IDEAS home Printed from https://ideas.repec.org/p/ems/eureir/2006.html

A comparison of inventory control policies for a joint manufacturing/Remanufacturing environment with remanufacturing yield loss

Author

Listed:
  • Bayindir, Z.P.
  • Teunter, R.H.
  • Dekker, R.

Abstract

We consider a joint manufacturing / remanufacturing environment with remanufacturing yield loss. Demand and return follow independent stationary Poisson processes. Returns can be disposed off upon arrival to the system. Manufacturing and remanufacturing operations performed in the same facility at exponential rates. Yield information becomes available after remanufacturing. Demands that are not directly satisfied are lost. We investigate what inventories to consider when making production and disposal decisions, with the objective of maximizing the long-run average expected profit. Four different policies are compared that base disposal decisions on either the local (returns) inventory or the global inventory, and production decisions on either the local (serviceable) inventory or the global inventory. By modelling the system as a Markov process, expressions for the profit associated with each policy are derived. An extensive numerical study shows that it is always optimal to base disposal decisions on the local inventory and production decisions on the global inventory within the parameter sets considered. A sensitivity analysis reveals further insights.

Suggested Citation

  • Bayindir, Z.P. & Teunter, R.H. & Dekker, R., 2005. "A comparison of inventory control policies for a joint manufacturing/Remanufacturing environment with remanufacturing yield loss," Econometric Institute Research Papers EI 2005-10, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  • Handle: RePEc:ems:eureir:2006
    as

    Download full text from publisher

    File URL: https://repub.eur.nl/pub/2006/ei200510.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Ferrer, Geraldo, 2003. "Yield information and supplier responsiveness in remanufacturing operations," European Journal of Operational Research, Elsevier, vol. 149(3), pages 540-556, September.
    2. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dev, Navin K. & Shankar, Ravi & Choudhary, Alok, 2017. "Strategic design for inventory and production planning in closed-loop hybrid systems," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 345-353.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bin He & Xin Yuan & Shusheng Qian & Bing Li, 2023. "Product low‐carbon design, manufacturing, logistics, and recycling: An overview," Wiley Interdisciplinary Reviews: Energy and Environment, Wiley Blackwell, vol. 12(5), September.
    2. Romeijnders, Ward & Teunter, Ruud & van Jaarsveld, Willem, 2012. "A two-step method for forecasting spare parts demand using information on component repairs," European Journal of Operational Research, Elsevier, vol. 220(2), pages 386-393.
    3. Arts, Joachim, 2017. "A multi-item approach to repairable stocking and expediting in a fluctuating demand environment," European Journal of Operational Research, Elsevier, vol. 256(1), pages 102-115.
    4. Shuai Zhang & Kai Huang & Yufei Yuan, 2021. "Spare Parts Inventory Management: A Literature Review," Sustainability, MDPI, vol. 13(5), pages 1-23, February.
    5. K Sahyouni & R C Savaskan & M S Daskin, 2010. "The effect of lifetime buys on warranty repair operations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 790-803, May.
    6. Wei Qi & Yuli Zhang & Ningwei Zhang, 2023. "Scaling Up Electric-Vehicle Battery Swapping Services in Cities: A Joint Location and Repairable-Inventory Model," Management Science, INFORMS, vol. 69(11), pages 6855-6875, November.
    7. A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
    8. Panagiotidou, Sofia & Nenes, George & Zikopoulos, Christos & Tagaras, George, 2017. "Joint optimization of manufacturing/remanufacturing lot sizes under imperfect information on returns quality," European Journal of Operational Research, Elsevier, vol. 258(2), pages 537-551.
    9. Perez Becker, Nicole & Arts, Joachim & Reichardt, Sven & Lange, Anne, 2024. "Managing inventories of reusable containers for food take-away at a restaurant," International Journal of Production Economics, Elsevier, vol. 267(C).
    10. Tagaras, George & Zikopoulos, Christos, 2008. "Optimal location and value of timely sorting of used items in a remanufacturing supply chain with multiple collection sites," International Journal of Production Economics, Elsevier, vol. 115(2), pages 424-432, October.
    11. Toptal, Ayşegül, 2012. "Integration of shipment scheduling decisions for forward and reverse channels in a recoverable item system," International Journal of Production Economics, Elsevier, vol. 140(1), pages 129-137.
    12. Ondemir, Onder & Gupta, Surendra M., 2014. "A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system," European Journal of Operational Research, Elsevier, vol. 233(2), pages 408-419.
    13. Nenes, George & Panagiotidou, Sofia & Dekker, Rommert, 2010. "Inventory control policies for inspection and remanufacturing of returns: A case study," International Journal of Production Economics, Elsevier, vol. 125(2), pages 300-312, June.
    14. Juan Pedro Sepúlveda-Rojas & Rodrigo Ternero, 2020. "Analysis of the Value of Information and Coordination in a Dyadic Closed Loop Supply Chain," Sustainability, MDPI, vol. 12(20), pages 1-18, October.
    15. van Ooijen, Henny & Bertrand, J. Will M. & Buyukkaramikli, Nasuh C., 2019. "Coordinating failed goods collecting and repair capacity policies in the maintenance of commoditized capital goods," International Journal of Production Economics, Elsevier, vol. 208(C), pages 29-42.
    16. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
    17. D Louit & R Pascual & D Banjevic & A K S Jardine, 2011. "Optimization models for critical spare parts inventories—a reliability approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 992-1004, June.
    18. Qiang, Qiang & Ke, Ke & Anderson, Trisha & Dong, June, 2013. "The closed-loop supply chain network with competition, distribution channel investment, and uncertainties," Omega, Elsevier, vol. 41(2), pages 186-194.
    19. Gregory A. DeCroix, 2006. "Optimal Policy for a Multiechelon Inventory System with Remanufacturing," Operations Research, INFORMS, vol. 54(3), pages 532-543, June.
    20. BayIndIr, Z. Pelin & Dekker, Rommert & Porras, Eric, 2006. "Determination of recovery effort for a probabilistic recovery system under various inventory control policies," Omega, Elsevier, vol. 34(6), pages 571-584, December.

    More about this item

    Keywords

    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ems:eureir:2006. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: RePub The email address of this maintainer does not seem to be valid anymore. Please ask RePub to update the entry or send us the correct address (email available below). General contact details of provider: https://edirc.repec.org/data/feeurnl.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.