Due-date assignment with asymmetric earliness–tardiness cost

Author

Listed:
  • G Mosheiov

    (The Hebrew University)

Abstract

The problem of minimizing the maximal weighted absolute lateness (MWAL) is known to be NP-hard. The due-date assignment part of MWAL for a given sequence has been shown in the literature to be solved on a single machine in O(n 2) time. In this paper, we study a more general version of the problem with asymmetric cost (nonidentical earliness and tardiness weights). We introduce a linear-programming-based O(n) solution for this case. We also extend our proposed solution procedure to other machine settings such as flow-shop and parallel machines.

Suggested Citation

  • G Mosheiov, 2003. "Due-date assignment with asymmetric earliness–tardiness cost," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(11), pages 1222-1224, November.
  • Handle: RePEc:pal:jorsoc:v:54:y:2003:i:11:d:10.1057_palgrave.jors.2601624
    DOI: 10.1057/palgrave.jors.2601624
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2601624
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2601624?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. R-H Huang & C-L Yang & H-T Huang, 2010. "Parallel machine scheduling with common due windows," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(4), pages 640-646, April.
    2. Dvir Shabtay, 2023. "A new perspective on single-machine scheduling problems with late work related criteria," Annals of Operations Research, Springer, vol. 322(2), pages 947-966, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lei Pan & Xinyu Sun & Ji-Bo Wang & Li-Han Zhang & Dan-Yang Lv, 2023. "Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs," Journal of Combinatorial Optimization, Springer, vol. 45(4), pages 1-16, May.
    2. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    3. Huynh Tuong, Nguyen & Soukhal, Ameur & Billaut, Jean-Charles, 2010. "A new dynamic programming formulation for scheduling independent tasks with common due date on parallel machines," European Journal of Operational Research, Elsevier, vol. 202(3), pages 646-653, May.
    4. Chuang Wang & Pingyu Jiang, 2019. "Deep neural networks based order completion time prediction by using real-time job shop RFID data," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1303-1318, March.
    5. Altendorfer, Klaus & Minner, Stefan, 2015. "Influence of order acceptance policies on optimal capacity investment with stochastic customer required lead times," European Journal of Operational Research, Elsevier, vol. 243(2), pages 555-565.
    6. Lemos, R.F. & Ronconi, D.P., 2015. "Heuristics for the stochastic single-machine problem with E/T costs," International Journal of Production Economics, Elsevier, vol. 168(C), pages 131-142.
    7. Shi Chen & Hau Lee, 2017. "Incentive Alignment and Coordination of Project Supply Chains," Management Science, INFORMS, vol. 63(4), pages 1011-1025, April.
    8. Leyvand, Yaron & Shabtay, Dvir & Steiner, George, 2010. "A unified approach for scheduling with convex resource consumption functions using positional penalties," European Journal of Operational Research, Elsevier, vol. 206(2), pages 301-312, October.
    9. Sourd, Francis, 2005. "Punctuality and idleness in just-in-time scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 739-751, December.
    10. Feng Li & Zhi-Long Chen & Zhi-Long Chen, 2017. "Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms," INFORMS Journal on Computing, INFORMS, vol. 29(2), pages 232-250, May.
    11. Lin, Shih-Wei & Chou, Shuo-Yan & Ying, Kuo-Ching, 2007. "A sequential exchange approach for minimizing earliness-tardiness penalties of single-machine scheduling with a common due date," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1294-1301, March.
    12. Shabtay, Dvir & Mosheiov, Gur & Oron, Daniel, 2022. "Single machine scheduling with common assignable due date/due window to minimize total weighted early and late work," European Journal of Operational Research, Elsevier, vol. 303(1), pages 66-77.
    13. Mor, Baruch & Mosheiov, Gur, 2016. "Minsum and minmax scheduling on a proportionate flowshop with common flow-allowance," European Journal of Operational Research, Elsevier, vol. 254(2), pages 360-370.
    14. Hui Zhu & Min Li & Zhangjin Zhou & Yun You, 2016. "Due-window assignment and scheduling with general position-dependent processing times involving a deteriorating and compressible maintenance activity," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3475-3490, June.
    15. Plateau, M.-C. & Rios-Solis, Y.A., 2010. "Optimal solutions for unrelated parallel machines scheduling problems using convex quadratic reformulations," European Journal of Operational Research, Elsevier, vol. 201(3), pages 729-736, March.
    16. Huynh Tuong, Nguyen & Soukhal, Ameur, 2010. "Due dates assignment and JIT scheduling with equal-size jobs," European Journal of Operational Research, Elsevier, vol. 205(2), pages 280-289, September.
    17. Rasti-Barzoki, Morteza & Hejazi, Seyed Reza, 2013. "Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains," European Journal of Operational Research, Elsevier, vol. 228(2), pages 345-357.
    18. Baruch Mor & Gur Mosheiov, 2021. "Minmax due-date assignment on a two-machine flowshop," Annals of Operations Research, Springer, vol. 305(1), pages 191-209, October.
    19. M. Vanhoucke, 2002. "Optimal Due Date Assignment In Project Scheduling," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 02/159, Ghent University, Faculty of Economics and Business Administration.
    20. Valls, Vicente & Pérez, Ángeles & Quintanilla, Sacramento, 2009. "Skilled workforce scheduling in Service Centres," European Journal of Operational Research, Elsevier, vol. 193(3), pages 791-804, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:54:y:2003:i:11:d:10.1057_palgrave.jors.2601624. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.