IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v60y2009i5d10.1057_palgrave.jors.2602593.html
   My bibliography  Save this article

Periodic control of intermittent demand items: theory and empirical analysis

Author

Listed:
  • A A Syntetos

    (University of Salford)

  • M Z Babai

    (University of Salford)

  • Y Dallery

    (Ecole Centrale Paris)

  • R Teunter

    (Lancaster University)

Abstract

In this paper we propose a modification to the standard forecasting, periodic order-up-to-level inventory control approach to dealing with intermittent demand items, when the lead-time length is shorter than the average inter-demand interval. In particular, we develop an approach that relies upon the employment of separate estimates of the inter-demand intervals and demand sizes, when demand occurs, directly for stock control purposes rather than first estimating mean demand and then feeding the results in the stock control procedure. The empirical performance of our approach is assessed by means of analysis on a large demand data set from the Royal Air Force (RAF, UK). Our work allows insights to be gained on the interactions between forecasting and stock control as well as on demand categorization-related issues for forecasting and inventory management purposes.

Suggested Citation

  • A A Syntetos & M Z Babai & Y Dallery & R Teunter, 2009. "Periodic control of intermittent demand items: theory and empirical analysis," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(5), pages 611-618, May.
  • Handle: RePEc:pal:jorsoc:v:60:y:2009:i:5:d:10.1057_palgrave.jors.2602593
    DOI: 10.1057/palgrave.jors.2602593
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2602593
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2602593?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. A A Syntetos & J E Boylan & J D Croston, 2005. "On the categorization of demand patterns," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 495-503, May.
    2. John Boylan & Aris Syntetos, 2006. "Accuracy and Accuracy Implication Metrics for Intermittent Demand," Foresight: The International Journal of Applied Forecasting, International Institute of Forecasters, issue 4, pages 39-42, June.
    3. F R Johnston & J E Boylan & E A Shale, 2003. "An examination of the size of orders from customers, their characterisation and the implications for inventory control of slow moving items," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(8), pages 833-837, August.
    4. Segerstedt, Anders, 1994. "Inventory control with variation in lead times, especially when demand is intermittent," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 365-372, June.
    5. Everette S. Gardner, 1990. "Evaluating Forecast Performance in an Inventory Control System," Management Science, INFORMS, vol. 36(4), pages 490-499, April.
    6. Syntetos, A. A. & Boylan, J. E., 2001. "On the bias of intermittent demand estimates," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 457-466, May.
    7. Strijbosch, L.W.G. & Moors, J.J.A. & de Kok, A.G., 1997. "On the interaction between forecasting and inventory control," Other publications TiSEM f641fa4a-dd3e-4433-b0ea-9, Tilburg University, School of Economics and Management.
    8. Ghobbar, A.A & Friend, C.H, 2002. "Sources of intermittent demand for aircraft spare parts within airline operations," Journal of Air Transport Management, Elsevier, vol. 8(4), pages 221-231.
    9. E A Shale & J E Boylan & F R Johnston, 2006. "Forecasting for intermittent demand: the estimation of an unbiased average," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(5), pages 588-592, May.
    10. J. B. Ward, 1978. "Determining Reorder Points When Demand is Lumpy," Management Science, INFORMS, vol. 24(6), pages 623-632, February.
    11. Gutierrez, Rafael S. & Solis, Adriano O. & Mukhopadhyay, Somnath, 2008. "Lumpy demand forecasting using neural networks," International Journal of Production Economics, Elsevier, vol. 111(2), pages 409-420, February.
    12. Syntetos, Aris A. & Boylan, John E., 2005. "The accuracy of intermittent demand estimates," International Journal of Forecasting, Elsevier, vol. 21(2), pages 303-314.
    13. J E Boylan & A A Syntetos & G C Karakostas, 2008. "Classification for forecasting and stock control: a case study," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(4), pages 473-481, April.
    14. Syntetos, Aris A. & Boylan, John E., 2006. "On the stock control performance of intermittent demand estimators," International Journal of Production Economics, Elsevier, vol. 103(1), pages 36-47, September.
    15. Willemain, Thomas R. & Smart, Charles N. & Shockor, Joseph H. & DeSautels, Philip A., 1994. "Forecasting intermittent demand in manufacturing: a comparative evaluation of Croston's method," International Journal of Forecasting, Elsevier, vol. 10(4), pages 529-538, December.
    16. R Fildes & K Nikolopoulos & S F Crone & A A Syntetos, 2008. "Forecasting and operational research: a review," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(9), pages 1150-1172, September.
    17. A H C Eaves & B G Kingsman, 2004. "Forecasting for the ordering and stock-holding of spare parts," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(4), pages 431-437, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. K Nikolopoulos & A A Syntetos & J E Boylan & F Petropoulos & V Assimakopoulos, 2011. "An aggregate–disaggregate intermittent demand approach (ADIDA) to forecasting: an empirical proposition and analysis," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(3), pages 544-554, March.
    2. Van der Auweraer, Sarah & Zhu, Sha & Boute, Robert N., 2021. "The value of installed base information for spare part inventory control," International Journal of Production Economics, Elsevier, vol. 239(C).
    3. Chia-Nan Wang & Thanh-Tuan Dang & Ngoc-Ai-Thy Nguyen, 2020. "A Computational Model for Determining Levels of Factors in Inventory Management Using Response Surface Methodology," Mathematics, MDPI, vol. 8(8), pages 1-23, July.
    4. Syntetos, A.A. & Teunter, R.H. & Babai, M.Z. & Transchel, S., 2016. "On the benefits of delayed ordering," European Journal of Operational Research, Elsevier, vol. 248(3), pages 963-970.
    5. Kamal Sanguri & Kampan Mukherjee, 2021. "Forecasting of intermittent demands under the risk of inventory obsolescence," Journal of Forecasting, John Wiley & Sons, Ltd., vol. 40(6), pages 1054-1069, September.
    6. Teunter, Ruud H. & Syntetos, Aris A. & Zied Babai, M., 2011. "Intermittent demand: Linking forecasting to inventory obsolescence," European Journal of Operational Research, Elsevier, vol. 214(3), pages 606-615, November.
    7. Kourentzes, Nikolaos & Athanasopoulos, George, 2021. "Elucidate structure in intermittent demand series," European Journal of Operational Research, Elsevier, vol. 288(1), pages 141-152.
    8. Pennings, Clint L.P. & van Dalen, Jan & van der Laan, Erwin A., 2017. "Exploiting elapsed time for managing intermittent demand for spare parts," European Journal of Operational Research, Elsevier, vol. 258(3), pages 958-969.
    9. Prak, Derk & Teunter, Rudolf & Babai, M. Z. & Syntetos, A. A. & Boylan, D, 2018. "Forecasting and Inventory Control with Compound Poisson Demand Using Periodic Demand Data," Research Report 2018010, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    10. Altay, Nezih & Litteral, Lewis A. & Rudisill, Frank, 2012. "Effects of correlation on intermittent demand forecasting and stock control," International Journal of Production Economics, Elsevier, vol. 135(1), pages 275-283.
    11. Bacchetti, A. & Plebani, F. & Saccani, N. & Syntetos, A.A., 2013. "Empirically-driven hierarchical classification of stock keeping units," International Journal of Production Economics, Elsevier, vol. 143(2), pages 263-274.
    12. Schlaich, Tim & Hoberg, Kai, 2024. "When is the next order? Nowcasting channel inventories with Point-of-Sales data to predict the timing of retail orders," European Journal of Operational Research, Elsevier, vol. 315(1), pages 35-49.
    13. Babai, M.Z. & Jemai, Z. & Dallery, Y., 2011. "Analysis of order-up-to-level inventory systems with compound Poisson demand," European Journal of Operational Research, Elsevier, vol. 210(3), pages 552-558, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Pennings, Clint L.P. & van Dalen, Jan & van der Laan, Erwin A., 2017. "Exploiting elapsed time for managing intermittent demand for spare parts," European Journal of Operational Research, Elsevier, vol. 258(3), pages 958-969.
    2. R Fildes & K Nikolopoulos & S F Crone & A A Syntetos, 2008. "Forecasting and operational research: a review," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(9), pages 1150-1172, September.
    3. Bacchetti, Andrea & Saccani, Nicola, 2012. "Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice," Omega, Elsevier, vol. 40(6), pages 722-737.
    4. Petropoulos, Fotios & Apiletti, Daniele & Assimakopoulos, Vassilios & Babai, Mohamed Zied & Barrow, Devon K. & Ben Taieb, Souhaib & Bergmeir, Christoph & Bessa, Ricardo J. & Bijak, Jakub & Boylan, Joh, 2022. "Forecasting: theory and practice," International Journal of Forecasting, Elsevier, vol. 38(3), pages 705-871.
      • Fotios Petropoulos & Daniele Apiletti & Vassilios Assimakopoulos & Mohamed Zied Babai & Devon K. Barrow & Souhaib Ben Taieb & Christoph Bergmeir & Ricardo J. Bessa & Jakub Bijak & John E. Boylan & Jet, 2020. "Forecasting: theory and practice," Papers 2012.03854, arXiv.org, revised Jan 2022.
    5. Teunter, Ruud H. & Syntetos, Aris A. & Zied Babai, M., 2011. "Intermittent demand: Linking forecasting to inventory obsolescence," European Journal of Operational Research, Elsevier, vol. 214(3), pages 606-615, November.
    6. Kourentzes, Nikolaos, 2013. "Intermittent demand forecasts with neural networks," International Journal of Production Economics, Elsevier, vol. 143(1), pages 198-206.
    7. Pinçe, Çerağ & Turrini, Laura & Meissner, Joern, 2021. "Intermittent demand forecasting for spare parts: A Critical review," Omega, Elsevier, vol. 105(C).
    8. Babai, Zied & Boylan, John E. & Kolassa, Stephan & Nikolopoulos, Konstantinos, 2016. "Supply chain forecasting: Theory, practice, their gap and the futureAuthor-Name: Syntetos, Aris A," European Journal of Operational Research, Elsevier, vol. 252(1), pages 1-26.
    9. Syntetos, Aris A. & Zied Babai, M. & Gardner, Everette S., 2015. "Forecasting intermittent inventory demands: simple parametric methods vs. bootstrapping," Journal of Business Research, Elsevier, vol. 68(8), pages 1746-1752.
    10. Pierre Dodin & Jingyi Xiao & Yossiri Adulyasak & Neda Etebari Alamdari & Lea Gauthier & Philippe Grangier & Paul Lemaitre & William L. Hamilton, 2023. "Bombardier Aftermarket Demand Forecast with Machine Learning," Interfaces, INFORMS, vol. 53(6), pages 425-445, November.
    11. Kourentzes, Nikolaos, 2014. "On intermittent demand model optimisation and selection," International Journal of Production Economics, Elsevier, vol. 156(C), pages 180-190.
    12. Prak, Derk & Teunter, Rudolf & Babai, M. Z. & Syntetos, A. A. & Boylan, D, 2018. "Forecasting and Inventory Control with Compound Poisson Demand Using Periodic Demand Data," Research Report 2018010, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    13. Boylan, J.E. & Syntetos, A.A., 2007. "The accuracy of a Modified Croston procedure," International Journal of Production Economics, Elsevier, vol. 107(2), pages 511-517, June.
    14. Altay, Nezih & Rudisill, Frank & Litteral, Lewis A., 2008. "Adapting Wright's modification of Holt's method to forecasting intermittent demand," International Journal of Production Economics, Elsevier, vol. 111(2), pages 389-408, February.
    15. A A Syntetos & J E Boylan & S M Disney, 2009. "Forecasting for inventory planning: a 50-year review," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 149-160, May.
    16. Babai, M. Zied & Ali, Mohammad M. & Nikolopoulos, Konstantinos, 2012. "Impact of temporal aggregation on stock control performance of intermittent demand estimators: Empirical analysis," Omega, Elsevier, vol. 40(6), pages 713-721.
    17. Jože Martin Rožanec & Blaž Fortuna & Dunja Mladenić, 2022. "Reframing Demand Forecasting: A Two-Fold Approach for Lumpy and Intermittent Demand," Sustainability, MDPI, vol. 14(15), pages 1-21, July.
    18. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    19. Evangelos Spiliotis & Spyros Makridakis & Artemios-Anargyros Semenoglou & Vassilios Assimakopoulos, 2022. "Comparison of statistical and machine learning methods for daily SKU demand forecasting," Operational Research, Springer, vol. 22(3), pages 3037-3061, July.
    20. Ali Caner Türkmen & Tim Januschowski & Yuyang Wang & Ali Taylan Cemgil, 2021. "Forecasting intermittent and sparse time series: A unified probabilistic framework via deep renewal processes," PLOS ONE, Public Library of Science, vol. 16(11), pages 1-26, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:60:y:2009:i:5:d:10.1057_palgrave.jors.2602593. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.