IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v96y2005i2p263-272.html
   My bibliography  Save this article

A linearization approach for inventory models with variable lead time

Author

Listed:
  • Chang, Ching-Ter

Abstract

No abstract is available for this item.

Suggested Citation

  • Chang, Ching-Ter, 2005. "A linearization approach for inventory models with variable lead time," International Journal of Production Economics, Elsevier, vol. 96(2), pages 263-272, May.
  • Handle: RePEc:eee:proeco:v:96:y:2005:i:2:p:263-272
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(04)00159-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chang, Ching-Ter, 2000. "An efficient linearization approach for mixed-integer problems," European Journal of Operational Research, Elsevier, vol. 123(3), pages 652-659, June.
    2. Li, Han-Lin & Yu, Chian-Son, 1999. "A global optimization method for nonconvex separable programming problems," European Journal of Operational Research, Elsevier, vol. 117(2), pages 275-292, September.
    3. Hariga, Moncer & Ben-Daya, Mohamed, 1999. "Some stochastic inventory models with deterministic variable lead time," European Journal of Operational Research, Elsevier, vol. 113(1), pages 42-51, February.
    4. J C-H Pan & Y-C Hsiao & C-J Lee, 2002. "Inventory models with fixed and variable lead time crash costs considerations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(9), pages 1048-1053, September.
    5. Meir J. Rosenblatt & Yale T. Herer & Ilan Hefter, 1998. "Note. An Acquisition Policy for a Single Item Multi-Supplier System," Management Science, INFORMS, vol. 44(11-Part-2), pages 96-100, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
    2. Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
    3. Chang, Ching-Ter & Chiou, Chei-Chang & Liao, Yi-Shin & Chang, Shu-Chin, 2008. "An exact policy for enhancing buyer-supplier linkage in supply chain system," International Journal of Production Economics, Elsevier, vol. 113(1), pages 470-479, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
    2. Tsai, Jung-Fa, 2007. "An optimization approach for supply chain management models with quantity discount policy," European Journal of Operational Research, Elsevier, vol. 177(2), pages 982-994, March.
    3. Chang, Ching-Ter, 2002. "On the posynomial fractional programming problems," European Journal of Operational Research, Elsevier, vol. 143(1), pages 42-52, November.
    4. Chang, Hung-Chi & Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2006. "Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction," European Journal of Operational Research, Elsevier, vol. 170(2), pages 481-495, April.
    5. Ventura, José A. & Bunn, Kevin A. & Venegas, Bárbara B. & Duan, Lisha, 2021. "A coordination mechanism for supplier selection and order quantity allocation with price-sensitive demand and finite production rates," International Journal of Production Economics, Elsevier, vol. 233(C).
    6. Zhang, Jianzhong & Xu, Chengxian, 2010. "Inverse optimization for linearly constrained convex separable programming problems," European Journal of Operational Research, Elsevier, vol. 200(3), pages 671-679, February.
    7. Qi, Xiangtong, 2007. "Order splitting with multiple capacitated suppliers," European Journal of Operational Research, Elsevier, vol. 178(2), pages 421-432, April.
    8. Lee, Jun-Yeon & Schwarz, Leroy B., 2009. "Leadtime management in a periodic-review inventory system: A state-dependent base-stock policy," European Journal of Operational Research, Elsevier, vol. 199(1), pages 122-129, November.
    9. Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
    10. Bianchessi, N. & Mansini, R. & Speranza, M.G., 2014. "The distance constrained multiple vehicle traveling purchaser problem," European Journal of Operational Research, Elsevier, vol. 235(1), pages 73-87.
    11. Chang, Ching-Ter, 2001. "On the polynomial mixed 0-1 fractional programming problems," European Journal of Operational Research, Elsevier, vol. 131(1), pages 224-227, May.
    12. Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
    13. Hsien-Jen Lin, 2015. "A stochastic periodic review inventory model with back-order discounts and ordering cost dependent on lead time for the mixtures of distributions," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 386-400, July.
    14. Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
    15. Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
    16. Woo, Hong Seng & Saghiri, Soroosh, 2011. "Order assignment considering buyer, third-party logistics provider, and suppliers," International Journal of Production Economics, Elsevier, vol. 130(2), pages 144-152, April.
    17. Babazadeh, Reza & Razmi, Jafar & Pishvaee, Mir Saman & Rabbani, Masoud, 2017. "A sustainable second-generation biodiesel supply chain network design problem under risk," Omega, Elsevier, vol. 66(PB), pages 258-277.
    18. Adeinat, Hamza & Ventura, José A., 2015. "Determining the retailer's replenishment policy considering multiple capacitated suppliers and price-sensitive demand," European Journal of Operational Research, Elsevier, vol. 247(1), pages 83-92.
    19. Yue, Jinfeng & Wang, Min-Chiang & Chen, Bintong, 2007. "Mean-range based distribution-free procedures to minimize "overage" and "underage" costs," European Journal of Operational Research, Elsevier, vol. 176(2), pages 1103-1116, January.
    20. Sina Abbasi & Ilias Vlachos & Shabnam Rekabi & Mohammad Talooni, 2023. "Designing the Distribution Network of Essential Items in the Critical Conditions of Earthquakes and COVID-19 Simultaneously," Sustainability, MDPI, vol. 15(22), pages 1-23, November.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:96:y:2005:i:2:p:263-272. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.