IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v218y2012i1p152-162.html
   My bibliography  Save this article

Optimizing reliability and service parts logistics for a time-varying installed base

Author

Listed:
  • Jin, Tongdan
  • Tian, Yu

Abstract

Performance based contracting (PBC) emerges as a new after-sales service practice to support the operation and maintenance of capital equipment or systems. Under the PBC framework, the goal of the study is to increase the system operational availability while minimizing the logistics footprint through the design for reliability. We consider the situation where the number of installed systems randomly increases over the planning horizon, resulting in a non-stationary maintenance and repair demand. Renewal equation and Poisson process are used to estimate the aggregate fleet failures. We propose a dynamic stocking policy that adaptively replenishes the inventory to meet the time-varying parts demand. An optimization model is formulated and solved under a multi-phase adaptive inventory control policy. The study provides theoretical insights into the performance-driven service operation in the context of changing system fleet size due to new installations. Trade-offs between reliability design and inventory level are examined and compared in various shipment scenarios. Numerical examples drawn from semiconductor equipment industry are used to demonstrate the applicability and the performance of the proposed method.

Suggested Citation

  • Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
  • Handle: RePEc:eee:ejores:v:218:y:2012:i:1:p:152-162
    DOI: 10.1016/j.ejor.2011.10.026
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221711009465
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2011.10.026?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
    2. Omprakash K. Gupta & A. Ravindran, 1985. "Branch and Bound Experiments in Convex Nonlinear Integer Programming," Management Science, INFORMS, vol. 31(12), pages 1533-1546, December.
    3. Biswajit Sarkar & Kripasindhu Chaudhuri & Shib Sankar Sana, 2010. "A stock-dependent inventory model in an imperfect production process," International Journal of Procurement Management, Inderscience Enterprises Ltd, vol. 3(4), pages 361-378.
    4. Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
    5. Diaz, Angel & Fu, Michael C., 1997. "Models for multi-echelon repairable item inventory systems with limited repair capacity," European Journal of Operational Research, Elsevier, vol. 97(3), pages 480-492, March.
    6. Stephen C. Graves & Sean P. Willems, 2008. "Strategic Inventory Placement in Supply Chains: Nonstationary Demand," Manufacturing & Service Operations Management, INFORMS, vol. 10(2), pages 278-287, March.
    7. Sana, Shib Sankar, 2010. "A production-inventory model in an imperfect production process," European Journal of Operational Research, Elsevier, vol. 200(2), pages 451-464, January.
    8. Murthy, D. N. P. & Solem, O. & Roren, T., 2004. "Product warranty logistics: Issues and challenges," European Journal of Operational Research, Elsevier, vol. 156(1), pages 110-126, July.
    9. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    10. Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2010. "Optimization of component reliability in the design phase of capital goods," European Journal of Operational Research, Elsevier, vol. 205(3), pages 615-624, September.
    11. Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
    12. M N Jalil & R A Zuidwijk & M Fleischmann & Jo A E E van Nunen, 2011. "Spare parts logistics and installed base information," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(3), pages 442-457, March.
    13. D Nowicki & U D Kumar & H J Steudel & D Verma, 2008. "Spares provisioning under performance-based logistics contract: profit-centric approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(3), pages 342-352, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    2. Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
    3. Patra, Pradipta & Kumar, U. Dinesh & Nowicki, David R. & Randall, Wesley S., 2019. "Effective management of performance-based contracts for sustainment dominant systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 369-382.
    4. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    5. Shuai Zhang & Kai Huang & Yufei Yuan, 2021. "Spare Parts Inventory Management: A Literature Review," Sustainability, MDPI, vol. 13(5), pages 1-23, February.
    6. Hekimoğlu, Mustafa & Karlı, Deniz, 2023. "Modeling repair demand in existence of a nonstationary installed base," International Journal of Production Economics, Elsevier, vol. 263(C).
    7. Godoy, David R. & Pascual, Rodrigo & Knights, Peter, 2014. "A decision-making framework to integrate maintenance contract conditions with critical spares management," Reliability Engineering and System Safety, Elsevier, vol. 131(C), pages 102-108.
    8. Van der Auweraer, Sarah & Zhu, Sha & Boute, Robert N., 2021. "The value of installed base information for spare part inventory control," International Journal of Production Economics, Elsevier, vol. 239(C).
    9. Qianru Ge & Willem van Jaarsveld & Zümbül Atan, 2020. "Optimal redesign decisions through failure rate estimates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(4), pages 254-271, June.
    10. Minjae Park & Ki Mun Jung & Dong Ho Park, 2016. "Optimal warranty policies considering repair service and replacement service under the manufacturer’s perspective," Annals of Operations Research, Springer, vol. 244(1), pages 117-132, September.
    11. Wang, Yulan & Wallace, Stein W. & Shen, Bin & Choi, Tsan-Ming, 2015. "Service supply chain management: A review of operational models," European Journal of Operational Research, Elsevier, vol. 247(3), pages 685-698.
    12. Van der Auweraer, Sarah & Boute, Robert N. & Syntetos, Aris A., 2019. "Forecasting spare part demand with installed base information: A review," International Journal of Forecasting, Elsevier, vol. 35(1), pages 181-196.
    13. Ge, Qianru & Peng, Hao & van Houtum, Geert-Jan & Adan, Ivo, 2018. "Reliability optimization for series systems under uncertain component failure rates in the design phase," International Journal of Production Economics, Elsevier, vol. 196(C), pages 163-175.
    14. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    15. Rohit Kapoor & Bhavin J. Shah, 2016. "Simulation model for closed loop repairable parts inventory system with service level performance measures," International Journal of Services and Operations Management, Inderscience Enterprises Ltd, vol. 23(1), pages 18-42.
    16. Huber, Sebastian & Spinler, Stefan, 2012. "Pricing of full-service repair contracts," European Journal of Operational Research, Elsevier, vol. 222(1), pages 113-121.
    17. Bei, Xiaoqiang & Zhu, Xiaoyan & Coit, David W., 2019. "A risk-averse stochastic program for integrated system design and preventive maintenance planning," European Journal of Operational Research, Elsevier, vol. 276(2), pages 536-548.
    18. Cruz, Antonio Miguel & Haugan, Gregory L. & Rincon, Adriana Maria Rios, 2014. "The effects of asset specificity on maintenance financial performance: An empirical application of Transaction Cost Theory to the medical device maintenance field," European Journal of Operational Research, Elsevier, vol. 237(3), pages 1037-1053.
    19. Westerweel, Bram & Basten, Rob J.I. & van Houtum, Geert-Jan, 2018. "Traditional or Additive Manufacturing? Assessing Component Design Options through Lifecycle Cost Analysis," European Journal of Operational Research, Elsevier, vol. 270(2), pages 570-585.
    20. Kim, T.Y. & Dekker, R. & Heij, C., 2016. "Spare part demand forecasting for consumer goods using installed base information," Econometric Institute Research Papers EI2016-11, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    21. Korkeamäki, Lauri & Kohtamäki, Marko & Parida, Vinit, 2021. "Worth the risk? The profit impact of outcome-based service offerings for manufacturing firms," Journal of Business Research, Elsevier, vol. 131(C), pages 92-102.
    22. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    2. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    3. Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
    4. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
    5. Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
    6. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    7. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    8. Mirzahosseinian, H. & Piplani, R., 2011. "A study of repairable parts inventory system operating under performance-based contract," European Journal of Operational Research, Elsevier, vol. 214(2), pages 256-261, October.
    9. Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.
    10. Patra, Pradipta & Kumar, U. Dinesh & Nowicki, David R. & Randall, Wesley S., 2019. "Effective management of performance-based contracts for sustainment dominant systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 369-382.
    11. Dombi, József & Jónás, Tamás & Tóth, Zsuzsanna Eszter, 2018. "Modeling and long-term forecasting demand in spare parts logistics businesses," International Journal of Production Economics, Elsevier, vol. 201(C), pages 1-17.
    12. Frank Schneider & Ulrich W. Thonemann & Diego Klabjan, 2018. "Optimization of Battery Charging and Purchasing at Electric Vehicle Battery Swap Stations," Transportation Science, INFORMS, vol. 52(5), pages 1211-1234, October.
    13. Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
    14. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    15. Al-Rifai, Mohammad H. & Rossetti, Manuel D., 2007. "An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory system," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 195-213, September.
    16. García-Benito, Juan Carlos & Martín-Peña, María-Luz, 2021. "A redistribution model with minimum backorders of spare parts: A proposal for the defence sector," European Journal of Operational Research, Elsevier, vol. 291(1), pages 178-193.
    17. Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
    18. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    19. Yoon, Kyung Bok & Sohn, So Young, 2007. "Finding the optimal CSP inventory level for multi-echelon system in Air Force using random effects regression model," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1076-1085, August.
    20. Lau, Hoong Chuin & Song, Huawei & See, Chuen Teck & Cheng, Siew Yen, 2006. "Evaluation of time-varying availability in multi-echelon spare parts systems with passivation," European Journal of Operational Research, Elsevier, vol. 170(1), pages 91-105, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:218:y:2012:i:1:p:152-162. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.