The maintenance strategy in railway transportation is crucial in ensuring safety, availability, and reducing operating costs. However, finding the optimal maintenance plan that takes into account the complex relationships between railway assets can be a challenging task. To address this challenge, this study introduces an Intelligent Petri Net (iPN) model to effectively consider the maintenance and operation of railway sections with a focus on optimizing ballast maintenance. The iPN model merges Petri net (PN) with Reinforcement Learning (RL) to create a model that is able to simulate and learn at the same time. The model is able to use diverse information, including usage, degradation rates, maintenance effectiveness, fault probabilities, and maintenance time, to simulate and learn at the same time. By considering the interconnections between these factors, the model found that reducing unnecessary maintenance actions increases the age of railway sections and leads to higher net profits. The study also introduced a method to reduce computational effort by dividing the PN into subnets and another method to make learning faster by using multiple RL environments. In conclusion, the developed iPN model presents a promising solution for optimizing ballast maintenance within railway operation.

Suggested Citation

  • Saleh, Ali & Remenyte-Prescott, Rasa & Prescott, Darren & Chiachío, Manuel, 2024. "Intelligent and adaptive asset management model for railway sections using the iPN method," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
  • Handle: RePEc:eee:reensy:v:241:y:2024:i:c:s0951832023006014
    DOI: 10.1016/j.ress.2023.109687
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832023006014
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2023.109687?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Arash Bakhtiary & Jabbar Ali Zakeri & Saeed Mohammadzadeh, 2021. "An opportunistic preventive maintenance policy for tamping scheduling of railway tracks," International Journal of Rail Transportation, Taylor & Francis Journals, vol. 9(1), pages 1-22, January.
    2. G Budai & D Huisman & R Dekker, 2006. "Scheduling preventive railway maintenance activities," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(9), pages 1035-1044, September.
    3. Alice Consilvio & Angela Febbraro & Rossella Meo & Nicola Sacco, 2019. "Risk-based optimal scheduling of maintenance activities in a railway network," EURO Journal on Transportation and Logistics, Springer;EURO - The Association of European Operational Research Societies, vol. 8(5), pages 435-465, December.
    4. Zhang, Chuntian & Gao, Yuan & Yang, Lixing & Gao, Ziyou & Qi, Jianguo, 2020. "Joint optimization of train scheduling and maintenance planning in a railway network: A heuristic algorithm using Lagrangian relaxation," Transportation Research Part B: Methodological, Elsevier, vol. 134(C), pages 64-92.
    5. Andrews, John & Prescott, Darren & De Rozières, Florian, 2014. "A stochastic model for railway track asset management," Reliability Engineering and System Safety, Elsevier, vol. 130(C), pages 76-84.
    6. Chiachío, Manuel & Saleh, Ali & Naybour, Susannah & Chiachío, Juan & Andrews, John, 2022. "Reduction of Petri net maintenance modeling complexity via Approximate Bayesian Computation," Reliability Engineering and System Safety, Elsevier, vol. 222(C).
    7. Sedghi, Mahdieh & Kauppila, Osmo & Bergquist, Bjarne & Vanhatalo, Erik & Kulahci, Murat, 2021. "A taxonomy of railway track maintenance planning and scheduling: A review and research trends," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    8. Bressi, Sara & Santos, João & Losa, Massimo, 2021. "Optimization of maintenance strategies for railway track-bed considering probabilistic degradation models and different reliability levels," Reliability Engineering and System Safety, Elsevier, vol. 207(C).
    9. J Zhao & A H C Chan & M P N Burrow, 2007. "Reliability analysis and maintenance decision for railway sleepers using track condition information," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(8), pages 1047-1055, August.
    10. Podofillini, Luca & Zio, Enrico & Vatn, Jørn, 2006. "Risk-informed optimisation of railway tracks inspection and maintenance procedures," Reliability Engineering and System Safety, Elsevier, vol. 91(1), pages 20-35.
    11. Shafiee, Mahmood & Sørensen, John Dalsgaard, 2019. "Maintenance optimization and inspection planning of wind energy assets: Models, methods and strategies," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
    12. Sasidharan, M. & Burrow, M.P.N. & Ghataora, G.S., 2020. "A whole life cycle approach under uncertainty for economically justifiable ballasted railway track maintenance," Research in Transportation Economics, Elsevier, vol. 80(C).
    13. Chiachío, Juan & Chiachío, Manuel & Prescott, Darren & Andrews, John, 2019. "A knowledge-based prognostics framework for railway track geometry degradation," Reliability Engineering and System Safety, Elsevier, vol. 181(C), pages 127-141.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sedghi, Mahdieh & Kauppila, Osmo & Bergquist, Bjarne & Vanhatalo, Erik & Kulahci, Murat, 2021. "A taxonomy of railway track maintenance planning and scheduling: A review and research trends," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    2. Fecarotti, Claudia & Andrews, John & Pesenti, Raffaele, 2021. "A mathematical programming model to select maintenance strategies in railway networks," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
    3. Zhang, Huimin & Li, Shukai & Wang, Yihui & Yang, Lixing & Gao, Ziyou, 2021. "Collaborative real-time optimization strategy for train rescheduling and track emergency maintenance of high-speed railway: A Lagrangian relaxation-based decomposition algorithm," Omega, Elsevier, vol. 102(C).
    4. Chahrour, Nour & Nasr, Mohamad & Tacnet, Jean-Marc & Bérenguer, Christophe, 2021. "Deterioration modeling and maintenance assessment using physics-informed stochastic Petri nets: Application to torrent protection structures," Reliability Engineering and System Safety, Elsevier, vol. 210(C).
    5. Andrews, John & Tolo, Silvia, 2023. "Dynamic and dependent tree theory (D2T2): A framework for the analysis of fault trees with dependent basic events," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
    6. Alice Consilvio & José Solís-Hernández & Noemi Jiménez-Redondo & Paolo Sanetti & Federico Papa & Iñigo Mingolarra-Garaizar, 2020. "On Applying Machine Learning and Simulative Approaches to Railway Asset Management: The Earthworks and Track Circuits Case Studies," Sustainability, MDPI, vol. 12(6), pages 1-24, March.
    7. Cavalcante, Cristiano A.V. & Lopes, Rodrigo S. & Scarf, Philip A., 2021. "Inspection and replacement policy with a fixed periodic schedule," Reliability Engineering and System Safety, Elsevier, vol. 208(C).
    8. Hui Shang & Christophe Bérenguer & John Andrews, 2017. "Delayed maintenance modelling considering speed restriction for a railway section," Journal of Risk and Reliability, , vol. 231(4), pages 411-428, August.
    9. Lee, Jun S. & Yeo, In-Ho & Bae, Younghoon, 2024. "A stochastic track maintenance scheduling model based on deep reinforcement learning approaches," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    10. Liu, Xinyang & Zheng, Zhuoyuan & Büyüktahtakın, İ. Esra & Zhou, Zhi & Wang, Pingfeng, 2021. "Battery asset management with cycle life prognosis," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
    11. Alice Consilvio & Angela Febbraro & Rossella Meo & Nicola Sacco, 2019. "Risk-based optimal scheduling of maintenance activities in a railway network," EURO Journal on Transportation and Logistics, Springer;EURO - The Association of European Operational Research Societies, vol. 8(5), pages 435-465, December.
    12. Ruiz Muñoz, G.A. & Sørensen, J.D., 2020. "Probabilistic inspection planning of offshore welds subject to the transition from protected to corrosive environment," Reliability Engineering and System Safety, Elsevier, vol. 202(C).
    13. Izquierdo, J. & Márquez, A. Crespo & Uribetxebarria, J. & Erguido, A., 2020. "On the importance of assessing the operational context impact on maintenance management for life cycle cost of wind energy projects," Renewable Energy, Elsevier, vol. 153(C), pages 1100-1110.
    14. Wang, Anqi & Pei, Yan & Qian, Zheng & Zareipour, Hamidreza & Jing, Bo & An, Jiayi, 2022. "A two-stage anomaly decomposition scheme based on multi-variable correlation extraction for wind turbine fault detection and identification," Applied Energy, Elsevier, vol. 321(C).
    15. Macchi, Marco & Garetti, Marco & Centrone, Domenico & Fumagalli, Luca & Piero Pavirani, Gian, 2012. "Maintenance management of railway infrastructures based on reliability analysis," Reliability Engineering and System Safety, Elsevier, vol. 104(C), pages 71-83.
    16. Yang, Li & Ma, Xiaobing & Peng, Rui & Zhai, Qingqing & Zhao, Yu, 2017. "A preventive maintenance policy based on dependent two-stage deterioration and external shocks," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 201-211.
    17. Caputo, Antonio C. & Federici, Alessandro & Pelagagge, Pacifico M. & Salini, Paolo, 2023. "Offshore wind power system economic evaluation framework under aleatory and epistemic uncertainty," Applied Energy, Elsevier, vol. 350(C).
    18. Tobi Elusakin & Mahmood Shafiee & Tosin Adedipe & Fateme Dinmohammadi, 2021. "A Stochastic Petri Net Model for O&M Planning of Floating Offshore Wind Turbines," Energies, MDPI, vol. 14(4), pages 1-18, February.
    19. Ait-Ali , Abderrahman & Odolinski, Kristofer & Pålsson, Björn & Torstensson, Peter, 2023. "Evaluating the mix of maintenance activities on railway crossings with respect to life-cycle costs," Working Papers 2023:6, Swedish National Road & Transport Research Institute (VTI).
    20. Wang, Dapeng & Qiu, Haobo & Gao, Liang & Jiang, Chen, 2021. "A single-loop Kriging coupled with subset simulation for time-dependent reliability analysis," Reliability Engineering and System Safety, Elsevier, vol. 216(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:241:y:2024:i:c:s0951832023006014. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.