IDEAS home Printed from https://ideas.repec.org/a/eee/jrpoli/v38y2013i4p591-597.html
   My bibliography  Save this article

A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams

Author

Listed:
  • Asad, Mohammad Waqar Ali
  • Dimitrakopoulos, Roussos

Abstract

Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple processing streams of an open pit mining complex. An optimal cutoff grade strategy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and marketing/refining capacity constraints. Even though, the quantities of material flowing from the mine to the market are influenced by the expected variation in the available metal content or inherent uncertainty in the supply of ore, the majority of cutoff grade optimization models not only disregard this aspect and may lead to unrealistic cash flows, but also they are limited in application to an open pit mining operation with single processing facility. The model proposed herein determines the optimal cutoff grade policy based on a stochastic framework that accounts for uncertainty in supply of ore to the multiple ore processing streams. An application on a large-scale open pit mining operation develops a unique cutoff grade policy along with a portfolio of mining, processing, and marketing/refining rates. Owing to the geological uncertainty, the approach addresses risk by showing a difference of 14% between the minimum and maximum production rates, cash flows and NPV.

Suggested Citation

  • Asad, Mohammad Waqar Ali & Dimitrakopoulos, Roussos, 2013. "A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams," Resources Policy, Elsevier, vol. 38(4), pages 591-597.
  • Handle: RePEc:eee:jrpoli:v:38:y:2013:i:4:p:591-597
    DOI: 10.1016/j.resourpol.2013.09.008
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0301420713000792
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.resourpol.2013.09.008?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Osanloo, M. & Rashidinejad, F. & Rezai, B., 2008. "Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits," Resources Policy, Elsevier, vol. 33(4), pages 222-229, December.
    2. Dimitrakopoulos, Roussos G. & Abdel Sabour, Sabry A., 2007. "Evaluating mine plans under uncertainty: Can the real options make a difference?," Resources Policy, Elsevier, vol. 32(3), pages 116-125, September.
    3. Waqar Ali Asad, Mohammad & Dimitrakopoulos, Roussos, 2012. "Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles," Resources Policy, Elsevier, vol. 37(1), pages 81-89.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Paithankar, Amol & Chatterjee, Snehamoy & Goodfellow, Ryan & Asad, Mohammad Waqar Ali, 2020. "Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation," Resources Policy, Elsevier, vol. 66(C).
    2. Lin, Jingsi & Asad, Mohammad Waqar Ali & Topal, Erkan & Chang, Ping & Huang, Jinxin & Lin, Wei, 2024. "A novel model for sustainable production scheduling of an open-pit mining complex considering waste encapsulation," Resources Policy, Elsevier, vol. 91(C).
    3. Del Castillo, Maria Fernanda & Dimitrakopoulos, Roussos, 2016. "A multivariate destination policy for geometallurgical variables in mineral value chains using coalition-formation clustering," Resources Policy, Elsevier, vol. 50(C), pages 322-332.
    4. Paithankar, Amol & Chatterjee, Snehamoy & Goodfellow, Ryan, 2021. "Open-pit mining complex optimization under uncertainty with integrated cut-off grade based destination policies," Resources Policy, Elsevier, vol. 70(C).
    5. Armstrong, Margaret & Lagos, Tomas & Emery, Xavier & Homem-de-Mello, Tito & Lagos, Guido & Sauré, Denis, 2021. "Adaptive open-pit mining planning under geological uncertainty," Resources Policy, Elsevier, vol. 72(C).
    6. Ahmadi, Mohammad Reza & Bazzazi, Abbas Aghajani, 2019. "Cutoff grades optimization in open pit mines using meta-heuristic algorithms," Resources Policy, Elsevier, vol. 60(C), pages 72-82.
    7. Ahmadi, Mohammad Reza & Shahabi, Reza Shakoor, 2018. "Cutoff grade optimization in open pit mines using genetic algorithm," Resources Policy, Elsevier, vol. 55(C), pages 184-191.
    8. Khan, Asif & Asad, Mohammad Waqar Ali, 2019. "A method for optimal cut-off grade policy in open pit mining operations under uncertain supply," Resources Policy, Elsevier, vol. 60(C), pages 178-184.
    9. Mai, Ngoc Luan & Topal, Erkan & Erten, Oktay & Sommerville, Bruce, 2019. "A new risk-based optimisation method for the iron ore production scheduling using stochastic integer programming," Resources Policy, Elsevier, vol. 62(C), pages 571-579.
    10. Biswas, Pritam & Sinha, Rabindra Kumar & Sen, Phalguni & Rajpurohit, Sohan Singh, 2020. "Determination of optimum cut-off grade of an open-pit metalliferous deposit under various limiting conditions using a linearly advancing algorithm derived from dynamic programming," Resources Policy, Elsevier, vol. 66(C).
    11. Biswas, Pritam & Sinha, Rabindra Kumar & Sen, Phalguni, 2023. "A review of state-of-the-art techniques for the determination of the optimum cut-off grade of a metalliferous deposit with a bibliometric mapping in a surface mine planning context," Resources Policy, Elsevier, vol. 83(C).
    12. Khan, Asif & Asad, Mohammad Waqar Ali, 2021. "A mixed integer programming based cut-off grade model for open-pit mining of complex poly-metallic resources," Resources Policy, Elsevier, vol. 72(C).
    13. Zhang, Hong & Nguyen, Hoang & Bui, Xuan-Nam & Nguyen-Thoi, Trung & Bui, Thu-Thuy & Nguyen, Nga & Vu, Diep-Anh & Mahesh, Vinyas & Moayedi, Hossein, 2020. "Developing a novel artificial intelligence model to estimate the capital cost of mining projects using deep neural network-based ant colony optimization algorithm," Resources Policy, Elsevier, vol. 66(C).
    14. Asad, Mohammad Waqar Ali & Qureshi, Muhammad Asim & Jang, Hyongdoo, 2016. "A review of cut-off grade policy models for open pit mining operations," Resources Policy, Elsevier, vol. 49(C), pages 142-152.
    15. Jyrki Savolainen & Ramin Rakhsha & Richard Durham, 2022. "Simulation-based decision-making system for optimal mine production plan selection," Mineral Economics, Springer;Raw Materials Group (RMG);Luleå University of Technology, vol. 35(2), pages 267-281, June.
    16. Rahimi, Esmaeil & Ghasemzadeh, Hasan, 2015. "A new algorithm to determine optimum cut-off grades considering technical, economical, environmental and social aspects," Resources Policy, Elsevier, vol. 46(P1), pages 51-63.
    17. Zhang, Jian & Dimitrakopoulos, Roussos G., 2017. "A dynamic-material-value-based decomposition method for optimizing a mineral value chain with uncertainty," European Journal of Operational Research, Elsevier, vol. 258(2), pages 617-625.
    18. Rahimi, Esmaeil & Akbari, Afshin, 2016. "Application of KKT in determining the final destination of mined material in multi-processing mines," Resources Policy, Elsevier, vol. 50(C), pages 10-18.
    19. Barry King & Alexandra Newman, 2018. "Optimizing the Cutoff Grade for an Operational Underground Mine," Interfaces, INFORMS, vol. 48(4), pages 357-371, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Waqar Ali Asad, Mohammad & Dimitrakopoulos, Roussos, 2012. "Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles," Resources Policy, Elsevier, vol. 37(1), pages 81-89.
    2. Khan, Asif & Asad, Mohammad Waqar Ali, 2021. "A mixed integer programming based cut-off grade model for open-pit mining of complex poly-metallic resources," Resources Policy, Elsevier, vol. 72(C).
    3. Kuangyuan Zhang & Richard Olawoyin & Antonio Nieto & Andrew N. Kleit, 2018. "Risk of commodity price, production cost and time to build in resource economics," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 20(6), pages 2521-2544, December.
    4. Savolainen, Jyrki, 2016. "Real options in metal mining project valuation: Review of literature," Resources Policy, Elsevier, vol. 50(C), pages 49-65.
    5. Azimi, Yousuf & Osanloo, Morteza & Esfahanipour, Akbar, 2013. "An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection," Resources Policy, Elsevier, vol. 38(2), pages 212-223.
    6. Chatterjee, Snehamoy & Sethi, Manas Ranjan & Asad, Mohammad Waqar Ali, 2016. "Production phase and ultimate pit limit design under commodity price uncertainty," European Journal of Operational Research, Elsevier, vol. 248(2), pages 658-667.
    7. Xiao, Chang & Florescu, Ionut & Zhou, Jinsheng, 2020. "A comparison of pricing models for mineral rights: Copper mine in China," Resources Policy, Elsevier, vol. 65(C).
    8. Biswas, Pritam & Sinha, Rabindra Kumar & Sen, Phalguni, 2023. "A review of state-of-the-art techniques for the determination of the optimum cut-off grade of a metalliferous deposit with a bibliometric mapping in a surface mine planning context," Resources Policy, Elsevier, vol. 83(C).
    9. Rahimi, Esmaeil & Akbari, Afshin, 2016. "Application of KKT in determining the final destination of mined material in multi-processing mines," Resources Policy, Elsevier, vol. 50(C), pages 10-18.
    10. Lin Zhao & Sweder van Wijnbergen, 2013. "A Real Option Perspective on Valuing Gas Fields," Tinbergen Institute Discussion Papers 13-126/VI/DSF60, Tinbergen Institute.
    11. Auger, Felipe & Ignacio Guzmán, Juan, 2010. "How rational are investment decisions in the copper industry?," Resources Policy, Elsevier, vol. 35(4), pages 292-300, December.
    12. Tabesh, Mohammad & Moradi Afrapoli, Ali & Askari-Nasab, Hooman, 2023. "A two-stage simultaneous optimization of NPV and throughput in production planning of open pit mines," Resources Policy, Elsevier, vol. 80(C).
    13. Bogdan Rębiasz & Bartłomiej Gaweł & Iwona Skalna, 2017. "Valuing managerial flexibility. An application of real-option theory to steel industry investments," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 27(2), pages 91-111.
    14. Miranda, Oscar & Brandão, Luiz E. & Lazo Lazo, Juan, 2017. "A dynamic model for valuing flexible mining exploration projects under uncertainty," Resources Policy, Elsevier, vol. 52(C), pages 393-404.
    15. Jyrki Savolainen & Ramin Rakhsha & Richard Durham, 2022. "Simulation-based decision-making system for optimal mine production plan selection," Mineral Economics, Springer;Raw Materials Group (RMG);Luleå University of Technology, vol. 35(2), pages 267-281, June.
    16. Rahimi, Esmaeil & Ghasemzadeh, Hasan, 2015. "A new algorithm to determine optimum cut-off grades considering technical, economical, environmental and social aspects," Resources Policy, Elsevier, vol. 46(P1), pages 51-63.
    17. Asad, Mohammad Waqar Ali & Qureshi, Muhammad Asim & Jang, Hyongdoo, 2016. "A review of cut-off grade policy models for open pit mining operations," Resources Policy, Elsevier, vol. 49(C), pages 142-152.
    18. Ajak, Ajak Duany & Topal, Erkan, 2015. "Real option in action: An example of flexible decision making at a mine operational level," Resources Policy, Elsevier, vol. 45(C), pages 109-120.
    19. Alipour, Aref & Khodaiari, Ali Asghar & Jafari, Ahmad & Tavakkoli-Moghaddam, Reza, 2022. "An integrated approach to open-pit mines production scheduling," Resources Policy, Elsevier, vol. 75(C).
    20. Inthavongsa, Inthanongsone & Drebenstedt, Carsten & Bongaerts, Jan & Sontamino, Phongpat, 2016. "Real options decision framework: Strategic operating policies for open pit mine planning," Resources Policy, Elsevier, vol. 47(C), pages 142-153.

    More about this item

    Keywords

    Stochastic optimization; Cutoff grade; Heuristic algorithms; Open pit mine planning;
    All these keywords.

    JEL classification:

    • Q - Agricultural and Natural Resource Economics; Environmental and Ecological Economics

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jrpoli:v:38:y:2013:i:4:p:591-597. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/inca/30467 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.