IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v170y2018icp1-9.html
   My bibliography  Save this article

Optimization of periodic preventive maintenance policy following the expiration of two-dimensional warranty

Author

Listed:
  • Park, Minjae
  • Jung, Ki Mun
  • Park, Dong Ho

Abstract

This paper considers an optimal periodic preventive maintenance policy after the expiration of two-dimensional warranty. During the two-dimensional warranty period, both renewal warranty and nonrenewal warranty are considered and a repair time threshold is pre-specified so that the failed system is either minimally repaired or is replaced depending on whether the length of repair time exceeds the repair time threshold or not. After the warranty expires, the system undergoes the preventive maintenance periodically a fixed number of times by the user to prolong the life of the system and then the system is replaced preventively by a new one. In this study, we develop an optimal post-warranty periodic preventive maintenance strategy by minimizing the expected cost rate incurred during the life cycle of the system. From the user's perspective, the system is maintained free of charge or with prorated charge on the failed system during the warranty period. Once the warranty expires, the maintenance cost of the system is entirely charged to the user. Subject to such a cost structure, we derive the formula to evaluate the expected cost rate, which is used as an objective function for the optimality. The main goal of this paper is to determine an optimal preventive maintenance cycle after the warranty expires and thus to propose an optimal post-warranty strategy for the user. The effect of several parameters on the optimal strategy is also investigated numerically in this study. For the purpose of illustration of our proposed model, we present and discuss some numerical examples.

Suggested Citation

  • Park, Minjae & Jung, Ki Mun & Park, Dong Ho, 2018. "Optimization of periodic preventive maintenance policy following the expiration of two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 1-9.
  • Handle: RePEc:eee:reensy:v:170:y:2018:i:c:p:1-9
    DOI: 10.1016/j.ress.2017.10.009
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832017305823
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2017.10.009?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Huang, Yeu-Shiang & Huang, Chao-Da & Ho, Jyh-Wen, 2017. "A customized two-dimensional extended warranty with preventive maintenance," European Journal of Operational Research, Elsevier, vol. 257(3), pages 971-978.
    2. Su, Chun & Wang, Xiaolin, 2016. "A two-stage preventive maintenance optimization model incorporating two-dimensional extended warranty," Reliability Engineering and System Safety, Elsevier, vol. 155(C), pages 169-178.
    3. Park, Minjae & Mun Jung, Ki & Park, Dong Ho, 2013. "Optimal post-warranty maintenance policy with repair time threshold for minimal repair," Reliability Engineering and System Safety, Elsevier, vol. 111(C), pages 147-153.
    4. Wang, Yukun & Liu, Zixian & Liu, Yiliu, 2015. "Optimal preventive maintenance strategy for repairable items under two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 142(C), pages 326-333.
    5. Wang, Jinting & Zhou, Zhuang & Peng, Hao, 2017. "Flexible decision models for a two-dimensional warranty policy with periodic preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 162(C), pages 14-27.
    6. Jung, M. & Bai, D.S., 2007. "Analysis of field data under two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 92(2), pages 135-143.
    7. Huang, Yeu-Shiang & Gau, Wei-Yo & Ho, Jyh-Wen, 2015. "Cost analysis of two-dimensional warranty for products with periodic preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 134(C), pages 51-58.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhu, Xiaoyan & Jiao, Can & Yuan, Tao, 2019. "Optimal decisions on product reliability, sales and promotion under nonrenewable warranties," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
    2. Mitra, Amitava, 2021. "Warranty parameters for extended two-dimensional warranties incorporating consumer preferences," European Journal of Operational Research, Elsevier, vol. 291(2), pages 525-535.
    3. Karar, Ahmed Noaman & Labib, Ashraf & Jones, Dylan, 2023. "Post-warranty maintenance strategy selection using shape packages process," International Journal of Production Economics, Elsevier, vol. 255(C).
    4. Shang, Lijun & Liu, Baoliang & Qiu, Qingan & Yang, Li & Du, Yongjun, 2023. "Designing warranty and maintenance policies for products subject to random working cycles," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
    5. Ágota Bányai, 2021. "Energy Consumption-Based Maintenance Policy Optimization," Energies, MDPI, vol. 14(18), pages 1-33, September.
    6. Mateusz Oszczypała & Jarosław Ziółkowski & Jerzy Małachowski, 2023. "Modelling the Operation Process of Light Utility Vehicles in Transport Systems Using Monte Carlo Simulation and Semi-Markov Approach," Energies, MDPI, vol. 16(5), pages 1-31, February.
    7. Lijun Shang & Guojun Shang & Yongjun Du & Qingan Qiu & Li Yang & Qinglai Dong, 2022. "Post-Warranty Replacement Models for the Product under a Hybrid Warranty," Mathematics, MDPI, vol. 10(10), pages 1-18, May.
    8. Wang, Yukun & Liu, Yiliu & Li, Xiaopeng & Chen, Junyan, 2019. "Multi-phase reliability growth test planning for repairable products sold with a two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 315-326.
    9. Yongjun Du & Lijun Shang & Qingan Qiu & Li Yang, 2022. "Optimum Post-Warranty Maintenance Policies for Products with Random Working Cycles," Mathematics, MDPI, vol. 10(10), pages 1-16, May.
    10. Lin, Boliang & Wu, Jianping & Lin, Ruixi & Wang, Jiaxi & Wang, Hui & Zhang, Xuhui, 2019. "Optimization of high-level preventive maintenance scheduling for high-speed trains," Reliability Engineering and System Safety, Elsevier, vol. 183(C), pages 261-275.
    11. Peng, Shizhe & Jiang, Wei & Wei, Lai & Wang, Xiao-Lin, 2022. "A new cost-sharing preventive maintenance program under two-dimensional warranty," International Journal of Production Economics, Elsevier, vol. 254(C).
    12. Hooti, Fatemeh & Ahmadi, Jafar & Longobardi, Maria, 2020. "Optimal extended warranty length with limited number of repairs in the warranty period," Reliability Engineering and System Safety, Elsevier, vol. 203(C).
    13. Safaei, Fatemeh & Taghipour, Sharareh, 2022. "Optimal preventive maintenance for repairable products with three types of failures sold under a renewable hybrid FRW/PRW policy," Reliability Engineering and System Safety, Elsevier, vol. 223(C).
    14. Lin, Boliang & Zhao, Yinan, 2021. "Synchronized optimization of EMU train assignment and second-level preventive maintenance scheduling," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    15. Liu, Peng & Wang, Guanjun & Su, Peng, 2021. "Optimal maintenance strategies for warranty products with limited repair time and limited repair number," Reliability Engineering and System Safety, Elsevier, vol. 210(C).
    16. Juhyun Lee & Byunghoon Kim & Suneung Ahn, 2019. "Maintenance Optimization for Repairable Deteriorating Systems under Imperfect Preventive Maintenance," Mathematics, MDPI, vol. 7(8), pages 1-17, August.
    17. de Jonge, Bram & Scarf, Philip A., 2020. "A review on maintenance optimization," European Journal of Operational Research, Elsevier, vol. 285(3), pages 805-824.
    18. Yukun Wang & Yiliu Liu & Aibo Zhang, 2019. "Preventive maintenance optimization for repairable products considering two-dimensional warranty and customer satisfaction," Journal of Risk and Reliability, , vol. 233(4), pages 553-566, August.
    19. Zhang, Fengxia & Shen, Jingyuan & Ma, Yizhong, 2020. "Optimal maintenance policy considering imperfect repairs and non-constant probabilities of inspection errors," Reliability Engineering and System Safety, Elsevier, vol. 193(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Xiaolin Wang & Wei Xie, 2018. "Two-dimensional warranty: A literature review," Journal of Risk and Reliability, , vol. 232(3), pages 284-307, June.
    2. Yukun Wang & Yiliu Liu & Aibo Zhang, 2019. "Preventive maintenance optimization for repairable products considering two-dimensional warranty and customer satisfaction," Journal of Risk and Reliability, , vol. 233(4), pages 553-566, August.
    3. Gupta, Sanjib Kumar & Bhattacharya, Debasis, 2022. "Non-parametric estimation of bivariate reliability from incomplete two-dimensional warranty data," Reliability Engineering and System Safety, Elsevier, vol. 222(C).
    4. Wang, Yukun & Liu, Yiliu & Liu, Zixian & Li, Xiaopeng, 2017. "On reliability improvement program for second-hand products sold with a two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 167(C), pages 452-463.
    5. Peng, Shizhe & Jiang, Wei & Wei, Lai & Wang, Xiao-Lin, 2022. "A new cost-sharing preventive maintenance program under two-dimensional warranty," International Journal of Production Economics, Elsevier, vol. 254(C).
    6. Peng, Shizhe & Jiang, Wei & Huang, Wenpo & Luo, Qinglin, 2024. "The impact of gamma usage processes on preventive maintenance policies under two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 242(C).
    7. Anshu Dai & Guanzhou Wei & Zhaomin Zhang & Shuguang He, 2020. "Design of a flexible preventive maintenance strategy for two-dimensional warranted products," Journal of Risk and Reliability, , vol. 234(1), pages 74-87, February.
    8. Lijun Shang & Guojun Shang & Qingan Qiu, 2022. "A Bivariate Post-Warranty Maintenance Model for the Product under a 2D Warranty," Mathematics, MDPI, vol. 10(12), pages 1-18, June.
    9. Wu, Shaomin, 2024. "A copula-based approach to modelling the failure process of items under two-dimensional warranty and applications," European Journal of Operational Research, Elsevier, vol. 314(3), pages 854-866.
    10. Wang, Xiaolin & Li, Lishuai & Xie, Min, 2020. "An unpunctual preventive maintenance policy under two-dimensional warranty," European Journal of Operational Research, Elsevier, vol. 282(1), pages 304-318.
    11. Zhu, Ying & Xia, Tangbin & Chen, Zhen & Pan, Ershun & Xi, Lifeng, 2022. "Optimal maintenance service strategy for OEM entering competitive MRO market under opposite patterns," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
    12. Safaei, Fatemeh & Taghipour, Sharareh, 2022. "Optimal preventive maintenance for repairable products with three types of failures sold under a renewable hybrid FRW/PRW policy," Reliability Engineering and System Safety, Elsevier, vol. 223(C).
    13. Wei Xie, 2017. "Optimal pricing and two-dimensional warranty policies for a new product," International Journal of Production Research, Taylor & Francis Journals, vol. 55(22), pages 6857-6870, November.
    14. Kumar Gupta, Sanjib & De, Soumen & Chatterjee, Aditya, 2017. "Some reliability issues for incomplete two-dimensional warranty claims data," Reliability Engineering and System Safety, Elsevier, vol. 157(C), pages 64-77.
    15. Huang, Yeu-Shiang & Ho, Jyh-Wen & Hung, Jin-Wei & Tseng, Tzu-Liang (Bill), 2021. "A customized warranty model by considering multi-usage levels for the leasing industry," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    16. Wang, Xiaolin & Zhao, Xiujie & Liu, Bin, 2020. "Design and pricing of extended warranty menus based on the multinomial logit choice model," European Journal of Operational Research, Elsevier, vol. 287(1), pages 237-250.
    17. Chun Su & Longfei Cheng, 2019. "Two-dimensional preventive maintenance optimum for equipment sold with availability-based warranty," Journal of Risk and Reliability, , vol. 233(4), pages 648-657, August.
    18. Liu, Peng & Wang, Guanjun & Su, Peng, 2021. "Optimal maintenance strategies for warranty products with limited repair time and limited repair number," Reliability Engineering and System Safety, Elsevier, vol. 210(C).
    19. Liu, Bin & Shen, Lijuan & Xu, Jianyu & Zhao, Xiujie, 2020. "A complimentary extended warranty: Profit analysis and pricing strategy," International Journal of Production Economics, Elsevier, vol. 229(C).
    20. Lijun Shang & Guojun Shang & Yongjun Du & Qingan Qiu & Li Yang & Qinglai Dong, 2022. "Post-Warranty Replacement Models for the Product under a Hybrid Warranty," Mathematics, MDPI, vol. 10(10), pages 1-18, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:170:y:2018:i:c:p:1-9. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.