IDEAS home Printed from https://ideas.repec.org/a/gam/jeners/v18y2025i12p3190-d1681428.html
   My bibliography  Save this article

Simulation Studies of Biomass Transport in a Power Plant with Regard to Environmental Constraints

Author

Listed:
  • Andrzej Jastrząb

    (Enea Power Plant Połaniec S.A., Zawada 26, 28-230 Połaniec, Poland)

  • Witold Kawalec

    (Department of Mining, Faculty of Geoengineering, Mining and Geology, Wroclaw University of Science and Technology, 50-370 Wrocław, Poland)

  • Zbigniew Krysa

    (Department of Mining, Faculty of Geoengineering, Mining and Geology, Wroclaw University of Science and Technology, 50-370 Wrocław, Poland)

  • Paweł Szczeszek

    (Doctoral School, Silesian University of Technology, 44-100 Gliwice, Poland)

Abstract

The “carbon neutral power generation” policy of the European Union requires the phasing out of fossil fuel power plants. These plants still play a crucial role in the energy mix in many countries; therefore, efforts are put forward to lower their CO 2 emissions. The available solution for an existing coal plant is the implementation of biomass co-firing, which allows it to reduce twice its carbon footprint in order to achieve the level of natural gas plants, which are preferable on the way to zero-emission power generation. However the side effect is a significant increase in the bulk fuel volumes that are acquired, handled, and finally supplied to the power plant units. A necessary extension of the complex logistic system for unloading, quality tagging, storing, and transporting biomass may increase the plant’s noise emissions beyond the allowed thresholds. For a comprehensive assessment of the concept of expanding the power plant’s biofuel supply system (BSS), a discrete simulation model was built to dimension system elements and verify the overall correctness of the proposed solutions. Then, a dedicated noise emission model was built for the purposes of mandatory environmental impact assessment procedures for the planned expansion of the BSS. The noise model showed the possibility of exceeding the permissible noise levels at night in selected locations. The new simulations of the BSS model were used to analyze various scenarios of biomass supply with regard to alternative switching off the selected branches of the whole BSS. The length of the queue of unloaded freight trains delivering an average quality biomass after a period of 2 weeks is used as a key performance parameter of the BSS. A queue shorter than 1 freight train is accepted. Assuming the rising share of RESS in the Polish energy mix, the thermal plant’s 2-week average power output shall not exceed 70% of its maximum capacity. The results of the simulations indicate that under these constraints, the biofuel supplies can be sufficient regardless of the nighttime stops, if 50% of the supplied biomass volumes are delivered by trucks. If the trucks’ share drops to 25%, the plant’s 2-week average power output is limited to 45% of its maximum power. The use of digital spatial simulation models for a complex, cyclical-continuous transport system to control its operation is an effective method of addressing environmental conflicts at the design stage of the extension of industrial installations in urbanized areas.

Suggested Citation

  • Andrzej Jastrząb & Witold Kawalec & Zbigniew Krysa & Paweł Szczeszek, 2025. "Simulation Studies of Biomass Transport in a Power Plant with Regard to Environmental Constraints," Energies, MDPI, vol. 18(12), pages 1-18, June.
  • Handle: RePEc:gam:jeners:v:18:y:2025:i:12:p:3190-:d:1681428
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/18/12/3190/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/18/12/3190/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:18:y:2025:i:12:p:3190-:d:1681428. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.