IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v56-57y1998i1p587-599.html
   My bibliography  Save this article

The development of a method for determining the efficiency and effectiveness of installed CAPM systems

Author

Listed:
  • Sitoh, P. J.
  • Braiden, P. M.
  • Simmons, J. E. L.

Abstract

No abstract is available for this item.

Suggested Citation

  • Sitoh, P. J. & Braiden, P. M. & Simmons, J. E. L., 1998. "The development of a method for determining the efficiency and effectiveness of installed CAPM systems," International Journal of Production Economics, Elsevier, vol. 56(1), pages 587-599, September.
  • Handle: RePEc:eee:proeco:v:56-57:y:1998:i:1:p:587-599
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(98)00071-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
    2. Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
    3. repec:dgr:rugsom:02a72 is not listed on IDEAS
    4. Carravilla, Maria Antonia & de Sousa, Jorge Pinho, 1995. "Hierarchical production planning in a make-to-order company: A case study," European Journal of Operational Research, Elsevier, vol. 86(1), pages 43-56, October.
    5. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
    6. Dellaert, N. P. & Melo, M. T., 1996. "Production strategies for a stochastic lot-sizing problem with constant capacity," European Journal of Operational Research, Elsevier, vol. 92(2), pages 281-301, July.
    7. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    8. Helia Yousefnejad & Maryam Esmaeili, 2020. "Tactical production planning in a hybrid MTS/MTO system using Stackelberg game," Operational Research, Springer, vol. 20(3), pages 1791-1809, September.
    9. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    10. Dellaert, N. P. & Melo, M. T., 1996. "Stochastic lot-sizing: Solution and heuristic methods," International Journal of Production Economics, Elsevier, vol. 46(1), pages 261-276, December.
    11. Haskose, A. & Kingsman, B. G. & Worthington, D, 2004. "Performance analysis of make-to-order manufacturing systems under different workload control regimes," International Journal of Production Economics, Elsevier, vol. 90(2), pages 169-186, July.
    12. Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.
    13. Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
    14. Weng, Z. Kevin, 1996. "Manufacturing lead times, system utilization rates and lead-time-related demand," European Journal of Operational Research, Elsevier, vol. 89(2), pages 259-268, March.
    15. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2004. "Exploring applicability of the workload control concept," International Journal of Production Economics, Elsevier, vol. 90(2), pages 187-198, July.
    16. Watanapa, Bunthit & Techanitisawad, Anulark, 2005. "Simultaneous price and due date settings for multiple customer classes," European Journal of Operational Research, Elsevier, vol. 166(2), pages 351-368, October.
    17. Hendry, L. & Land, M. & Stevenson, M. & Gaalman, G., 2008. "Investigating implementation issues for workload control (WLC): A comparative case study analysis," International Journal of Production Economics, Elsevier, vol. 112(1), pages 452-469, March.
    18. Dellaert, N. P. & Melo, M. T., 1998. "Make-to-order policies for a stochastic lot-sizing problem using overtime," International Journal of Production Economics, Elsevier, vol. 56(1), pages 79-97, September.
    19. Calosso, T. & Cantamessa, M. & Vu, Dang & Villa, A., 2003. "Production planning and order acceptance in business to business electronic commerce," International Journal of Production Economics, Elsevier, vol. 85(2), pages 233-249, August.
    20. repec:dgr:rugsom:95a42 is not listed on IDEAS
    21. Luo Renfei & Huang Jiedan & Lee Jimmy & Pun Philip, 2018. "A Case Study of Supply Chain Management in a Manufacturing Company in China," Nang Yan Business Journal, Sciendo, vol. 6(1), pages 1-20, June.
    22. Haskose, A. & Kingsman, B. G. & Worthington, D., 2002. "Modelling flow and jobbing shops as a queueing network for workload control," International Journal of Production Economics, Elsevier, vol. 78(3), pages 271-285, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:56-57:y:1998:i:1:p:587-599. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.