Abstract

Currently, the ageing population is getting higher attention in production systems due to the increasing percentage of the ageing workforce, which persists longer in the working environment. Older workers are more vulnerable because of a possible decrease in physical capacities but can have a higher experience level. It is important to evaluate these factors during production process decisions and adapt the working environment to such workers. In such a way, production systems performance and workers’ well-being are jointly achieved. In companies aiming to include these aspects, digitalisation and automation can provide tools that can be used at tactical, strategic or operational levels. For example, at the operational level, wearable sensors, smart devices or trackers can be used in analysing the working time, effort and physical fatigue of operators via human-energy expenditure. These measures can be used to assess the required recovery time. However, the most challenging step is to include these measures in the decision-making process to organise the working process for operators according to their profiles and health restrictions. In this paper, we show how fatigue can be incorporated into operational processes such as scheduling in the context of a Dual-Resource Constrained (DRC) job shop. We consider several models to integrate rest allowance into the scheduling process and present a heuristic approach to assign operations to workers and machines. The impact of rest allowance on system performance is measured and managerial insights are provided.

Suggested Citation

  • Berti, Nicola & Finco, Serena & Battaïa, Olga & Delorme, Xavier, 2021. "Ageing workforce effects in Dual-Resource Constrained job-shop scheduling," International Journal of Production Economics, Elsevier, vol. 237(C).
  • Handle: RePEc:eee:proeco:v:237:y:2021:i:c:s0925527321001274
    DOI: 10.1016/j.ijpe.2021.108151
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527321001274
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2021.108151?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Mossa, G. & Boenzi, F. & Digiesi, S. & Mummolo, G. & Romano, V.A., 2016. "Productivity and ergonomic risk in human based production systems: A job-rotation scheduling model," International Journal of Production Economics, Elsevier, vol. 171(P4), pages 471-477.
    2. Martina Calzavara & Daria Battini & David Bogataj & Fabio Sgarbossa & Ilenia Zennaro, 2020. "Ageing workforce management in manufacturing systems: state of the art and future research agenda," International Journal of Production Research, Taylor & Francis Journals, vol. 58(3), pages 729-747, February.
    3. Rosser T. Nelson, 1967. "Labor and Machine Limited Production Systems," Management Science, INFORMS, vol. 13(9), pages 648-671, May.
    4. Mourad Benttaleb & Faicel Hnaien & Farouk Yalaoui, 2019. "Minimising the makespan in the two-machine job shop problem under availability constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 57(5), pages 1427-1457, March.
    5. Serena Finco & Daria Battini & Xavier Delorme & Alessandro Persona & Fabio Sgarbossa, 2020. "Workers’ rest allowance and smoothing of the workload in assembly lines," International Journal of Production Research, Taylor & Francis Journals, vol. 58(4), pages 1255-1270, February.
    6. Xu, J. & Xu, X. & Xie, S.Q., 2011. "Recent developments in Dual Resource Constrained (DRC) system research," European Journal of Operational Research, Elsevier, vol. 215(2), pages 309-318, December.
    7. Bogataj, David & Battini, Daria & Calzavara, Martina & Persona, Alessandro, 2019. "The ageing workforce challenge: Investments in collaborative robots or contribution to pension schemes, from the multi-echelon perspective," International Journal of Production Economics, Elsevier, vol. 210(C), pages 97-106.
    8. John S. Fryer, 1973. "Operating Policies in Multiechelon Dual-Constraint Job Shops," Management Science, INFORMS, vol. 19(9), pages 1001-1012, May.
    9. Schemeleva, Kseniya & Delorme, Xavier & Dolgui, Alexandre, 2018. "Evaluation of solution approaches for a stochastic lot-sizing and sequencing problem," International Journal of Production Economics, Elsevier, vol. 199(C), pages 179-192.
    10. Fred Easton, 2011. "Cross-training performance in flexible labor scheduling environments," IISE Transactions, Taylor & Francis Journals, vol. 43(8), pages 589-603.
    11. Debroux, Philippe, 2016. "Elderly workers in Japan: The need for a new deal," management revue - Socio-Economic Studies, Nomos Verlagsgesellschaft mbH & Co. KG, vol. 27(1-2), pages 82-96.
    12. David Applegate & William Cook, 1991. "A Computational Study of the Job-Shop Scheduling Problem," INFORMS Journal on Computing, INFORMS, vol. 3(2), pages 149-156, May.
    13. Rajagopal, 2014. "The Human Factors," Palgrave Macmillan Books, in: Architecting Enterprise, chapter 9, pages 225-249, Palgrave Macmillan.
    14. Zamiska, John R. & Jaber, Mohamad Y. & Kher, Hemant V., 2007. "Worker deployment in dual resource constrained systems with a task-type factor," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1507-1519, March.
    15. Xiong, Jian & Xing, Li-ning & Chen, Ying-wu, 2013. "Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns," International Journal of Production Economics, Elsevier, vol. 141(1), pages 112-126.
    16. Niloofar Katiraee & Martina Calzavara & Serena Finco & Daria Battini & Olga Battaïa, 2021. "Consideration of workers’ differences in production systems modelling and design: State of the art and directions for future research," International Journal of Production Research, Taylor & Francis Journals, vol. 59(11), pages 3237-3268, June.
    17. Sgarbossa, F. & Grosse, E. H. & Neumann, W. P. & Battini, D. & Glock, C. H., 2020. "Human factors in production and logistics systems of the future," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 120615, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    18. Daria Battini & Xavier Delorme & Alexandre Dolgui & Alessandro Persona & Fabio Sgarbossa, 2016. "Ergonomics in assembly line balancing based on energy expenditure: a multi-objective model," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 824-845, February.
    19. Aytug, Haldun & Lawley, Mark A. & McKay, Kenneth & Mohan, Shantha & Uzsoy, Reha, 2005. "Executing production schedules in the face of uncertainties: A review and some future directions," European Journal of Operational Research, Elsevier, vol. 161(1), pages 86-110, February.
    20. Debroux, Philippe, 2016. "Elderly workers in Japan: The need for a new deal," management revue. Socio-economic Studies, Rainer Hampp Verlag, vol. 27(1-2), pages 82-96.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Marco Trost & Thorsten Claus & Frank Herrmann, 2022. "Social Sustainability in Production Planning: A Systematic Literature Review," Sustainability, MDPI, vol. 14(13), pages 1-31, July.
    2. Raja Awais Liaqait & Shermeen Hamid & Salman Sagheer Warsi & Azfar Khalid, 2021. "A Critical Analysis of Job Shop Scheduling in Context of Industry 4.0," Sustainability, MDPI, vol. 13(14), pages 1-19, July.
    3. Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
    4. Battini, Daria & Berti, Nicola & Finco, Serena & Zennaro, Ilenia & Das, Ajay, 2022. "Towards industry 5.0: A multi-objective job rotation model for an inclusive workforce," International Journal of Production Economics, Elsevier, vol. 250(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
    2. Battini, Daria & Berti, Nicola & Finco, Serena & Zennaro, Ilenia & Das, Ajay, 2022. "Towards industry 5.0: A multi-objective job rotation model for an inclusive workforce," International Journal of Production Economics, Elsevier, vol. 250(C).
    3. Xu, J. & Xu, X. & Xie, S.Q., 2011. "Recent developments in Dual Resource Constrained (DRC) system research," European Journal of Operational Research, Elsevier, vol. 215(2), pages 309-318, December.
    4. Marco Trost & Thorsten Claus & Frank Herrmann, 2022. "Social Sustainability in Production Planning: A Systematic Literature Review," Sustainability, MDPI, vol. 14(13), pages 1-31, July.
    5. S. David Wu & Eui-Seok Byeon & Robert H. Storer, 1999. "A Graph-Theoretic Decomposition of the Job Shop Scheduling Problem to Achieve Scheduling Robustness," Operations Research, INFORMS, vol. 47(1), pages 113-124, February.
    6. Shichang Xiao & Zigao Wu & Hongyan Dui, 2022. "Resilience-Based Surrogate Robustness Measure and Optimization Method for Robust Job-Shop Scheduling," Mathematics, MDPI, vol. 10(21), pages 1-22, October.
    7. Faicel Hnaien & Taha Arbaoui, 2023. "Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown," Annals of Operations Research, Springer, vol. 328(2), pages 1437-1460, September.
    8. Mobin, Mohammadsadegh & Li, Zhaojun & Cheraghi, S. Hossein & Wu, Gongyu, 2019. "An approach for design Verification and Validation planning and optimization for new product reliability improvement," Reliability Engineering and System Safety, Elsevier, vol. 190(C), pages 1-1.
    9. Vipul Jain & Ignacio E. Grossmann, 2001. "Algorithms for Hybrid MILP/CP Models for a Class of Optimization Problems," INFORMS Journal on Computing, INFORMS, vol. 13(4), pages 258-276, November.
    10. A. Ozolins, 2020. "A new exact algorithm for no-wait job shop problem to minimize makespan," Operational Research, Springer, vol. 20(4), pages 2333-2363, December.
    11. Federica Costa & Matthias Thürer & Alberto Portioli-Staudacher, 2023. "Heterogeneous worker multi-functionality and efficiency in dual resource constrained manufacturing lines: an assessment by simulation," Operations Management Research, Springer, vol. 16(3), pages 1476-1489, September.
    12. Arkhipov, Dmitry & Battaïa, Olga & Lazarev, Alexander, 2019. "An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the Resource Constrained Project Scheduling Problem," European Journal of Operational Research, Elsevier, vol. 275(1), pages 35-44.
    13. Carlo Mannino & Alessandro Mascis, 2009. "Optimal Real-Time Traffic Control in Metro Stations," Operations Research, INFORMS, vol. 57(4), pages 1026-1039, August.
    14. Diarmuid Grimes & Emmanuel Hebrard, 2015. "Solving Variants of the Job Shop Scheduling Problem Through Conflict-Directed Search," INFORMS Journal on Computing, INFORMS, vol. 27(2), pages 268-284, May.
    15. Marco Pranzo & Dario Pacciarelli, 2016. "An iterated greedy metaheuristic for the blocking job shop scheduling problem," Journal of Heuristics, Springer, vol. 22(4), pages 587-611, August.
    16. G I Zobolas & C D Tarantilis & G Ioannou, 2009. "A hybrid evolutionary algorithm for the job shop scheduling problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(2), pages 221-235, February.
    17. Michael Pinedo & Marcos Singer, 1999. "A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 1-17, February.
    18. Sophie Demassey & Christian Artigues & Philippe Michelon, 2005. "Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project Scheduling Problem," INFORMS Journal on Computing, INFORMS, vol. 17(1), pages 52-65, February.
    19. Ferreira, Cristiane & Figueira, Gonçalo & Amorim, Pedro, 2022. "Effective and interpretable dispatching rules for dynamic job shops via guided empirical learning," Omega, Elsevier, vol. 111(C).
    20. Mohammad Mahdi Ahmadian & Amir Salehipour, 2021. "The just-in-time job-shop scheduling problem with distinct due-dates for operations," Journal of Heuristics, Springer, vol. 27(1), pages 175-204, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:237:y:2021:i:c:s0925527321001274. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.