IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v68y2017i12d10.1057_s41274-016-0172-5.html
   My bibliography  Save this article

Stochastic inventory system with lead time flexibility: offered by a manufacturer/transporter

Author

Listed:
  • Metin Çakanyildirim

    (The University of Texas at Dallas)

  • Sirong Luo

    (Shanghai University of Finance and Economics)

Abstract

This paper studies lead time flexibility in a two-stage continuous review supply chain in which the retailer uses the (R, Q) inventory system: when his inventory position reaches R, the retailer places orders with size Q to the manufacturer, who uses a transportation provider to deliver them with different lead time options. According to the contract, the manufacturer is able to expedite or postpone the delivery if the retailer makes such a request. Hence, the retailer has the flexibility to modify the lead time by using the most up-to-date demand information. The optimal lead time policy is found to be a threshold-type policy. The sensitivity analysis also shows that R is much more sensitive to the change of lead time than Q, and thus, the paper is primarily focused on finding optimal R. We also provide a cost approximation which yields unimodal cost in R. Furthermore, we analyze the order crossing problem and derive an upper bound for the probability of order crossing. Finally, we conduct an extensive sensitivity analysis to illustrate the effects of lead time flexibility on supply chain performance and discuss the managerial insights.

Suggested Citation

  • Metin Çakanyildirim & Sirong Luo, 2017. "Stochastic inventory system with lead time flexibility: offered by a manufacturer/transporter," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(12), pages 1533-1552, December.
  • Handle: RePEc:pal:jorsoc:v:68:y:2017:i:12:d:10.1057_s41274-016-0172-5
    DOI: 10.1057/s41274-016-0172-5
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/s41274-016-0172-5
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/s41274-016-0172-5?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Dawn Barnes-Schuster & Yehuda Bassok & Ravi Anupindi, 2002. "Coordination and Flexibility in Supply Contracts with Options," Manufacturing & Service Operations Management, INFORMS, vol. 4(3), pages 171-207, May.
    2. Suresh P. Sethi & Houmin Yan & Hanqin Zhang, 2003. "Inventory Models with Fixed Costs, Forecast Updates, and Two Delivery Modes," Operations Research, INFORMS, vol. 51(2), pages 321-328, April.
    3. Andy A. Tsay, 1999. "The Quantity Flexibility Contract and Supplier-Customer Incentives," Management Science, INFORMS, vol. 45(10), pages 1339-1358, October.
    4. Duran, Alfonso & Gutierrez, Gil & Zequeira, Romulo I., 2004. "A continuous review inventory model with order expediting," International Journal of Production Economics, Elsevier, vol. 87(2), pages 157-169, January.
    5. George Tagaras & Dimitrios Vlachos, 2001. "A Periodic Review Inventory System with Emergency Replenishments," Management Science, INFORMS, vol. 47(3), pages 415-429, March.
    6. Aditya Jain & Harry Groenevelt & Nils Rudi, 2010. "Continuous Review Inventory Model with Dynamic Choice of Two Freight Modes with Fixed Costs," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 120-139, August.
    7. Glock, C. H. & Ries, J. M., 2013. "Reducing lead-time risk through multiple sourcing: the case of stochastic demand and variable lead-time (angenommen)," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57810, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    8. Tang, Christopher & Tomlin, Brian, 2008. "The power of flexibility for mitigating supply chain risks," International Journal of Production Economics, Elsevier, vol. 116(1), pages 12-27, November.
    9. Serfozo, Richard & Stidham, Shaler, 1978. "Semi-stationary clearing processes," Stochastic Processes and their Applications, Elsevier, vol. 6(2), pages 165-178, January.
    10. Disney, Stephen M. & Maltz, Arnold & Wang, Xun & Warburton, Roger D.H., 2016. "Inventory management for stochastic lead times with order crossovers," European Journal of Operational Research, Elsevier, vol. 248(2), pages 473-486.
    11. Barry Alan Pasternack, 1985. "Optimal Pricing and Return Policies for Perishable Commodities," Marketing Science, INFORMS, vol. 4(2), pages 166-176.
    12. Marcello Braglia & Davide Castellano & Marco Frosolini, 2016. "A novel approach to safety stock management in a coordinated supply chain with controllable lead time using present value," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 32(1), pages 99-112, January.
    13. Yu-Sheng Zheng, 1992. "On Properties of Stochastic Inventory Systems," Management Science, INFORMS, vol. 38(1), pages 87-103, January.
    14. Lawrence W. Robinson & James R. Bradley & L. Joseph Thomas, 2001. "Consequences of Order Crossover Under Order-Up-To Inventory Policies," Manufacturing & Service Operations Management, INFORMS, vol. 3(3), pages 175-188, September.
    15. Yoichiro Fukuda, 1964. "Optimal Policies for the Inventory Problem with Negotiable Leadtime," Management Science, INFORMS, vol. 10(4), pages 690-708, July.
    16. Kamran Moinzadeh & Steven Nahmias, 1988. "A Continuous Review Model for an Inventory System with Two Supply Modes," Management Science, INFORMS, vol. 34(6), pages 761-773, June.
    17. Paul Zipkin, 1986. "Inventory Service-Level Measures: Convexity and Approximation," Management Science, INFORMS, vol. 32(8), pages 975-981, August.
    18. Merschmann, Ulf & Thonemann, Ulrich W., 2011. "Supply chain flexibility, uncertainty and firm performance: An empirical analysis of German manufacturing firms," International Journal of Production Economics, Elsevier, vol. 130(1), pages 43-53, March.
    19. Jing-Sheng Song, 1994. "The Effect of Leadtime Uncertainty in a Simple Stochastic Inventory Model," Management Science, INFORMS, vol. 40(5), pages 603-613, May.
    20. Eric Logan Huggins & Tava Lennon Olsen, 2003. "Supply Chain Management with Guaranteed Delivery," Management Science, INFORMS, vol. 49(9), pages 1154-1167, September.
    21. David G. Lawson & Evan L. Porteus, 2000. "Multistage Inventory Management with Expediting," Operations Research, INFORMS, vol. 48(6), pages 878-893, December.
    22. Kumar Muthuraman & Sridhar Seshadri & Qi Wu, 2015. "Inventory Management with Stochastic Lead Times," Mathematics of Operations Research, INFORMS, vol. 40(2), pages 302-327, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Anh Chi Phan & Ha Thu Nguyen & Hao Anh Nguyen & Yoshiki Matsui, 2019. "Effect of Total Quality Management Practices and JIT Production Practices on Flexibility Performance: Empirical Evidence from International Manufacturing Plants," Sustainability, MDPI, vol. 11(11), pages 1-21, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
    2. Aditya Jain & Harry Groenevelt & Nils Rudi, 2010. "Continuous Review Inventory Model with Dynamic Choice of Two Freight Modes with Fixed Costs," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 120-139, August.
    3. Xu, Ningxiong, 2008. "Myopic policy for a two-product and multi-period supply contract with different delivery lead times and storage limitation," International Journal of Production Economics, Elsevier, vol. 115(1), pages 179-188, September.
    4. Anshul Sheopuri & Ganesh Janakiraman & Sridhar Seshadri, 2010. "New Policies for the Stochastic Inventory Control Problem with Two Supply Sources," Operations Research, INFORMS, vol. 58(3), pages 734-745, June.
    5. Höller, Simon J. & Özsen, Raik & Thonemann, Ulrich W., 2020. "Determining optimal parameters for expediting policies under service level constraints," European Journal of Operational Research, Elsevier, vol. 281(2), pages 274-285.
    6. Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
    7. Sean X. Zhou & Chaolin Yang, 2016. "Continuous-Review ( R, nQ ) Policies for Inventory Systems with Dual Delivery Modes," Operations Research, INFORMS, vol. 64(6), pages 1302-1319, December.
    8. Uday S. Rao, 2003. "Properties of the Periodic Review (R, T) Inventory Control Policy for Stationary, Stochastic Demand," Manufacturing & Service Operations Management, INFORMS, vol. 5(1), pages 37-53, February.
    9. Brian Tomlin, 2006. "On the Value of Mitigation and Contingency Strategies for Managing Supply Chain Disruption Risks," Management Science, INFORMS, vol. 52(5), pages 639-657, May.
    10. Raik Özsen & Ulrich W. Thonemann, 2015. "Determining Optimal Parameters for Expediting Policies," Manufacturing & Service Operations Management, INFORMS, vol. 17(1), pages 120-133, February.
    11. Boulaksil, Youssef & Hamdouch, Younes & Ghoudi, Kilani & Fransoo, Jan C., 2021. "Comparing policies for the stochastic multi-period dual sourcing problem from a supply chain perspective," Other publications TiSEM 242598b9-99de-4a3c-a1a9-4, Tilburg University, School of Economics and Management.
    12. Boulaksil, Youssef & Hamdouch, Younes & Ghoudi, Kilani & Fransoo, Jan C., 2021. "Comparing policies for the stochastic multi-period dual sourcing problem from a supply chain perspective," International Journal of Production Economics, Elsevier, vol. 232(C).
    13. Cheaitou, Ali & Cheaytou, Rima, 2019. "A two-stage capacity reservation supply contract with risky supplier and forecast updating," International Journal of Production Economics, Elsevier, vol. 209(C), pages 42-60.
    14. Chand, Suresh & Li, Jian & Xu, Yanyi, 2016. "A periodic review inventory model with two delivery modes, fractional lead-times, and age-and-period-dependent backlogging costs," International Journal of Production Economics, Elsevier, vol. 173(C), pages 199-206.
    15. Eric Logan Huggins & Tava Lennon Olsen, 2010. "Inventory Control with Generalized Expediting," Operations Research, INFORMS, vol. 58(5), pages 1414-1426, October.
    16. Achin Srivastav & Sunil Agrawal, 2020. "On a single item single stage mixture inventory models with independent stochastic lead times," Operational Research, Springer, vol. 20(4), pages 2189-2227, December.
    17. Senthil Veeraraghavan & Alan Scheller-Wolf, 2008. "Now or Later: A Simple Policy for Effective Dual Sourcing in Capacitated Systems," Operations Research, INFORMS, vol. 56(4), pages 850-864, August.
    18. Ankur Goel & Genaro J. Gutierrez, 2011. "Multiechelon Procurement and Distribution Policies for Traded Commodities," Management Science, INFORMS, vol. 57(12), pages 2228-2244, December.
    19. Jing-Sheng Song & Li Xiao & Hanqin Zhang & Paul Zipkin, 2017. "Optimal Policies for a Dual-Sourcing Inventory Problem with Endogenous Stochastic Lead Times," Operations Research, INFORMS, vol. 65(2), pages 379-395, April.
    20. Cheaitou, Ali & van Delft, Christian & Jemai, Zied & Dallery, Yves, 2014. "Optimal policy structure characterization for a two-period dual-sourcing inventory control model with forecast updating," International Journal of Production Economics, Elsevier, vol. 157(C), pages 238-249.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:68:y:2017:i:12:d:10.1057_s41274-016-0172-5. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.