IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v239y2021ics092552732100178x.html
   My bibliography  Save this article

On the relationship between lean scheduling and economic performance in shipbuilding: A proposed model and comparative evaluation

Author

Listed:
  • Shahsavar, Aria
  • Sadeghi, J. Kiarash
  • Shockley, Jeff
  • Ojha, Divesh

Abstract

Few studies have examined shipbuilding production processes from a lean scheduling perspective, a production scheduling approach where the primary focus is on minimizing key sources of production waste while ensuring production continuity and on-time delivery. Specifically, this research develops a lean scheduling approach and analytical model for shipbuilding production processes that minimize two specific types of production waste - excessive overproduction and waiting time - critical to the economic viability and management of projects in this industry. From a lean practice-based view (PBV) perspective of the production scheduling nuances in shipbuilding, we develop and numerically apply a lean scheduling model that targets these specific sources of waste and predicts the performance improvement gains. The applicability of the proposed scheduling approach for shipbuilding production is demonstrated through a corresponding numerical and sensitivity analysis where we compare the proposed model's performance with two alternative Makespan scheduling approaches commonly used in shipbuilding practice. Exact optimization results show a significant reduction in both forms of wastes using our proposed lean scheduling approach, leading to a remarkable boost in shipbuilding cost performance over the more traditional Makespan-minimizing scheduling approaches commonly used in this industry.

Suggested Citation

  • Shahsavar, Aria & Sadeghi, J. Kiarash & Shockley, Jeff & Ojha, Divesh, 2021. "On the relationship between lean scheduling and economic performance in shipbuilding: A proposed model and comparative evaluation," International Journal of Production Economics, Elsevier, vol. 239(C).
  • Handle: RePEc:eee:proeco:v:239:y:2021:i:c:s092552732100178x
    DOI: 10.1016/j.ijpe.2021.108202
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S092552732100178X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2021.108202?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Li, Guo & Li, Na & Sambandam, Narayanasamy & Sethi, Suresh P. & Zhang, Faping, 2018. "Flow shop scheduling with jobs arriving at different times," International Journal of Production Economics, Elsevier, vol. 206(C), pages 250-260.
    2. Seppo Kuula & Harri Haapasalo & Arto Tolonen, 2018. "Cost-efficient co-creation of knowledge intensive business services," Service Business, Springer;Pan-Pacific Business Association, vol. 12(4), pages 779-808, December.
    3. Hazır, Öncü & Ulusoy, Gündüz, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," International Journal of Production Economics, Elsevier, vol. 223(C).
    4. Ben Issa, Samer & Patterson, Raymond A. & Tu, Yiliu, 2021. "Solving resource-constrained multi-project environment under different activity assumptions," International Journal of Production Economics, Elsevier, vol. 232(C).
    5. Bergstrom, Max & Stehn, Lars, 2005. "Matching industrialised timber frame housing needs and enterprise resource planning: A change process," International Journal of Production Economics, Elsevier, vol. 97(2), pages 172-184, August.
    6. Park, Jaehun & Lee, Dongha & Zhu, Joe, 2014. "An integrated approach for ship block manufacturing process performance evaluation: Case from a Korean shipbuilding company," International Journal of Production Economics, Elsevier, vol. 156(C), pages 214-222.
    7. Güler, M. Güray & Bilgiç, Taner & Güllü, Refik, 2014. "Joint inventory and pricing decisions when customers are delay sensitive," International Journal of Production Economics, Elsevier, vol. 157(C), pages 302-312.
    8. Lee, Jae Kyu & Lee, Kyoung Jun & Park, Hung Kook & Hong, June Seok & Lee, Jung Seung, 1997. "Developing scheduling systems for Daewoo Shipbuilding: DAS project," European Journal of Operational Research, Elsevier, vol. 97(2), pages 380-395, March.
    9. Öncü Hazir & Gündüz Ulusoy, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," Post-Print hal-02898162, HAL.
    10. Alkhoraif, Abdullah & Rashid, Hamad & McLaughlin, Patrick, 2019. "Lean implementation in small and medium enterprises: Literature review," Operations Research Perspectives, Elsevier, vol. 6(C).
    11. Mohd Helmi Ali & Suhaiza Zailani & Mohammad Iranmanesh & Behzad Foroughi, 2019. "Impacts of Environmental Factors on Waste, Energy, and Resource Management and Sustainable Performance," Sustainability, MDPI, vol. 11(8), pages 1-16, April.
    12. Naga Vamsi Krishna Jasti & Rambabu Kodali, 2015. "Lean production: literature review and trends," International Journal of Production Research, Taylor & Francis Journals, vol. 53(3), pages 867-885, February.
    13. Wenxia Ge & Jeong-Bon Kim, 2014. "Boards, takeover protection, and real earnings management," Review of Quantitative Finance and Accounting, Springer, vol. 43(4), pages 651-682, November.
    14. Pellerin, Robert & Perrier, Nathalie & Berthaut, François, 2020. "A survey of hybrid metaheuristics for the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 280(2), pages 395-416.
    15. Koufteros, Xenophon A. & Nahm, Abraham Y. & Edwin Cheng, T.C. & Lai, Kee-hung, 2007. "An empirical assessment of a nomological network of organizational design constructs: From culture to structure to pull production to performance," International Journal of Production Economics, Elsevier, vol. 106(2), pages 468-492, April.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Liu, Zhixue & Ding, Ronggui & Wang, Lei & Song, Rui & Song, Xinyi, 2023. "Cooperation in an uncertain environment: The impact of stakeholders' concerted action on collaborative innovation projects risk management," Technological Forecasting and Social Change, Elsevier, vol. 196(C).
    2. Orlando Durán & Paulo Afonso & Víctor Jiménez & Katty Carvajal, 2023. "Cost of Ownership of Spare Parts under Uncertainty: Integrating Reliability and Costs," Mathematics, MDPI, vol. 11(15), pages 1-23, July.
    3. Mirjana Todorović & Milan Čupić & Dejan Jovanović, 2022. "Sustainable Lean Implementation: A Study Of Serbian Companies," Economic Annals, Faculty of Economics and Business, University of Belgrade, vol. 67(234), pages 81-108, July – Se.
    4. He, Yukang & Jia, Tao & Zheng, Weibo, 2023. "Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty," European Journal of Operational Research, Elsevier, vol. 310(1), pages 34-52.
    5. Mohammed M. Alhaider & Ziad M. Ali & Mostafa H. Mostafa & Shady H. E. Abdel Aleem, 2023. "Economic Viability of NaS Batteries for Optimal Microgrid Operation and Hosting Capacity Enhancement under Uncertain Conditions," Sustainability, MDPI, vol. 15(20), pages 1-24, October.
    6. Suzuki, Kenya & Wada, Ryota & Konno, Yoshihiro & Hiekata, Kazuo & Nanjo, Takashi & Nagakubo, Sadao, 2024. "Impact of epistemic uncertainty on tradeoff in model-based decision support for methane hydrate development system design," Applied Energy, Elsevier, vol. 356(C).
    7. Ram, Jiwat, 2023. "Investigating staff capabilities to make projects resilient: A systematic literature review and future directions," International Journal of Production Economics, Elsevier, vol. 255(C).
    8. Ilkyeong Moon & Sanghyup Lee & Moonsoo Shin & Kwangyeol Ryu, 2016. "Evolutionary resource assignment for workload-based production scheduling," Journal of Intelligent Manufacturing, Springer, vol. 27(2), pages 375-388, April.
    9. Saeed Siyal, Waqas Ahmed, Muhammad Musa Kaleem, Lulu Wang, 2020. "Determinants of Real Earning Management: A Study in Public Listed Companies in Pakistan Stock Exchange," Journal of Finance and Economics Research, Geist Science, Iqra University, Faculty of Business Administration, vol. 5(2), pages 96-111, October.
    10. David Roch-Dupré & Carlos Camacho-Gómez & Asunción P. Cucala & Silvia Jiménez-Fernández & Álvaro López-López & Antonio Portilla-Figueras & Ramón R. Pecharromán & Antonio Fernández-Cardador & Sancho Sa, 2021. "Optimal Location and Sizing of Energy Storage Systems in DC-Electrified Railway Lines Using a Coral Reefs Optimization Algorithm with Substrate Layers," Energies, MDPI, vol. 14(16), pages 1-19, August.
    11. Xiang Li & Yongjian Li, 2016. "On lot-sizing problem in a random yield production system under loss aversion," Annals of Operations Research, Springer, vol. 240(2), pages 415-434, May.
    12. Changjiu Li & Yong Zhang & Xichao Su & Xinwei Wang, 2022. "An Improved Optimization Algorithm for Aeronautical Maintenance and Repair Task Scheduling Problem," Mathematics, MDPI, vol. 10(20), pages 1-25, October.
    13. Hong, Paul & Jagani, Sandeep & Kim, Jinhwan & Youn, Sun Hee, 2019. "Managing sustainability orientation: An empirical investigation of manufacturing firms," International Journal of Production Economics, Elsevier, vol. 211(C), pages 71-81.
    14. Ali, Muhammad Jahangir & Biswas, Pallab Kumar & Chapple, Larelle & Kumarasinghe, Sriyalatha, 2024. "Institutional ownership and earnings quality: Evidence from China," Pacific-Basin Finance Journal, Elsevier, vol. 84(C).
    15. Falah Abu & Hamed Gholami & Norhayati Zakuan & Muhamad Zameri Mat Saman & Dalia Streimikiene & Justas Streimikis, 2020. "The Influence of Contextual Factors on the Implementation of Lean Practices: An Analysis of Furniture Industries," The AMFITEATRU ECONOMIC journal, Academy of Economic Studies - Bucharest, Romania, vol. 22(55), pages 867-867, August.
    16. Khalid Rasheed Memon & Say Keat Ooi & Heesup Han, 2024. "Responsible innovation and corporate sustainability performance: A structural equation modeling‐neural network approach," Business Strategy and the Environment, Wiley Blackwell, vol. 33(4), pages 2712-2730, May.
    17. Burström, Thommie & Parida, Vinit & Lahti, Tom & Wincent, Joakim, 2021. "AI-enabled business-model innovation and transformation in industrial ecosystems: A framework, model and outline for further research," Journal of Business Research, Elsevier, vol. 127(C), pages 85-95.
    18. Yin Liu & Huiqi Gan & Khondkar Karim, 2021. "The effectiveness of chief financial officer board membership in improving corporate investment efficiency," Review of Quantitative Finance and Accounting, Springer, vol. 57(2), pages 487-521, August.
    19. Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
    20. Cristi A. Gleason & Sascha Kieback & Martin Thomsen & Christoph Watrin, 2021. "Monitoring or payroll maximization? What happens when workers enter the boardroom?," Review of Accounting Studies, Springer, vol. 26(3), pages 1046-1087, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:239:y:2021:i:c:s092552732100178x. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.