IDEAS home Printed from https://ideas.repec.org/a/vrs/otamic/v15y2023i1p213-220n9.html
   My bibliography  Save this article

Effective pre-qualification systems – Are they essential for minimising delays on road projects?

Author

Listed:
  • Kapote Mangesh

    (Faculty of Engineering, School of Civil Engineering, Dr. Vishwanath Karad, MIT World Peace University, Pune, Maharashtra, India)

  • Patil Pratik
  • Pimplikar Sunil

    (School of Civil Engineering, Dr. Vishwanath Karad, MIT World Peace University, Pune, Maharashtra, India)

Abstract

The most significant and pivotal advance in each construction project is to choose the right contractor which is normally done by a pre-qualification system. Pre-qualification of contractor is a course of gathering data and evaluation that decides the contractor’s capacity as far as considering assets accessible, management processes and execution information. However, the current prequalification system witnesses many limitations such as contractor selection (CS) based on L1 bidder concept which may compromise with time, cost and quality of project; non-usage of a quantified mathematical model or software for selection of most competent contractor might as well compromise the system. The objective of this paper was to highlight the need of strengthening the existing pre-qualification system used in Indian roads and highway projects. To achieve the above stated objective of the research, the project-specific data were collected from 25 different road and highway projects. The analysis of the collected data showed that there was negative impact in terms of time and cost requirements, which was observed in all the projects even if the contractor was selected using the prequalification system. The main reasons identified for the delays and cost overruns were land acquisition issues, suspension of work during monsoon season and maintenance work of bitumen refineries, claims and disputes between contractor and clients, inefficiency of contractors while dealing with scope change, etc.

Suggested Citation

  • Kapote Mangesh & Patil Pratik & Pimplikar Sunil, 2023. "Effective pre-qualification systems – Are they essential for minimising delays on road projects?," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 213-220, January.
  • Handle: RePEc:vrs:otamic:v:15:y:2023:i:1:p:213-220:n:9
    DOI: 10.2478/otmcj-2023-0015
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/otmcj-2023-0015
    Download Restriction: no

    File URL: https://libkey.io/10.2478/otmcj-2023-0015?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Zedan Hatush & Martin Skitmore, 1997. "Criteria for contractor selection," Construction Management and Economics, Taylor & Francis Journals, vol. 15(1), pages 19-38.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Abdul Rahman & Yazan Alzubi, 2015. "Exploring Key Contractor Factors Influencing Client Satisfaction Level in Dealing with Construction Project: an Empirical Study in Jordan," International Journal of Academic Research in Business and Social Sciences, Human Resource Management Academic Research Society, International Journal of Academic Research in Business and Social Sciences, vol. 5(12), pages 109-126, December.
    2. Zydrune Morkunaite & Romualdas Bausys & Edmundas Kazimieras Zavadskas, 2019. "Contractor Selection for Sgraffito Decoration of Cultural Heritage Buildings Using the WASPAS-SVNS Method," Sustainability, MDPI, vol. 11(22), pages 1-25, November.
    3. Hassan Hashemi & Seyed Meysam Mousavi & Edmundas Kazimieras Zavadskas & Alireza Chalekaee & Zenonas Turskis, 2018. "A New Group Decision Model Based on Grey-Intuitionistic Fuzzy-ELECTRE and VIKOR for Contractor Assessment Problem," Sustainability, MDPI, vol. 10(5), pages 1-19, May.
    4. Amirhosein Jafari, 2013. "A contractor pre-qualification model based on the quality function deployment method," Construction Management and Economics, Taylor & Francis Journals, vol. 31(7), pages 746-760, July.
    5. J P Pastor-Ferrando & P Aragonés-Beltrán & A Hospitaler-Pérez & M García-Melón, 2010. "An ANP- and AHP-based approach for weighting criteria in public works bidding," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 905-916, June.
    6. Yi Zhang, 2020. "Construction of Bid Evaluation Index System in Government Public Project Green Procurement in China Based on D-S Evidence Theory," Sustainability, MDPI, vol. 12(2), pages 1-15, January.
    7. Rota, Cosimo & Zanasi, Cesare, 2011. "Sustainable Relations in International Development Cooperation Projects: The Role of Organizational Climate," International Journal on Food System Dynamics, International Center for Management, Communication, and Research, vol. 2(1), pages 1-15, September.
    8. Bana e Costa, Carlos A. & Lourenço, João C. & Chagas, Manuel P. & Bana e Costa, João C., 2007. "Development of reusable bid evaluation models for the Portugese Electric Transmission Company," LSE Research Online Documents on Economics 22697, London School of Economics and Political Science, LSE Library.
    9. Fredrik Waara, 2008. "Mitigating contractual hazards in public procurement: a study of Swedish local authorities," Construction Management and Economics, Taylor & Francis Journals, vol. 26(2), pages 137-145.
    10. Aziz Naghizadeh Vardin & Ramin Ansari & Mohammad Khalilzadeh & Jurgita Antucheviciene & Romualdas Bausys, 2021. "An Integrated Decision Support Model Based on BWM and Fuzzy-VIKOR Techniques for Contractor Selection in Construction Projects," Sustainability, MDPI, vol. 13(12), pages 1-28, June.
    11. Hany Abd Elshakour Mohamed & Ahmed Ibrahim Eltohamy, 2022. "Critical Success Factors for Competitiveness of Egyptian Construction Companies," Sustainability, MDPI, vol. 14(17), pages 1-22, August.
    12. Akinkunmi Olutayo Gabriel & Aghimien Douglas Omoregie & Awodele Oluwaseyi Alabi, 2018. "Appraising the use of labour-only procurement system for building construction in Nigeria," Organization, Technology and Management in Construction, Sciendo, vol. 10(1), pages 1719-1726, May.
    13. Andove Wilson Mwangu & Mike Amuhaya Iravo, 2015. "How Monitoring and Evaluation Affects the Outcome of Constituency Development Fund Projects in Kenya: A Case Study of Projects in Gatanga Constituency," International Journal of Academic Research in Business and Social Sciences, Human Resource Management Academic Research Society, International Journal of Academic Research in Business and Social Sciences, vol. 5(3), pages 13-31, March.
    14. Paul Jackson & Nancy Richter, 2017. "Situational Logic: An Analysis Of Open Innovation Using Corporate Accelerators," International Journal of Innovation Management (ijim), World Scientific Publishing Co. Pte. Ltd., vol. 21(07), pages 1-21, October.
    15. Beata GAVUROVA & Andrea TKACOVA & David TUCEK, 2017. "Determinants of Public Fund´s Savings Formation via Public Procurement Process," REVISTA ADMINISTRATIE SI MANAGEMENT PUBLIC, Faculty of Administration and Public Management, Academy of Economic Studies, Bucharest, Romania, vol. 2017(28), pages 25-44, June.
    16. Nadeera Abdul Razak & Obuks Ejohwomu & Peter Fenn & Kamil Okedara & Babatunde Dosumu & Firdaus Muhammad-Sukki, 2021. "Identification of Health and Safety Prequalification Criteria for Contractor Selection in Construction Projects: A Systematic Review," Energies, MDPI, vol. 14(21), pages 1-17, November.
    17. Cheaitou, Ali & Larbi, Rim & Al Housani, Bashayer, 2019. "Decision making framework for tender evaluation and contractor selection in public organizations with risk considerations," Socio-Economic Planning Sciences, Elsevier, vol. 68(C).
    18. Carlos A. Bana e Costa & João C. Lourenço & Manuel P. Chagas & João C. Bana e Costa, 2008. "Development of Reusable Bid Evaluation Models for the Portuguese Electric Transmission Company," Decision Analysis, INFORMS, vol. 5(1), pages 22-42, March.
    19. Bingsheng Liu & Tengfei Huo & Pinchao Liao & Jie Gong & Bin Xue, 2015. "A Group Decision-Making Aggregation Model for Contractor Selection in Large Scale Construction Projects Based on Two-Stage Partial Least Squares (PLS) Path Modeling," Group Decision and Negotiation, Springer, vol. 24(5), pages 855-883, September.
    20. Murali Jagannathan & Venkata Santosh Kumar Delhi, 2020. "Perceptions of Stakeholders on the ‘Redraftability’ of Construction Contracts," IIM Kozhikode Society & Management Review, , vol. 9(2), pages 152-161, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:15:y:2023:i:1:p:213-220:n:9. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.