IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v130y2011i1p96-103.html
   My bibliography  Save this article

Reliability deployment in distributed manufacturing chains via closed-loop Six Sigma methodology

Author

Listed:
  • Jin, Tongdan
  • Janamanchi, Balaji
  • Feng, Qianmei

Abstract

This paper proposes a Six Sigma based framework to deploy high product reliability commitment in distributed subcontractor manufacturing processes. The study aims to expand the Six Sigma tools in applications, where products are designed and developed under the fast time-to-market requirement. The reliability deployment is driven by two incentives: the customer satisfaction and the reduction of the warranty cost. A closed-loop control mechanism is created between the upper and the lower manufacturing streams to identify and remove the early life failures occurred during the initial system installation. A cross-functional team is formed to implement Six Sigma tools for resolving critical failures arising in the upper manufacturing stream. The ultimate goal is to achieve high product reliability in the shortest time when the product time-to-market is essential for gaining the market share. Finally, the proposed control mechanism is demonstrated on the system designs drawn from the semiconductor testing industry.

Suggested Citation

  • Jin, Tongdan & Janamanchi, Balaji & Feng, Qianmei, 2011. "Reliability deployment in distributed manufacturing chains via closed-loop Six Sigma methodology," International Journal of Production Economics, Elsevier, vol. 130(1), pages 96-103, March.
  • Handle: RePEc:eee:proeco:v:130:y:2011:i:1:p:96-103
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(10)00449-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Yu, Hong-Fwu & Yu, Wen-Ching, 2007. "An optimal mixed policy of inspection and burn-in and the optimal production quantity," International Journal of Production Economics, Elsevier, vol. 105(2), pages 483-491, February.
    2. Kumar, U. Dinesh & Nowicki, David & Ramirez-Marquez, Jose Emmanuel & Verma, Dinesh, 2008. "On the optimal selection of process alternatives in a Six Sigma implementation," International Journal of Production Economics, Elsevier, vol. 111(2), pages 456-467, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Khan, Samir & Phillips, Paul & Jennions, Ian & Hockley, Chris, 2014. "No Fault Found events in maintenance engineering Part 1: Current trends, implications and organizational practices," Reliability Engineering and System Safety, Elsevier, vol. 123(C), pages 183-195.
    2. Khan, Samir & Phillips, Paul & Hockley, Chris & Jennions, Ian, 2014. "No Fault Found events in maintenance engineering Part 2: Root causes, technical developments and future research," Reliability Engineering and System Safety, Elsevier, vol. 123(C), pages 196-208.
    3. Kristianto, Yohanes & Gunasekaran, Angappa & Helo, Petri, 2017. "Building the “Triple R” in global manufacturing," International Journal of Production Economics, Elsevier, vol. 183(PC), pages 607-619.
    4. Anshu Gupta & Pallavi Sharma & Akansha Jain & Hongbo Xue & S. C. Malik & P. C. Jha, 2023. "An integrated DEMATEL Six Sigma hybrid framework for manufacturing process improvement," Annals of Operations Research, Springer, vol. 322(2), pages 713-753, March.
    5. Chen, Xiangpeng & Wang, Rongxi & Gao, Jianmin, 2023. "An optimization framework for enterprise quality infrastructure system under coupling constraints," International Journal of Production Economics, Elsevier, vol. 262(C).
    6. Ahmet Erkoyuncu, John & Khan, Samir & Hussain, Syed Mohammed Fazal & Roy, Rajkumar, 2016. "A framework to estimate the cost of No-Fault Found events," International Journal of Production Economics, Elsevier, vol. 173(C), pages 207-222.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Zu, Xingxing & Robbins, Tina L. & Fredendall, Lawrence D., 2010. "Mapping the critical links between organizational culture and TQM/Six Sigma practices," International Journal of Production Economics, Elsevier, vol. 123(1), pages 86-106, January.
    2. Kalashnikov, Vyacheslav & Benita, Francisco & López-Ramos, Francisco & Hernández-Luna, Alberto, 2017. "Bi-objective project portfolio selection in Lean Six Sigma," International Journal of Production Economics, Elsevier, vol. 186(C), pages 81-88.
    3. Kai Sandner & Sebastian Sieber & Marleen Tellermann & Frank Walthes, 2020. "A Lean Six Sigma framework for the insurance industry: insights and lessons learned from a case study," Journal of Business Economics, Springer, vol. 90(5), pages 845-878, June.
    4. Mustapha Nourelfath & Tariq Aldowaisan & Jawad Hassan, 2016. "Evaluating Six Sigma failure rate for inverse Gaussian cycle times," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6092-6101, October.
    5. Glover, Wiljeana J. & Farris, Jennifer A. & Van Aken, Eileen M. & Doolen, Toni L., 2011. "Critical success factors for the sustainability of Kaizen event human resource outcomes: An empirical study," International Journal of Production Economics, Elsevier, vol. 132(2), pages 197-213, August.
    6. Erceg Aleksandar & Dotlić Predrag & Mikuš Monika, 2018. "The 20 Keys Methodology – Continuous Improvement for Organizational Efficiency," Studia Universitatis Babeș-Bolyai Oeconomica, Sciendo, vol. 63(1), pages 20-36, April.
    7. Mahmoud Dehghan Nayeri & Malihe Rostami, 2016. "Effectiveness of six sigma methodology through BSC in banking industry," Journal of Asian Business Strategy, Asian Economic and Social Society, vol. 6(1), pages 13-21, January.
    8. Anshu Gupta & Pallavi Sharma & Akansha Jain & Hongbo Xue & S. C. Malik & P. C. Jha, 2023. "An integrated DEMATEL Six Sigma hybrid framework for manufacturing process improvement," Annals of Operations Research, Springer, vol. 322(2), pages 713-753, March.
    9. Fakhraddin Maroofi & Mohammad Nazaripour & Shahoo Maaznezhad, 2012. "Links Between Organizational Culture and Six Sigma Practices," International Journal of Academic Research in Accounting, Finance and Management Sciences, Human Resource Management Academic Research Society, International Journal of Academic Research in Accounting, Finance and Management Sciences, vol. 2(4), pages 83-101, October.
    10. Christian Hofmann & Erik Hofmann & Thomas Pfeiffer, 2008. "Kontrollrechte und Anreize in Supply Chains," Schmalenbach Journal of Business Research, Springer, vol. 60(59), pages 1-29, January.
    11. MAG, Andreea-Dora, 2011. "Photographing the relationship between corporate culture and implementation of quality practices," Romanian Distribution Committee Magazine, Romanian Distribution Committee, vol. 2(1), pages 64-70, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:130:y:2011:i:1:p:96-103. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.