IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v173y2016icp184-198.html
   My bibliography  Save this article

Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system

Author

Listed:
  • Bouslah, B.
  • Gharbi, A.
  • Pellerin, R.

Abstract

Standard continuous sampling procedures and tables are conventionally applicable only to continuous production processes that are statistically ‘in-control’. Consequently, these standards cannot be used to control quality in deteriorating production processes. Moreover, existing continuous sampling models do not consider interactions with production, inventory and maintenance aspects. In this paper, we attempt to fill these gaps in the literature. We investigate the joint design and optimization of a type-1 continuous sampling plan (CSP-1), make-to-stock production and preventive maintenance of a stochastic production system subject to both quality and reliability deteriorations. Two models of CSP-1 are considered and compared: the classical CSP-1 as in the standard procedures, and a CSP-1 plan with a stopping rule that is combined with condition-based maintenance. For both models, the optimization problem is to minimize the total incurred cost under a constraint on the outgoing quality. A combination of mathematical formulation, simulation and optimization techniques is used to solve such stochastic and constrained problems. Numerical examples are given to illustrate the resolution approach and to highlight some interesting aspects in the interactions between production, inventory, quality, maintenance and reliability. The results obtained demonstrate that sampling inspection plans realize significant cost savings compared to the 100% inspection which is commonly used in the literature of integrated models, and that using the CSP-1 with an inspection stopping rule for deteriorating processes is more cost-effective than the classical CSP-1.

Suggested Citation

  • Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 173(C), pages 184-198.
  • Handle: RePEc:eee:proeco:v:173:y:2016:i:c:p:184-198
    DOI: 10.1016/j.ijpe.2015.12.016
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527315005411
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2015.12.016?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chung-Ho Chen & Chao-Yu Chou, 2002. "Economic design of continuous sampling plan under linear inspection cost," Journal of Applied Statistics, Taylor & Francis Journals, vol. 29(7), pages 1003-1009.
    2. Wang, Hongzhou, 2002. "A survey of maintenance policies of deteriorating systems," European Journal of Operational Research, Elsevier, vol. 139(3), pages 469-489, June.
    3. Berthaut, F. & Gharbi, A. & Kenné, J.-P. & Boulet, J.-F., 2010. "Improved joint preventive maintenance and hedging point policy," International Journal of Production Economics, Elsevier, vol. 127(1), pages 60-72, September.
    4. Hsu, Lie-Fern & Kuo, Shyanjaw, 1995. "Design of optimal maintenance policies based on on-line sampling plans," European Journal of Operational Research, Elsevier, vol. 86(2), pages 345-357, October.
    5. Gabriella Budai & Rommert Dekker & Robin P. Nicolai, 2008. "Maintenance and Production: A Review of Planning Models," Springer Series in Reliability Engineering, in: Complex System Maintenance Handbook, chapter 13, pages 321-344, Springer.
    6. Rivera-Gómez, Héctor & Gharbi, Ali & Kenné, Jean Pierre, 2013. "Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality," International Journal of Production Economics, Elsevier, vol. 146(2), pages 575-587.
    7. Xiang, Yisha, 2013. "Joint optimization of X¯ control chart and preventive maintenance policies: A discrete-time Markov chain approach," European Journal of Operational Research, Elsevier, vol. 229(2), pages 382-390.
    8. Yongxin Cao & Velusamy Subramaniam, 2013. "Improving the performance of manufacturing systems with continuous sampling plans," IISE Transactions, Taylor & Francis Journals, vol. 45(6), pages 575-590.
    9. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    10. Yin, Hui & Zhang, Guojun & Zhu, Haiping & Deng, Yuhao & He, Fei, 2015. "An integrated model of statistical process control and maintenance based on the delayed monitoring," Reliability Engineering and System Safety, Elsevier, vol. 133(C), pages 323-333.
    11. Guojun Zhang & Yuhao Deng & Haiping Zhu & Hui Yin, 2015. "Delayed maintenance policy optimisation based on control chart," International Journal of Production Research, Taylor & Francis Journals, vol. 53(2), pages 341-353, January.
    12. Laith A. Hadidi & Umar M. Al-Turki & Abdur Rahim, 2012. "Integrated models in production planning and scheduling, maintenance and quality: a review," International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 10(1), pages 21-50.
    13. Ben-Daya, M. & Rahim, M. A., 2000. "Effect of maintenance on the economic design of -control chart," European Journal of Operational Research, Elsevier, vol. 120(1), pages 131-143, January.
    14. Robert Inman & Dennis Blumenfeld & Ningjian Huang & Jingshan Li & Jing Li, 2013. "Survey of recent advances on the interface between production system design and quality," IISE Transactions, Taylor & Francis Journals, vol. 45(6), pages 557-574.
    15. Colledani, Marcello & Tolio, Tullio, 2009. "Performance evaluation of production systems monitored by statistical process control and off-line inspections," International Journal of Production Economics, Elsevier, vol. 120(2), pages 348-367, August.
    16. Soliman, Ahmed A. & Abd Ellah, A.H. & Sultan, K.S., 2006. "Comparison of estimates using record statistics from Weibull model: Bayesian and non-Bayesian approaches," Computational Statistics & Data Analysis, Elsevier, vol. 51(3), pages 2065-2077, December.
    17. Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint," Omega, Elsevier, vol. 61(C), pages 110-126.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2017. "Joint supplier selection, production and replenishment of an unreliable manufacturing-oriented supply chain," International Journal of Production Economics, Elsevier, vol. 187(C), pages 53-67.
    2. Cheng, Guo Qing & Zhou, Bing Hai & Li, Ling, 2018. "Integrated production, quality control and condition-based maintenance for imperfect production systems," Reliability Engineering and System Safety, Elsevier, vol. 175(C), pages 251-264.
    3. Santosh Shekhawat & Nazek Alessa & Himanshu Rathore & Kalpna Sharma, 2022. "A Green Approach—Cost Optimization for a Manufacturing Supply Chain with MFIFO Warehouse Dispatching Policy and Inspection Policy," Sustainability, MDPI, vol. 14(21), pages 1-17, November.
    4. Rivera-Gómez, Héctor & Gharbi, Ali & Kenné, Jean-Pierre & Montaño-Arango, Oscar & Hernández-Gress, Eva Selene, 2018. "Subcontracting strategies with production and maintenance policies for a manufacturing system subject to progressive deterioration," International Journal of Production Economics, Elsevier, vol. 200(C), pages 103-118.
    5. Leoni, Leonardo & De Carlo, Filippo & Tucci, Mario, 2023. "Developing a framework for generating production-dependent failure rate through discrete-event simulation," International Journal of Production Economics, Elsevier, vol. 266(C).
    6. Sinisterra, Wilfrido Quiñones & Lima, Victor Hugo Resende & Cavalcante, Cristiano Alexandre Virginio & Aribisala, Adetoye Ayokunle, 2023. "A delay-time model to integrate the sequence of resumable jobs, inspection policy, and quality for a single-component system," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
    7. Małgorzata Jasiulewicz-Kaczmarek & Katarzyna Antosz & Ryszard Wyczółkowski & Dariusz Mazurkiewicz & Bo Sun & Cheng Qian & Yi Ren, 2021. "Application of MICMAC, Fuzzy AHP, and Fuzzy TOPSIS for Evaluation of the Maintenance Factors Affecting Sustainable Manufacturing," Energies, MDPI, vol. 14(5), pages 1-30, March.
    8. Liang Yang & Qinming Liu & Tangbin Xia & Chunming Ye & Jiaxiang Li, 2022. "Preventive Maintenance Strategy Optimization in Manufacturing System Considering Energy Efficiency and Quality Cost," Energies, MDPI, vol. 15(21), pages 1-18, November.
    9. Gössinger, Ralf & Helmke, Hanna & Kaluzny, Michael, 2017. "Condition-based release of maintenance jobs in a decentralised production-maintenance system – An analysis of alternative stochastic approaches," International Journal of Production Economics, Elsevier, vol. 193(C), pages 528-537.
    10. Azimpoor, Samareh & Taghipour, Sharareh, 2021. "Joint inspection and product quality optimization for a system with delayed failure," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    11. Cheng, Guoqing & Li, Ling, 2020. "Joint optimization of production, quality control and maintenance for serial-parallel multistage production systems," Reliability Engineering and System Safety, Elsevier, vol. 204(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint," Omega, Elsevier, vol. 61(C), pages 110-126.
    2. Cheng, Guoqing & Li, Ling, 2020. "Joint optimization of production, quality control and maintenance for serial-parallel multistage production systems," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    3. Tambe, Pravin P. & Kulkarni, Makarand S., 2022. "A reliability based integrated model of maintenance planning with quality control and production decision for improving operational performance," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
    4. Lu, Biao & Zhou, Xiaojun, 2017. "Opportunistic preventive maintenance scheduling for serial-parallel multistage manufacturing systems with multiple streams of deterioration," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 116-127.
    5. Kenné, Jean-Pierre & Gharbi, Ali, 2018. "Production and replacement policies for a deteriorating manufacturing system under random demand and qualityAuthor-Name: Ouaret, Samir," European Journal of Operational Research, Elsevier, vol. 264(2), pages 623-636.
    6. Rajesh Saha & Abdullahil Azeem & Kazi Wahadul Hasan & Syed Mithun Ali & Sanjoy Kumar Paul, 2021. "Integrated economic design of quality control and maintenance management: Implications for managing manufacturing process," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 12(2), pages 263-280, April.
    7. Jiawen Hu & Zuhua Jiang & Hong Wang, 2017. "Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(04), pages 1-28, August.
    8. Rivera-Gómez, Héctor & Gharbi, Ali & Kenné, Jean Pierre, 2013. "Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality," International Journal of Production Economics, Elsevier, vol. 146(2), pages 575-587.
    9. de Jonge, Bram & Scarf, Philip A., 2020. "A review on maintenance optimization," European Journal of Operational Research, Elsevier, vol. 285(3), pages 805-824.
    10. Rasay, Hasan & Taghipour, Sharareh & Sharifi, Mani, 2022. "An integrated Maintenance and Statistical Process Control Model for a Deteriorating Production Process," Reliability Engineering and System Safety, Elsevier, vol. 228(C).
    11. Xiang, Yisha, 2013. "Joint optimization of X¯ control chart and preventive maintenance policies: A discrete-time Markov chain approach," European Journal of Operational Research, Elsevier, vol. 229(2), pages 382-390.
    12. Wu, Shaomin & Scarf, Philip, 2015. "Decline and repair, and covariate effects," European Journal of Operational Research, Elsevier, vol. 244(1), pages 219-226.
    13. Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2015. "Replenishment, production and quality control strategies in three-stage supply chain," International Journal of Production Economics, Elsevier, vol. 166(C), pages 90-102.
    14. Ekin, Tahir, 2018. "Integrated maintenance and production planning with endogenous uncertain yield," Reliability Engineering and System Safety, Elsevier, vol. 179(C), pages 52-61.
    15. Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2017. "Joint supplier selection, production and replenishment of an unreliable manufacturing-oriented supply chain," International Journal of Production Economics, Elsevier, vol. 187(C), pages 53-67.
    16. Gössinger, Ralf & Helmke, Hanna & Kaluzny, Michael, 2017. "Condition-based release of maintenance jobs in a decentralised production-maintenance system – An analysis of alternative stochastic approaches," International Journal of Production Economics, Elsevier, vol. 193(C), pages 528-537.
    17. Azimpoor, Samareh & Taghipour, Sharareh, 2021. "Joint inspection and product quality optimization for a system with delayed failure," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    18. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
    19. Boumallessa, Zeineb & Chouikhi, Houssam & Elleuch, Mounir & Bentaher, Hatem, 2023. "Modeling and optimizing the maintenance schedule using dynamic quality and machine condition monitors in an unreliable single production system," Reliability Engineering and System Safety, Elsevier, vol. 235(C).
    20. Michael Patriksson & Ann-Brith Strömberg & Adam Wojciechowski, 2015. "The stochastic opportunistic replacement problem, part II: a two-stage solution approach," Annals of Operations Research, Springer, vol. 224(1), pages 51-75, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:173:y:2016:i:c:p:184-198. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.