Planned lead times optimization for multi-level assembly systems under uncertainties
Author
Abstract
Suggested Citation
DOI: 10.1016/j.omega.2017.11.004
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Golini, Ruggero & Kalchschmidt, Matteo, 2011. "Moderating the impact of global sourcing on inventories through supply chain management," International Journal of Production Economics, Elsevier, vol. 133(1), pages 86-94, September.
- Ramesh Bollapragada & Saravanan Kuppusamy & Uday S. Rao, 2015. "Component procurement and end product assembly in an uncertain supply and demand environment," International Journal of Production Research, Taylor & Francis Journals, vol. 53(3), pages 969-982, February.
- Arda, Yasemin & Hennet, Jean-Claude, 2006. "Inventory control in a multi-supplier system," International Journal of Production Economics, Elsevier, vol. 104(2), pages 249-259, December.
- Heng Kuang & S. Jack Hu & Jeonghan Ko, 2016. "A dynamic programming approach to integrated assembly planning and supplier assignment with lead time constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 54(9), pages 2691-2708, May.
- Louly, Mohamed-Aly Ould & Dolgui, Alexandre, 2009. "Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm," European Journal of Operational Research, Elsevier, vol. 199(3), pages 723-731, December.
- Zümbül Atan & Ton de Kok & Nico P. Dellaert & Richard van Boxel & Fred Janssen, 2016. "Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems," Manufacturing & Service Operations Management, INFORMS, vol. 18(1), pages 122-140, February.
- Borodin, Valeria & Dolgui, Alexandre & Hnaien, Faicel & Labadie, Nacima, 2016. "Component replenishment planning for a single-level assembly system under random lead times: A chance constrained programming approach," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 79-86.
- Bandaly, Dia & Satir, Ahmet & Shanker, Latha, 2016. "Impact of lead time variability in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 180(C), pages 88-100.
- Chandra, Charu & Grabis, Janis, 2008. "Inventory management with variable lead-time dependent procurement cost," Omega, Elsevier, vol. 36(5), pages 877-887, October.
- Mohebbi, E. & Choobineh, F., 2005. "The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty," Omega, Elsevier, vol. 33(6), pages 472-482, December.
- Barbara B. Flynn & Xenophon Koufteros & Guanyi Lu, 2016. "On Theory in Supply Chain Uncertainty and its Implications for Supply Chain Integration," Journal of Supply Chain Management, Institute for Supply Management, vol. 52(3), pages 3-27, July.
- Petrovic, Dobrila & Roy, Rajat & Petrovic, Radivoj, 1998. "Modelling and simulation of a supply chain in an uncertain environment," European Journal of Operational Research, Elsevier, vol. 109(2), pages 299-309, September.
- May, Benjamin Isaac & Atkinson, Michael P. & Ferrer, Geraldo, 2017. "Applying inventory classification to a large inventory management system," Journal of Operations and Supply Chain Management (JOSCM), Fundação Getulio Vargas, Escola de Administração de Empresas de São Paulo (FGV EAESP), vol. 10(1), June.
- Louly, Mohamed-Aly & Dolgui, Alexandre, 2013. "Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 143(1), pages 35-40.
- Revilla, Elena & Sáenz, María Jesús, 2014. "Supply chain disruption management: Global convergence vs national specificity," Journal of Business Research, Elsevier, vol. 67(6), pages 1123-1135.
- Tang, Ou & Grubbstrom, Robert W., 2003. "The detailed coordination problem in a two-level assembly system with stochastic lead times," International Journal of Production Economics, Elsevier, vol. 81(1), pages 415-429, January.
- Yoo, Seung Ho & Shin, Hojung & Park, Myung-Sub, 2015. "New product development and the effect of supplier involvement," Omega, Elsevier, vol. 51(C), pages 107-120.
- Faicel Hnaien & Alexandre Dolgui & Desheng Dash Wu, 2016. "Single-period inventory model for one-level assembly system with stochastic lead times and demand," International Journal of Production Research, Taylor & Francis Journals, vol. 54(1), pages 186-203, January.
- Louly, Mohamed-Aly & Dolgui, Alexandre & Hnaien, Faicel, 2008. "Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint," International Journal of Production Economics, Elsevier, vol. 115(1), pages 236-247, September.
- Lawrence V. Snyder & Zümbül Atan & Peng Peng & Ying Rong & Amanda J. Schmitt & Burcu Sinsoysal, 2016. "OR/MS models for supply chain disruptions: a review," IISE Transactions, Taylor & Francis Journals, vol. 48(2), pages 89-109, February.
- Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C., 2006. "Models for production planning under uncertainty: A review," International Journal of Production Economics, Elsevier, vol. 103(1), pages 271-285, September.
- Candace Arai Yano, 1987. "Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs," Management Science, INFORMS, vol. 33(1), pages 95-106, January.
- Jing-Sheng Song & Candace A. Yano & Panupol Lerssrisuriya, 2000. "Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 287-296, July.
- Farahani, Reza Zanjirani & Rezapour, Shabnam & Drezner, Tammy & Fallah, Samira, 2014. "Competitive supply chain network design: An overview of classifications, models, solution techniques and applications," Omega, Elsevier, vol. 45(C), pages 92-118.
- Fiala, P., 2005. "Information sharing in supply chains," Omega, Elsevier, vol. 33(5), pages 419-423, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Li, Xiaoming, 2023. "A two-level policy for controlling an epidemic and its dynamics," Omega, Elsevier, vol. 115(C).
- Jansen, Sjors & Atan, Zümbül & Adan, Ivo & Kok, Ton de, 2019. "Setting optimal planned leadtimes in configure-to-order assembly systems," European Journal of Operational Research, Elsevier, vol. 273(2), pages 585-595.
- Slama, Ilhem & Ben-Ammar, Oussama & Thevenin, Simon & Dolgui, Alexandre & Masmoudi, Faouzi, 2022. "Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1183-1198.
- Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
- Sinha, Priyank & Kumar, Sameer & Chandra, Charu, 2023. "Strategies for ensuring required service level for COVID-19 herd immunity in Indian vaccine supply chain," European Journal of Operational Research, Elsevier, vol. 304(1), pages 339-352.
- Oussama Ben-Ammar & Belgacem Bettayeb & Alexandre Dolgui, 2019. "Integrated production planning and quality control for linear production systems under uncertainties of cycle time and finished product quality," Post-Print hal-02415341, HAL.
- Liu, Liming & Xu, He & Zhu, Stuart X., 2020. "Push verse pull: Inventory-leadtime tradeoff for managing system variability," European Journal of Operational Research, Elsevier, vol. 287(1), pages 119-132.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
- Louly, Mohamed-Aly & Dolgui, Alexandre, 2011. "Optimal time phasing and periodicity for MRP with POQ policy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 76-86, May.
- Louly, Mohamed-Aly & Dolgui, Alexandre & Hnaien, Faicel, 2008. "Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint," International Journal of Production Economics, Elsevier, vol. 115(1), pages 236-247, September.
- Louly, Mohamed-Aly & Dolgui, Alexandre, 2012. "A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 140(2), pages 778-781.
- Faicel Hnaien & Alexandre Dolgui & Desheng Dash Wu, 2016. "Single-period inventory model for one-level assembly system with stochastic lead times and demand," International Journal of Production Research, Taylor & Francis Journals, vol. 54(1), pages 186-203, January.
- Manuel Díaz-Madroñero & Josefa Mula & Mariano Jiménez & David Peidro, 2017. "A rolling horizon approach for material requirement planning under fuzzy lead times," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2197-2211, April.
- Borodin, Valeria & Dolgui, Alexandre & Hnaien, Faicel & Labadie, Nacima, 2016. "Component replenishment planning for a single-level assembly system under random lead times: A chance constrained programming approach," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 79-86.
- Wei Xu & Dong-Ping Song, 2022. "Integrated optimisation for production capacity, raw material ordering and production planning under time and quantity uncertainties based on two case studies," Operational Research, Springer, vol. 22(3), pages 2343-2371, July.
- Slama, Ilhem & Ben-Ammar, Oussama & Thevenin, Simon & Dolgui, Alexandre & Masmoudi, Faouzi, 2022. "Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1183-1198.
- Yin, Zhe & Wang, Chen & Yin, Qian, 2018. "Coordinating overseas and local sourcing through a capacitated expediting transportation policy," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 258-271.
- Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
- Louly, Mohamed-Aly & Dolgui, Alexandre, 2013. "Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 143(1), pages 35-40.
- Gel, Esma S. & Salman, F. Sibel, 2022. "Dynamic ordering decisions with approximate learning of supply yield uncertainty," International Journal of Production Economics, Elsevier, vol. 243(C).
- Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
- Shi Chen & Hau Lee, 2017. "Incentive Alignment and Coordination of Project Supply Chains," Management Science, INFORMS, vol. 63(4), pages 1011-1025, April.
- Polo, Andrés & Peña, Numar & Muñoz, Dairo & Cañón, Adrián & Escobar, John Willmer, 2019. "Robust design of a closed-loop supply chain under uncertainty conditions integrating financial criteria," Omega, Elsevier, vol. 88(C), pages 110-132.
- Fattahi, Mohammad & Govindan, Kannan & Keyvanshokooh, Esmaeil, 2017. "Responsive and resilient supply chain network design under operational and disruption risks with delivery lead-time sensitive customers," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 101(C), pages 176-200.
- Snoeck, André & Udenio, Maximiliano & Fransoo, Jan C., 2019. "A stochastic program to evaluate disruption mitigation investments in the supply chain," European Journal of Operational Research, Elsevier, vol. 274(2), pages 516-530.
- Kanokporn Kungwalsong & Abraham Mendoza & Vasanth Kamath & Subramanian Pazhani & Jose Antonio Marmolejo-Saucedo, 2022. "An application of interactive fuzzy optimization model for redesigning supply chain for resilience," Annals of Operations Research, Springer, vol. 315(2), pages 1803-1839, August.
- Dimitris Zissis, 2023. "Information sharing through digitalisation in decentralised supply chains," Annals of Operations Research, Springer, vol. 327(2), pages 763-778, August.
More about this item
Keywords
Multi-level assembly systems; Assemble-to-order; Assembly contracting; Stochastic lead-times; Planned lead times optimization; Stochastic modeling; Branch and bound;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:78:y:2018:i:c:p:39-56. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.