safa & Sabuncuoglu, Ihsan & Toptal, Aysegül & Tiwari, Manoj Kumar, 2010. "New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs," European Journal of Operational Research, Elsevier, vol. 201(1), pages 89-98, February.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.