Development of a cost-effective inspection scheme with adaptive lot-disposition mechanisms and a third-generation capability index
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2025.109714
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.References listed on IDEAS
- Chien-Wei Wu & Tai-Hsi Wu & Tiffany Chen, 2015. "Developing a variables repetitive group sampling scheme by considering process yield and quality loss," International Journal of Production Research, Taylor & Francis Journals, vol. 53(7), pages 2239-2251, April.
- Chen, Kuen-Suan & Wang, Ching-Hsin & Tan, Kim-Hua, 2019. "Developing a fuzzy green supplier selection model using six sigma quality indices," International Journal of Production Economics, Elsevier, vol. 212(C), pages 1-7.
- Chien-Wei Wu & Armin Darmawan & Shih-Wen Liu, 2023. "Stage-independent multiple sampling plan by variables inspection for lot determination based on the process capability index Cpk," International Journal of Production Research, Taylor & Francis Journals, vol. 61(10), pages 3171-3183, May.
- Lee, Amy H.I. & Wu, Chien-Wei & Wang, To-Cheng & Kuo, Ming-Han, 2024. "Construction of acceptance sampling schemes for exponential lifetime products with progressive type II right censoring," Reliability Engineering and System Safety, Elsevier, vol. 243(C).
- Wu, Chien-Wei & Pearn, W.L., 2008. "A variables sampling plan based on Cpmk for product acceptance determination," European Journal of Operational Research, Elsevier, vol. 184(2), pages 549-560, January.
- Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 173(C), pages 184-198.
- Chien-Wei Wu & Zih-Huei Wang, 2017. "Developing a variables multiple dependent state sampling plan with simultaneous consideration of process yield and quality loss," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2351-2364, April.
- Wu, Chien-Wei & Wang, Zih-Huei, 2024. "A cost-effective skip-lot sampling scheme using loss-based capability index for product acceptance determination," International Journal of Production Economics, Elsevier, vol. 273(C).
- Wu, Chien-Wei & Shu, Ming-Hung & Wang, To-Cheng & Chen, Yen-Lun, 2024. "Integrating capability index and generalized rule-switching mechanism for enhanced quick-switch sampling systems," International Journal of Production Economics, Elsevier, vol. 276(C).
- To-Cheng Wang & Ming-Hung Shu, 2023. "Development of an adaptive sampling system based on a process capability index with flexible switching mechanism," International Journal of Production Research, Taylor & Francis Journals, vol. 61(21), pages 7233-7247, November.
- Lepore, A. & Palumbo, B. & Castagliola, P., 2018. "A note on decision making method for product acceptance based on process capability indices Cpk and Cpmk," European Journal of Operational Research, Elsevier, vol. 267(1), pages 393-398.
- Wu, Chien-Wei & Pearn, W.L. & Kotz, Samuel, 2009. "An overview of theory and practice on process capability indices for quality assurance," International Journal of Production Economics, Elsevier, vol. 117(2), pages 338-359, February.
- To-Cheng Wang & Chien-Wei Wu & Ming-Hung Shu, 2022. "A variables-type multiple-dependent-state sampling plan based on the lifetime performance index under a Weibull distribution," Annals of Operations Research, Springer, vol. 311(1), pages 381-399, April.
- To-Cheng Wang & Ming-Hung Shu & Bi-Min Hsu & Chih-Wei Hsu, 2022. "Adjustable variables multiple-dependent-state sampling plans based on a process capability index," Journal of the Operational Research Society, Taylor & Francis Journals, vol. 73(12), pages 2626-2639, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Banihashemi, Atefe & Wu, Chien-Wei & Amiri, Amirhossein, 2025. "Analytical modeling of an acceptance sampling plan with the functional process capability index for circular profiles," International Journal of Production Economics, Elsevier, vol. 288(C).
- Chien-Wei Wu & To-Cheng Wang, 2025. "Development of a cost-effective adaptive sampling system considering process yield and quality loss," Operational Research, Springer, vol. 25(2), pages 1-16, June.
- Chien-Wei Wu & Armin Darmawan, 2025. "A modified sampling scheme for lot sentencing based on the third-generation capability index," Annals of Operations Research, Springer, vol. 349(1), pages 25-46, June.
- Wu, Chien-Wei & Shu, Ming-Hung & Wang, To-Cheng & Chen, Yen-Lun, 2024. "Integrating capability index and generalized rule-switching mechanism for enhanced quick-switch sampling systems," International Journal of Production Economics, Elsevier, vol. 276(C).
- Chien-Wei Wu & Ming-Hung Shu & Pei-An Wang & Bi-Min Hsu, 2021. "Variables skip-lot sampling plans on the basis of process capability index for products with a low fraction of defectives," Computational Statistics, Springer, vol. 36(2), pages 1391-1413, June.
- Shih-Wen Liu & Chien-Wei Wu, 2024. "An efficient partial sampling inspection for lot sentencing based on process yield," Annals of Operations Research, Springer, vol. 340(1), pages 325-344, September.
- Wu, Chien-Wei & Wang, Zih-Huei, 2024. "A cost-effective skip-lot sampling scheme using loss-based capability index for product acceptance determination," International Journal of Production Economics, Elsevier, vol. 273(C).
- Chien-Wei Wu & Zih-Huei Wang, 2017. "Developing a variables multiple dependent state sampling plan with simultaneous consideration of process yield and quality loss," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2351-2364, April.
- Wu, Chien-Wei & Wang, To-Cheng & Chen, Rou-Hui, 2025. "Development of acceptance sampling plans under time-truncated life test for verifying product reliability using weibull-percentile lifetimes," Reliability Engineering and System Safety, Elsevier, vol. 261(C).
- Wu, Chien-Wei & Aslam, Muhammad & Jun, Chi-Hyuck, 2012. "Variables sampling inspection scheme for resubmitted lots based on the process capability index Cpk," European Journal of Operational Research, Elsevier, vol. 217(3), pages 560-566.
- Li, Der-Chiang & Lin, Liang-Sian, 2013. "A new approach to assess product lifetime performance for small data sets," European Journal of Operational Research, Elsevier, vol. 230(2), pages 290-298.
- Samrad Jafarian-Namin & Parviz Fattahi & Ali Salmasnia, 2025. "Assessing the economic-statistical performance of variable acceptance sampling plans based on loss function," Computational Statistics, Springer, vol. 40(7), pages 3665-3713, September.
- Chien-Wei Wu & Zih-Huei Wang, 2025. "A cost-effective sampling strategy by variables inspection for lot disposition," Annals of Operations Research, Springer, vol. 349(1), pages 219-235, June.
- Amy H. I. Lee & Chien-Wei Wu & Yen-Wen Chen, 2016. "A modified variables repetitive group sampling plan with the consideration of preceding lots information," Annals of Operations Research, Springer, vol. 238(1), pages 355-373, March.
- Wang, Ching-Hsin & Chen, Kuen-Suan, 2020. "New process yield index of asymmetric tolerances for bootstrap method and six sigma approach," International Journal of Production Economics, Elsevier, vol. 219(C), pages 216-223.
- Amy Lee & Chien-Wei Wu & Yen-Wen Chen, 2016. "A modified variables repetitive group sampling plan with the consideration of preceding lots information," Annals of Operations Research, Springer, vol. 238(1), pages 355-373, March.
- Michele Scagliarini, 2022. "A sequential test and a sequential sampling plan based on the process capability index Cpmk," Computational Statistics, Springer, vol. 37(3), pages 1523-1550, July.
- Wu, Chien-Wei, 2012. "An efficient inspection scheme for variables based on Taguchi capability index," European Journal of Operational Research, Elsevier, vol. 223(1), pages 116-122.
- Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2017. "Joint supplier selection, production and replenishment of an unreliable manufacturing-oriented supply chain," International Journal of Production Economics, Elsevier, vol. 187(C), pages 53-67.
- Gössinger, Ralf & Helmke, Hanna & Kaluzny, Michael, 2017. "Condition-based release of maintenance jobs in a decentralised production-maintenance system – An analysis of alternative stochastic approaches," International Journal of Production Economics, Elsevier, vol. 193(C), pages 528-537.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:288:y:2025:i:c:s0925527325001999. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.
Printed from https://ideas.repec.org/a/eee/proeco/v288y2025ics0925527325001999.html